Since January, 2003

Ad by Google
 (a random before-and-after moment)
February 3, 2007
October 19, 2014
2nd (East) at L, Looking North-Northwest (see more)

I mentioned a few weeks ago that it would be happening soon, and indeed, L Street through Canal Park at 2nd Street SE is now open, with the sidewalk on the south side of the street available for pedestrians.
With this access available, K Street has now been temporarily closed to complete its streetscape. Since the park is still on schedule to open in November, it's likely that K Street will reopen by then.
I'd post pictures of the new vistas on L, but I can't stand any more cloudy-day shots of that location (such as this one from my visit inside the fences in late July), so it'll have to wait for the sun to come out.

Comments (8)
 
 More About Canal Park
 All posts: Canal Park

JDLand.com Home

Comments

Erik says: (8/21/12 8:02 AM)
The park would be so much safer for families and pets, and more relaxing if we were to keep K & L streets closed to automobile traffic.


conngs0 says: (8/21/12 1:26 PM)
My understanding is that both K and L Streets will be engineered to slow the flow of traffic. Is that correct? I absolutely appreciate the point that motor vehicle traffic can be hazardous to pedestrians and pets, but perhaps this is worth a try for now in order to avoid some of the negative consequences of closing them down altogether. I'd hate to see the park become a three-block-long barrier to people moving through the neighborhood in order to get to residential buildings and other establishments (including the Park Tavern). In the meantime, Teague Park will also be an option for people to bring their kids and pets in the event they are concerned about traffic (just make sure your Labrador doesn't take a running leap into the Anacostia!).


JD says: (8/21/12 1:42 PM)
You can already see how L Street within the park is much narrower than on either side, and how the streetscape is slightly raised and paved with paving blocks rather than asphalt, all of which are to give drivers the visual heads up to slow down. The fact that cars can't park on K or L within the park will also clear the line of sight for cars to see where people might be waiting to cross.

But, that said, pedestrians will always need to cross carefully.

It's unrealistic to have both streets permanently closed in that spot, forcing all cross-neighborhood traffic onto either I or M.


conngs0 says: (8/21/12 2:45 PM)
Thanks, JD!

I really love that a bar/restaurant will be incorporated into the southern end of the park too. The Park Tavern's existence should keep foot traffic flowing in the park well into the evening hours, which should hopefully cultivate a lively atmosphere in the neighborhood as well as maintain safety. Hopefully it takes off.

But you can't deny that the northern end of Canal Park is going to be pretty sleepy for a couple of years until some of those planned apartment and mixed-use buildings are up and running. That will be nice in the daytime, as some people will want to enjoy some peace and quiet. But hopefully the cross-neighborhood traffic will help keep things illuminated at night (or at least provide the police with better access during patrols).


JD says: (8/21/12 2:48 PM)
Don't forget that the new official entrance for 225 Virginia/200 I is going to be right across from the park's north end, coming this fall. So there will be foot traffic in terms of the office workers and the four DC agencies that will be moving there. And probably security officers guarding that entrance who might also look across the street once in a while. :-)



JES says: (8/22/12 9:57 AM)
I'm kind of on the fence on opening those roads to traffic. Whenever you let traffic into some place, it's very rare to then revoke that vehicle access after the fact, so I'd almost be inclined to leave it pedestrian-only for a while, at least until some of the other buildings are built over there. It seems like people have managed just fine without those roads for a while, right? Why not try to keep it going, and if it doesn't work out once more buildings come online, change it then?


Maelstrom says: (8/22/12 3:45 PM)
I am annoyed that inside of those nice marble curbs on the west side of 2nd place SE they just filled in a bunch of asphalt. Did they run out of paving stones or something? It's ugly >_<! Anyone else notice this? I hope they only did it because they expect it to be torn up for the buildings on between 2nd PL and 3rd St.


