There's a lot going on over yonder at 11th Street these days, as the initial 11th Street Bridges project continues toward its expected completion next year while the now-funded Phase 2 work is starting to get underway.
I was able to arrange a tour last week (thank you, bridge folks!), and have put together a photo gallery of the most interesting shots.
However, there's a lot going on and so I'm going to break out some of the information here as well. (But go look at the gallery too!)
New Ramps from/to 11th Street Local Bridge
By the end of the month (or maybe even by the end of the week), two new ramps on the 11th Street Local Bridge will open, providing access to southbound I-295 from the local bridge and to the local bridge from northbound DC-295. There are signalized intersections at both ramps, with turns allowed in each direction. And, once construction is finished to make 11th Street two-way from O Street northward, commuters driving north on 295 will be able to use the new ramp to the local bridge to then arrive directly at the Navy Yard's entrance gate at 11th and N.
Southeast Blvd., and Outbound Freeway Traffic
This week saw the first of the lane closures that within a few months will signal the end of the SE Freeway east of 8th Street. Once all lanes are closed, traffic taking the old two-lane flyover to outbound I-695 will be temporarily routed onto the completed-but-not-opened inbound flyover connecting I-695 and I-395. This will allow for the razing of the old outbound flyover, and construction of a new three-lane flyover in the gap between the old and new ones. The filling of the old sunken freeway will also begin, for the new at-grade Southeast Blvd.
Old Outbound Bridge Demolition
The old outbound 11th Street Bridge is now little more than a bunch of old girders, which are starting to be removed. Soon, all that will be left will be the river piers, though two of those will be used to create viewing platforms that will be accessed via walkways from the new 11th Street Local pedestrian path. (And can be reused if anyone ever decides to pony up the millions needed to create the 11th Street Recreation Bridge.) In the meantime, work continues on the downriver edge of the new local bridge, to get it to its full four-lane-plus-ped-path width.
But there's more than just these items and photos. There's photos of the under-construction ramp that in about three months will take traffic from outbound I-695 to northbound DC-295, plus the big piles of dirt waiting to be used to fill in the eastern part of the Southeast Freeway, and the work on the ramp from 11th Street to westbound I-395, and more. So go look at the entire gallery. (I've also incorporated some of the new photos into my 11th Street Bridges project page, to go with the before-and-afters.) I also wrote in more detail about the Phase 2 projects a few months back.
Comments (6)
   
 
 More Recent News

JDLand.com Home

Comments

KLB says: (9/19/12 9:35 AM)
From the "entire gallery" page, "However, once the sunken freeway lanes are closed, traffic currently running to outbound I-695 on the ramp seen at far left will be diverted onto this new flyover, which allows for the demolition of the old two-lane outbound flyover and construction of a new three-lane one."

Will the inbound and outbound traffic share the new inbound ramp, or will it just be outbound traffic until the new outbound flyover is completed?


JD says: (9/19/12 9:39 AM)
Dangit, why did you ask the one question I specifically hoped no one would ask, since I forgot to ask myself? :-) My initial guess is that it would just be outbound traffic until the new flyover is finished, but I honestly don't know. I'll see what I can find out, or maybe before long they'll release actual construction documents instead of the concept ones.


bkt says: (9/19/12 9:56 AM)
JD, Do you know what the plans are for the northbound exit onto 295/695 from Howard Road? I take 295 North from Bolling to Rt 50 and the traffic merging from the right side has to merge over 2 lanes very quickly to the left exits for 695 which leads to complete congestion chaos at rush hour. This seems like a fail to me, but maybe there's another phase coming with a 'fix'???


JD says: (9/19/12 10:57 AM)
@bkt, I have to admit that I don't pay as close attention to the design and issues on the east side of the river, so I don't know specifically in terms of the current 11th Street Bridge construction.

Long term, the real solution is probably the huge new *real* interstate interchange at 295/South Capitol Street/Suitland Parkway, to be built with the new Douglass Bridge.

Short term, I do think that they're hoping the new exit about to open to the 11th Street Local Bridge will at least take traffic going to the Navy Yard out of the two left lanes, which I assume would include some of that Howard Road ramp traffic.

