Since January, 2003
            
 (a random before-and-after moment)
February 3, 2007
May 29, 2016
2nd (East) at K, Looking West-Northwest (see more)

I wasn't at Monday night's ANC 6D meeting, but commissioner David Garber tweeted the news that the commission voted to support the liquor license for Kruba Thai and Sushi, which apparently is now hoping to open in August in the southwest corner of the ground floor of the Foundry Lofts at the Yards. It will have "tons of outdoor seating facing Yards Park," given its location directly across from the Lumber Shed. This is another slippage of the opening date, but work does appear to be ongoing in the space, and movement on a liquor license application is good to see.
Kruba is another offering from the same people running Teak Wood Thai and Sushi and Regent Thai near Dupont Circle and Galae Thai & Sushi in Alexandria.
Comments (9)
   
 
 More About ANC News

JDLand.com Home

Comments

Eric says: (7/10/12 10:49 AM)
Why does DC have great Thai but absolutely crappy Korean/Vietnamese? And notice how you never see lots of Thai people (at least compared to Vietnamese and Korean) despite there being Thai restaurants everywhere?


JD says: (7/10/12 1:47 PM)
I dunno. I don't see a lot of Scottish people despite there being McDonalds's everywhere. ;-)


PJY03 says: (7/10/12 1:53 PM)
White yuppies can't get enough Pad Thai.

'White yuppies love x' is pretty much the formula for why DC has lots of a given thing (e.g., cupcakes, craft beers, 'small plates', farmers markets) and hardly any of another given thing (e.g., 24 hour diners, Costco's, Bass Pro Shops).

Good to see Kruba opening soon though (I'm a white yuppy).



JT says: (7/10/12 4:10 PM)
I could go for a Singha by the river on a nice hot day like today.


Ed says: (7/11/12 8:57 AM)
JD,

Apparently the some members of the 6D ANC are in a "catch-up" mode with the new reconfigured 6D02 Single Member District that now includes Captiol Riverfront residents in Velocity, Capitol Hill Tower and 909 New Jersey. The vote for the Kruba Thai restaurant was not unanimous with two abstaining votes including Cara Shockley who represents 6DO2.
Is there anyone that has not got the message that the Capitol Riverfront needs more restaurants? Hello!



JD says: (7/11/12 9:55 AM)
This might be a good time for me to ask all prospective ANC 6D02 and 6D07 candidates to be good sports and good citizens and reference themselves as being in the race when posting here.



SWill says: (7/11/12 10:41 AM)
Kruba Thai will have 90 indoor seats and a summer garden with up to 80 seats. Looking forward to some drunken noodles ;-)


BillP says: (7/11/12 3:24 PM)
eric, the DC area has a lot of good korean and vietnamese but it is all in the suburbs, especially annandale (korean), seven corners / eden center (vietnamese), merrifield / vienna (korean) and rockville (both), among other places I am sure.

jd, i am not planning to run for anything! ;-)


JD says: (7/11/12 7:25 PM)
Okay, everyone who isn't running post here, and we'll figure out the candidates by process of elimination! :-)

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2016!
 Top News
  

conngs0 on Two-Year Change in: I think CSX has done a decent job of mitigating the inconveniences that weren't ...
JD on Two-Year Change in: I'm not sure that in the FEIS they said it wouldn't be closed at all--there had ...
walt on Two-Year Change in: CSX and city officials promised in the Final environment impact study (FEI)? tha...

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/17/16
1000 B/O HALF ST SE   THEFT
Theft First Degree (all Other Larceny)
 08/16/16
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/15/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/14/16
16 B/O M ST SE   ROBBERY  08/12/16
1000 B/O 5TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/09/16
1200 B/O 1ST ST SE   THEFT
Theft First Degree (shoplifting)
 08/08/16
50 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/02/16
600 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/02/16
700 B/O L ST SE   ROBBERY  08/01/16
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/29/16
700 B/O L ST SE   ROBBERY  07/28/16
1100 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/25/16
1200 B/O HALF ST SE   BURGLARY
Burglary Two
 07/24/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/23/16
900 B/O 5TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/23/16
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/22/16
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 07/20/16
900 B/O 4TH ST SE   ROBBERY  07/20/16
500 B/O L ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/19/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (theft From Building)
 07/19/16