David Garber says: (8/23/12 9:54 AM)
The asphalt sidewalks are "temporary" -- that is, until the blocks east of Canal Park are developed. Redevelopment of those blocks by DC Housing and their future development partners would damage or force-replace any fancier paving that might have been installed now, hence the asphalt. The tree pits and light poles will stay.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
Jaybird on The Big Stick: We went for lunch and enjoyed it. Love the baseball bats cut off, and the beer ...
JD on The Big Stick: There is a door into the Stick from its Half Street frontage.
Whatevs on The Big Stick: Technically, there still isn't a restaurant on Half St. SE since the formal addr...
JD on The Big Stick: Mr. JDLand and I did go--I had the polish sausage and he had the half smoke, and...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
200 B/O I ST SE   THEFT F/AUTO
 12/18/14
700 B/O L ST SE   THEFT
2nd Degree
 12/17/14
1200 B/O 1ST ST SE   THEFT
Theft F/Building
 12/08/14
1200 B/O 1ST ST SE   THEFT
 11/21/14
900 B/O 5TH ST SE   BURGLARY
 11/21/14
200 B/O I ST SE   THEFT
 11/21/14
1200 B/O NEW JERSEY AVE SE   THEFT
 11/20/14

Active Public Space Permits Archive  
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15

Recent Issued Building Permits Archive  
1025 1ST ST SE   
12/03/14 
NA NA NA
EHOP1590134 / HOME OCCUPATION
   
12/10/14 
KAREN NZAKIMUENA
PC74349112 / POST CARD
INSTALLATION OF NOT MORE THAN 1 NEW AIR CONDITIONING UNIT UP TO A MAXIMUM OF 10-TONS OF EQUIVALENT REFRIGERATING EFFECT.
1016 3RD ST SE   
12/15/14 
ANAMARIA R MOTTOLA / DIXON
B1502438 / CONSTRUCTION
RENOVATIONS MINOR MEP
1212 4TH ST SE   
12/10/14 
FC 1212 LLC / SCHINDLER ELEVATOR CORP
ER1500593 / SHOP DRAWING
REPLACE MAXTON UC2A VALVE EST. COST OF WORK $ 2 2120. 00
927 5TH ST SE   
12/15/14 
AARON LORENZO
PC25919394 / POST CARD
REPLACEMENT IN KIND OF EXISTING FENCE ON PRIVATE PROPERTY. REPLACEMENT IN KIND WHEN APPLIED TO ARCHITECTURAL FEATURES MEANS REPLACEMENT WITH A FEATURE OF LIKE MATERIAL THAT REPLICATES THE EXISTING FEATURE IN PROPORTION APPEARANCE TEXTURE DESIGN DETAIL AND DIMENSIONS.
1000 5TH ST SE   
12/04/14 
UNITED STATES OF AMERICA / WALTER T JONES
E1501598 / SUPPLEMENTAL
1015 HALF ST SE   
12/10/14 
HALF STREET LLC / ART DISPLAY; BOB BIROONAK ART DISPLAY CO.
SG1400465 / CONSTRUCTION
ONE ILLUMINATED NEWS TICKER SIGN
1201 HALF ST SE   
12/10/14 
WEST HALF 1 LLC / MARK W GIBSON
E1501746 / SUPPLEMENTAL
   
12/12/14 
JASON YORK
TN1500036 / CONSTRUCTION
INSTALLING SMALL TENT ON DEC 29 2014 FOR THE BRIDGESTONE WINTER CLASSIC ON 1-1-15 WITH GENERATOR TENTS REMOVED ON 1-2-15
808 L ST SE   
12/10/14 
NAVY YARD ASSOCIATES LLC / KE-MAURELLE PREDDIE
B1412006 / CONSTRUCTION
NEW OFFICE USE FOR 1254 SQ. FT. EXISTING TWO STORIES PLUS BASEMENT STRUCTURE ON SE / C-3-A ZONING DISTRICT. MECHANICAL ELECTRICAL AND PLUMBING REMAIN AS IS.
80 M ST SE   
12/10/14 
WELLS REIT II 80 M STREET LLC / ANTHONY G SAMBURG
E1501724 / SUPPLEMENTAL
14 M ST SE   
12/16/14 
ROMAN CATHOLIC ARCHBISHOP OF WASHINGTON / PHILLIP B. MOBLEY
FB1500047 / SUPPLEMENTAL
20 M ST SE   
12/04/14 
TRANSWESTERN JEFFREY GROSS / OLLIE READ; TRANSWESTERN JEFFREY GROSS; CHRISTOPHER SCHULZE
AR66514546 / SUPPLEMENTAL
   