Also, there's going to be a ramp from the east side of the 11th Street Bridge to northbound DC-295 (ramp C-2 on the link below) so that maybe some of the local Anacostia traffic wouldn't be trying to get on at Howard Road, but instead there?

link




Maelstrom says: (9/19/12 11:13 AM)
@KLB - beat me to the question. Personally, I think they could fit everyone on the new flyover without losing capacity, but I don't think they will only do that if they need to tear out the old inbound flyover for the sake of the fill work below. Consider that once you close the old inbound flyover, you have no exits between M street and D street SW on 695/395N. I am somewhat suprised by the announcement that the outbound traffic will be diverted onto the new flyover. It was one of the options I had anticipated, but it's an ugly one because they will have to tear out the shiny new bridge edge that they built between the inbound and outbound freeway bridges and the pile of rocks in between the bridges to divert the traffic. More than the re-purposing of the fill for the off ramp from SE/SW @11th, this is a case where new work will need to be ripped out and re-done later.


terpsichorean says: (9/21/12 9:29 AM)
Hi, I live on upper NE side of the Hill (practically Rosedale). I work in Crystal City, and until Monday I took 17th St and made a left onto the Barney Circle/RFK entrance to get to work every morning. Each day this week I have tried a different route to attempt to cut across the Hill to get to the 3rd St SE entrance, but there seems to be no efficient way to do this (traffic, lights, etc). Does anyone have a recommendation for us NE Hill folks? Should I just start taking 295 to get to 395, and avoid the Hill until the 11th St bridge opens? This has drastically changed my once beautifully short commute. So frustrating...Help!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

walt on Don't Call it: Re: Changes around Nats Park: Today on my way out, I noticed: 1. Installatio...
walt on Don't Call it: Re: rebuilding the senior center. I'm sure there's a good reason for this, so ...
ValveetaChz on Don't Call it: Any word about square 767? There been not one peep from DCHA!
NavyYardGuy on Don't Call it: @JDland -- I get it totally. Go nats!
202_cyclist on Don't Call it: @GarfieldPark-- Yes, someone was saying that we can only speculate who Giuliani ...
GarfieldPark on Don't Call it: As much as I would love to beat the Yankees, I'd rather have the Astros. My fear...
  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 10/17/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/13/19
80 M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/11/19
100 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/10/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/10/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 10/10/19
500 B/O L ST SE   THEFT
Theft First Degree (all Other Larceny)
 10/08/19
1400 B/O 11TH ST SE   ASSAULT WITH A DANGEROUS WEAPON  10/08/19
1200 B/O VAN ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/03/19
1200 SOUTH CAPITOL ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/03/19
1100 B/O HALF ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 10/02/19
800 B/O VIRGINIA AVE SE   ROBBERY
Assault W/i To Commit Robbery (simple Assault)
 10/02/19
700 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/24/19
900 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/23/19
1200 B/O 1ST ST SE   ROBBERY
Assault W/i To Commit Robbery (simple Assault)
 09/23/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/21/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/19/19

Recent Issued Building Permits Archive  
1300 4TH ST SE   
10/07/19 
DFM DEVELOPMENT SERVICES, LLC / ARI BELMONTE; KONE
EN1903394 / SHOP DRAWING
Installation of (2) MRL KONE elevators in single hoistway. 15 Landings.
900 5TH ST SE   
10/08/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / TIMOTHY S CLEMONS; TIMOTHY S CLEMONS
M2000081 / SUPPLEMENTAL
   
10/08/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / RICHARD V CAREY; RICHARD V CAREY
P2000201 / SUPPLEMENTAL
   
10/15/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / WILLIAM B. CRIST; WILLIAM B. CRIST
E2000633 / SUPPLEMENTAL
4 I ST SE   
10/07/19 
CRESECENT CAPITOL VIEW MF LL / KIM MITCHELL; BEN KUNKLE
B1912371 / CONSTRUCTION
Third Party Review - Revision to Permit B1804349 (Approved Under the Velocity Program),Revision associated with additional occupiable spaces provided at the "Roof Floor" with corresponding egress, revised common space layouts and corresponding use and occupancy calculations, revisions to ground floor retail south entrance and amenity spaces at the ground level.
409 I ST SE 20003   
10/11/19 
JOSEPH KOCH / null
P2000322 / SUPPLEMENTAL
409 I ST SE   
09/27/19 
JOSEPH KOCH AND ELLEN FONG / ELIZABETH S MITCHEL; ELIZABETH S MITCHEL
B1915266 / CONSTRUCTION
Interior alteration including new kitchen, master bathroom and loft.
   
