Since January, 2003
            
 (a random before-and-after moment)
May 6, 2008
April 14, 2018
2nd (West) at L, Looking North-Northeast (see more)

In a newsletter released last week, the Marine Corps announced that a recent relaxation of the Department of Defense's force protection requirements means that the never-ending quest for space for a new Marine Bachelor Enlisted Quarters (BEQ) can now be based on the need for a 66-foot standoff distance between any new building and nearby parking/roads instead of the 82-foot standoff that the Marines had been trying to work with up to now.
This means less land would be needed for both the new BEQ and additional support facilities, though the total amount is dependent on what exactly the Marines end up building. A joint eight-story BEQ and support facilities would need approximately 1.6 acres of land, while separating the two needs could mean something closer to two acres if a five-story BEQ is built.
While this is important news from a neighborhood/urban design standpoint, it also impacts the amount of land the Marines may need to, ahem, "acquire" in order to build the BEQ. Early in the search process, it had been hoped that a public-private development partnership could be arranged so that the Marines would not have to take land by eminent domain, but it was announced in April that "federal land acquisition will be unavoidable as a result of recent unforeseen changes in policy and a less favorable funding outlook." And, because of the requirement that the new BEQ and support facilities be within 2,000 feet of the main post at 8th and I, various blocks south of the freeway on and near Lower Barracks Row have long been the sites the Marines have been eyeing as possibilities.
At that time, the Marines said that the EIS would evaluate the two blocks along the east side of 8th between Virginia and Potomac Avenues (Squares 929/930) along with the old Exxon site at 11th and M (Square 976). It was also said that the existing "Annex site" at 7th and Virginia was ruled out for the 100,000 square feet of housing but that it could be used for the needed 60,000 square feet of support space, but one does wonder whether the setback requirement change can return the Annex site back into the mix.
As also announced back in April, the Marines will be preparing an Environmental Impact Statement to both evaluate potential locations for the new BEQ complex as well as the reuse of the current Building 20 barracks on I Street SE. It had been hoped that the formal Notice of Intent for the EIS would have been happening about now, but the new newsletter says this will be delayed until winter. There will then be the attendant public meetings and whatnot.
If you're joining this story late, feel free to read my many posts from the past two years on the evolving BEQ site search, because I really can't bear to try to summarize it all AGAIN. You can also browse the official project web site for lots of materials from the process.
(via WBJ)
Comments (2)
   
 
 More About Barracks
 All posts: Barracks, Development News

JDLand.com Home

Comments

Gamble Rogers says: (8/21/12 10:59 PM)
This is good news, JD. No matter where the Marines decide to build, this development will only improve Lower Eighth Street. The new setback requirement could make the former Exxon site more attractive as a residential tower, especially if the Marines buy out the animal control clinic and businesses on 10th Street SE. The Marines could also request more land and security by asking the city to close the intersection of Potomac Avenue SE and 11th Street SE. Right now, Potomac Avenue is a speedway for folks cutting between 8th and 11th. If the Marines asked the city to cede one block of Potomac between 10th and 11th, and even the "non-dog-park-dog-park," perhaps they could compensate by funding improvements to Virginia Avenue park, including a larger, official dog park. That's one possibility that would have minimal impact on the neighborhood, would fall outside the Capitol Hill overlay, and could provide benefits to all parties.

Of course, the CDPs would go crazy -- but a man can dream, can't he?


Andrew in DC says: (8/24/12 10:59 AM)
"this development will only improve Lower Eighth Street"

I don't understand this assertion. Roping off more land to shuffle around existing bodies in the area will somehow "improve" lower 8th by evicting current residents and eliminating any future potential for additional near-term development?

This is not a benefit. Especially with the Marines asserting they're going to hold on to their old building and not yield _that_ back to the city, either. All it means is that a chunk of land becomes indefinitely off limits to the resident population. It is, at best, net-neutral.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