12/04/14 
TRANSWESTERN JEFFERY W GROSS / ANDREW ARNTSON; TRANSWESTERN JEFFERY W GROSS; ANDREW ARNTSON
P96600069 / SUPPLEMENTAL
80 M ST SE   
12/03/14 
MARY JACKSON
PC44081129 / POST CARD
REPLACEMENT OF NOT MORE THAN 1 GAS APPLIANCE ON A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
   
12/05/14 
WELLS REIT II 80 M STREET LLC /
P1501746 / SUPPLEMENTAL
100 M ST SE   
12/03/14 
SQUARE 743 INC. / SAM HOLLEN RAMCO OF DC INC.
B1502037 / CONSTRUCTION
INTERIOR RENOVATION TO 4TH FLOOR OFFICE SPACE. SUBDIVIDE TENANT SPACE AND ADD PANTRY. PARTITIONS MEP AND LIFE SAFETY. NORTHWOOD INVESTORS LLC
202 M ST SE   
12/10/14 
DISTRICT OF COLUMBIA / WOODY WICKLIFFE
TN1500035 / CONSTRUCTION
INSTALL 50FT X 100FT TENT NO GENERATORS NO COOKING NO SMOKING NO STAGES 10FT X 70FT TENT INSTALLED DEC 11-15 2014 EVENTS DEC 12-14 2014 12:01PM - 9:00 PM
1201 M ST SE   
12/11/14 
CARLTON RAY
AH1500149 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
75 N ST SE   
12/11/14 
CRANE SERVICE CO / CHRISTINE LONG
AH1500150 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 2:00AM THRU 11:00PM
800 NEW JERSEY AVE SE   
12/08/14 
SQUARE 737 LLC / GLENNWOOD ROGERS
P1501673 / SUPPLEMENTAL
25 POTOMAC AVE SE   
12/02/14 
RIVERFRONT HOLDINGS I LLC C/O ECC INC. / ECC INC.
UT1500007 / CONSTRUCTION
REMOVAL OF ONE 100-GALLON UNDERGROUND STORAGE TANK DURING MASS EXCAVATION ACTIVITIES FOR SITE REDEVELOPMENT.
   
12/03/14 
RIVERFRONT HOLDINGS I LLC / WOODY WICKLIFFE
TN1500032 / CONSTRUCTION
INSTALL 40FT X 80FT TENT NO COOKING NO SMOKING NO PROPANE NO LIGHTING 40FT X 40FT TENT 2 GENERATORS 25KW EACH 20FT X 20FT TENT 8FT X 20FT PLATFORM 40FT X 40FT PLATFORM 20FT X 20FT PLATFORM INSTALLED DEC 8 -9 2014 EVENT DEC 9 2014 9AM - 4PM
   
12/05/14 
FLORIDA ROCK PROPERTIES INC / ROBERT S. WATTS
E1501658 / SUPPLEMENTAL
   
12/05/14 
RIVERFRONT INVESTMENT PARTNERS / JASON BENTLEY
B1408697 / CONSTRUCTION
CONSTRUCTION OF NEW 9 STORY BUILDING. THIRD PARTY REVIEW
1500 SOUTH CAPITOL ST SE   
12/18/14 
NATIONALS PARK / MARK W GIBSON
E1501975 / SUPPLEMENTAL
300 TINGEY ST SE   
12/15/14 
FC BOILERMAKER LLC / GREGORY BIRCKHEAD; FC BOILERMAKER LLC; MICHAEL BELL
E55526822 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.