10/15/19 
SCOTT A FAULK TRUSTEE / FRED LATIMORE
E2000620 / SUPPLEMENTAL
100 M ST SE 200   
10/09/19 
SQUARE 743 INC / ;
P2000249 / SUPPLEMENTAL
100 M ST SE 7TH FL   
09/26/19 
SQUARE 743 INC / ;
P1909869 / SUPPLEMENTAL
100 M ST SE 7TH FLOOR   
10/03/19 
3NW 100 M STREET LLC / DANNY L COLEY; DANNY L COLEY
E2000146 / SUPPLEMENTAL
100 M ST SE   
09/24/19 
SQUARE 743 INC / PHILIP J. MISEY; PHILIP J. MISEY
E1911913 / SUPPLEMENTAL
   
09/25/19 
SQUARE 743 INC / NAVID PARTOVI; NAVID PARTOVI
M1904391 / SUPPLEMENTAL
   
09/27/19 
SQUARE 743 INC / MIGUEL A. MOROTE; MIGUEL A. MOROTE
E1912028 / SUPPLEMENTAL
250 M ST SE   
09/26/19 
SQUARE 769 LLC / JEFFREY D WOLF
AH1901292 / CONSTRUCTION
After Hours permit is respectfully requested from 3 am to 7 am daily.
   
10/03/19 
SQUARE 769 LLC / STEVEN CHEN
AH2000003 / CONSTRUCTION
Work Onsite Only - Columbus Day
300 M ST SE   
10/01/19 
FEDERAL CENTE LP C/O CHARLES E SMITH / DANI B RADOYE; TBD
B1908440 / CONSTRUCTION
interior build out new tenant into existing space to include installation of cabinetry, flooring, wall base, ceiling system, and light fixtures, hvac system and distribution / difusers, electrical panel / equipment, accessible restrooms,drinking fountain and service sink. First 1st floor only.
   
10/17/19 
FEDERAL CENTER LP / SUKWON KIM; SUKWON KIM; NA
SG1900286 / CONSTRUCTION
To install a set of illuminated LED channel letters on raceway onto wall
139 N ST SE 19714   
10/01/19 
DISTRICT OF COLUMBIA / MIKE BOONE
AH1901332 / CONSTRUCTION
PEPCO-WO#1588714505-ALLEN / EFF / PATRICK-CREWS WILL BE CHANGING A TRANSFORMER.
861 NEW JERSEY AVE SE   
10/09/19 
GRAYSTAR GP 11,LLC / KIM MITCHELL; NA TBD
SH1900078 / CONSTRUCTION
Phase 2 - Excavation and support of excavation within 50' of DC Water Trunk Sewer line include pile installations
1275 NEW JERSEY AVE SE 20003   
10/14/19 
BROOKFIELD PROPERTIES / null
P2000362 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE STE# 102A   
10/17/19 
SQUARE 742 LLC / STEPHEN TAYLOR; CHRIS PADBERG
B1913851 / CONSTRUCTION
Convert 'office' tenant space to 'The UPS Store'. Interior work only. minimum work done. 990 sq ft. No plumbing. Change diffusers and ceiling tiles. Install UPS furniture and add a few outlets.
1100 NEW JERSEY AVE SE   
09/26/19 
SQUARE 742 LLC / ;
P1909863 / SUPPLEMENTAL
   
10/01/19 
SQUARE 742 LLC / SUKWON KIM; SUKWON KIM; JJ ELECTRIC SERVICE, INC
SG1900513 / CONSTRUCTION
To install a set of LED channel letters "SUBWAY"
   
10/17/19 
SQUARE 742 LLC / WILLIAM SNODDY; TBD
B1915102 / CONSTRUCTION
Revision to previous permit number B1911194 Expansion of Tenant's Current suite into Adjacent Suite has already been "white boxed". Expansion space to consist only of workstation and Offices. Some Minor Demolition will occur in tenant existng suite in order to rework existing tenant entry and enlarge tenant reception. addition of storage closet will be added in place of existing corridor.
   
10/17/19 
SQUARE 742 LLC / WILLIAM SNODDY; CHRIS CONDON
B1913780 / CONSTRUCTION
Tenant Finish Out. Existing Conditions to be Demolished and New Space Built to Landlord Standards to Include new Ceiling grid lighting and Finishes **LEVEL 2 ALTERATION
1275 NEW JERSEY AVE SE   
10/03/19 
UNITED STATES OF AMERICA / JUSTIN BELLOW;
SH1900050 / CONSTRUCTION
Sheeting and shoring for new building
1299 NEW JERSEY AVE SE   
09/24/19 
UNITED STATES OF AMERICA / FRED T FALCONE; FREE STATE DRILLING INC
SB1900446 / CONSTRUCTION
Six 7 inch hollow stem auger probe borings to 60ft and the installation of 2.75inch inclinometer casing.
301 TINGEY ST SE C-1   
10/03/19 
SEFC 160, LLC / JEFF NOLD
AH2000017 / CONSTRUCTION
CCTV Inspection of sewer system. on 3rd Street SE btween Tingey St. & Water St.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.