CJBabyDaddy on Catching Up on: The initial Maxwell/Albi PR launch described their future joint location as bein...
Alex B. on CSX East Three-Building: I don't see how the canal's lack of presence reflects a lack of history. The big...
CJBabyDaddy on CSX East Three-Building: Many unexecuted plans have the advantage of being perfect in someone‘s eyes, and...
rdotis on CSX East Three-Building: Carroll Creek Park, Frederick, MD: https://www.flickr.com/photos/22711505@N05/28...
rdotis on CSX East Three-Building: The failure to take advantage of the location of the historic Washington Canal (...
Westnorth on CSX East Three-Building: All I can see on that site plan is the word "HII"
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/16/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/15/19
70 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/15/19
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 09/13/19
300 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/19
400 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/11/19
400 B/O M ST SE   THEFT
Shoplifting
 09/10/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/09/19
54 M ST SE   BURGLARY
Burglary Two
 09/07/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/05/19
400 B/O M ST SE   THEFT
Shoplifting
 08/30/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/28/19
500 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/28/19
800 B/O VIRGINIA AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/28/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/28/19
500 B/O L ST SE   ROBBERY  08/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/23/19
300 B/O K ST SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 08/23/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/22/19
1100 B/O 2ND PLACE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/21/19
300 B/O L ST SE   BURGLARY
Burglary One
 08/21/19
100 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/20/19
1200 B/O SOUTH CAPITOL ST SE   ROBBERY  08/20/19

Recent Issued Building Permits Archive  
1346 4TH ST SE   
09/11/19 
FC 1346 HOLDCO I LLC / null
E1911472 / SUPPLEMENTAL
900 5TH ST SE   
08/30/19 
CAPPER CARROLLSBURG VENTURES, LLC / DFM DEVELOPMENT SERVICES, LLC
B1906215 / CONSTRUCTION
Reconstruction of 4-story residential building, the Arthur Capper Senior Center, damaged by fire.
200 I ST SE   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904525 / POST CARD
   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904526 / POST CARD
   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904529 / POST CARD
100 M ST SE 9TH FLOOR   
09/05/19 
SQUARE 743 INC / DAVID FLEMING; DAVID FLEMING
P1909280 / SUPPLEMENTAL
100 M ST SE SUITE 910   
08/22/19 
SQUARE 743 INC / null
E1910764 / SUPPLEMENTAL
100 M ST SE   
09/05/19 
SQUARE 743 INC / FREDERICK S. DONHAM; FREDERICK S. DONHAM
P1909275 / SUPPLEMENTAL
ONE OPEN SITE DRAIN
250 M ST SE   
08/26/19 
null / ;
P1908962 / SUPPLEMENTAL
   
08/27/19 
SQUARE 769 LLC / STEVEN CHEN
AH1901196 / CONSTRUCTION
After hours permit is respectfully requested from 3am to 7am daily.
   
09/04/19 
SQUARE 769 LLC / JEFFREY D WOLF
AH1901226 / CONSTRUCTION
After hours permit respectfully requested from 3 am to 7 am daily.
410 M ST SE   
09/16/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MICHAEL B. BELL; MICHAEL B. BELL
E1911625 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
08/26/19 
CSX TRANSPORTATION, INC / ; N/A; TBD
R1900100 / CONSTRUCTION
RAZE 1 STORY WOOD FRAMED STRUCTURE
1100 NEW JERSEY AVE SE   
08/22/19 
SQUARE 742 LLC / null
E1910802 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
08/23/19 
UNITED STATES OF AMERICA / ROBERT K WILLETT; ROBERT K WILLETT
E1910857 / SUPPLEMENTAL
   
09/03/19 
UNITED STATES OF AMERICA / PARKER HARRELL; PARKER HARRELL
SB1900287 / CONSTRUCTION
We propose to furnish and install fifteen (15) gravel packed wells, fourteen (14) around the perimeter, and one (1) at the elevator pit. We will also be installing 3 monitoring wells and potentially 5 contingency wells. We will only pump from up to 15 wells at a time. All wells will be located in a mutually agreed layout. The wells will be installed by advancing up to a 10.25 I.D. hollow stem auge...
125 O ST SE   
09/13/19 
DISTRICT OF COLUMBIA / FRED T FALCONE; JOSEPH SCRIBELLITO
SB1900423 / CONSTRUCTION
Soil borings to collect samples and installed a grouted in place vibrating wire piezometer approximately 30 feet below grade. Two geotechnical soil borings to 75 feet below grade, and 3 soil borings to 20 feet below grade with 5 feet of coring though buried foundations.
301 TINGEY ST SE C-1   
09/03/19 
SEFC 160, LLC / JEFF NOLD
AH1901221 / CONSTRUCTION
Work will occur on 3rd Street SE between Tingey St SE & Water St SE. We will be assessing and providing a CCTV inspection of a sewer line.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.