Recent Issued Building Permits Archive  
1004 1ST ST SE   
08/04/16 
SQ. 740 LLC / N/A SQ 740 LLC JOHN AKRIDGE DEVELOP COMPANY; ECC, INC.
SB1600325 / CONSTRUCTION
Due diligence investigation. Installation of six 3-inch diameter direct-push geoprobe soil borings to depths of approximately 30 below grade. Soil borings will be abandoned on the same day as drilling by tremi-grouting using a bentonite slurry composed of 2 pounds of bentonite powder to 1 gallon of water. IDW will be properly managed.
1212 4TH ST SE 120   
08/04/16 
FC 1212 LLC / CLARK S FULLER
M1603023 / SUPPLEMENTAL
1150 5TH ST SE 20002   
08/11/16 
ALAN J PHELPS / DOUGLAS FOSTER
B1509540 / CONSTRUCTION
1. Renovation of existing first and second floor of the academic wing of the Van Ness building. 2. Square footage is approximately 26,000 SF ,For phase 1 3. Cost of construction is 11.5M 4. Scope of work details a. Convert existing space in to 6 new classroom space. These classrooms will be two PreK -3, two prek-4, and two Kindergarten classes. Also for phase 1,...
1150 5TH ST SE   
08/12/16 
DISTRICT OF COLUMBIA / JOHN HOMICK
E1609156 / SUPPLEMENTAL
   
08/12/16 
DISTRICT OF COLUMBIA / MATT LOSIGNOR
P1608656 / SUPPLEMENTAL
   
08/12/16 
DISTRICT OF COLUMBIA / ORLANDO M CATANA
E1609149 / SUPPLEMENTAL
1220 HALF ST SE   
08/05/16 
NA BUFFALO WILD WINGS / NA BUFFALO WILD WINGS; BELA X-PEDITERS PLUS, INC.
AH1600921 / CONSTRUCTION
Work after hours 7pm - 7am
82 I ST SE   
08/15/16 
GDCV EYE STREET LLC / GDCV EYE STREET LLC; KIM MITCHELL CDKM CONSULTING LLC
B1611941 / CONSTRUCTION
FIRST EXTENSION TO PERMIT B1507990 TO EXPIRE ON 3 / 17 / 17
   
08/15/16 
CSX TRANSPORTATION INC / BEDCO MOBILITY INC.
EN1602806 / SHOP DRAWING
Type of Elevator : One (1) vertical wheel-chair lift / steel / garage level 2 / handicap lift (13th floor)
150 I ST SE   
08/05/16 
MAXIM CRANE WORKS MAXIM CRANE WORKS
AH1600933 / CONSTRUCTION
after hours to place mobile crane to take down tower crane with mobile crane and stage trucks from 7am 8 / 8 / 2016 to 1159p-m 8 / 9 / 2016
125 L ST SE   
08/11/16 
CRANE SERVICE CO / CRANE SERVICE CO; CHRISTINE LONG
AH1600945 / CONSTRUCTION
An after hours permit is respectfully requested from 4AM Saturday thru 9PM Sunday
80 M ST SE 1   
08/10/16 
WELLS REIT II 80 M STREET LLC / THOMAS B. STEG
P1608566 / SUPPLEMENTAL
80 M ST SE 2   
08/10/16 
WELLS REIT II 80 M STREET LLC / THOMAS B. STEG
P1608568 / SUPPLEMENTAL
80 M ST SE 3   
08/10/16 
WELLS REIT II 80 M STREET LLC / THOMAS B. STEG
P1608569 / SUPPLEMENTAL
100 M ST SE 7   
08/04/16 
SQUARE 743 INC / ANTHONY G SAMBURG
E1608667 / SUPPLEMENTAL
100 M ST SE PT OF 4TH   
08/11/16 
QUARE 743 INC . / QUARE 743 INC .; JOHN GIUSEPPE-RAMCO
B1611810 / CONSTRUCTION
renovation to parts of an existing 4th floor office space, tech marine business as shown on the attached mech., plumb., elect., fire protection, demolition, and arch. dwgs. interior work only. no change in use. no struct. work. 800 sf.
300 M ST SE   
08/05/16 
FEDERAL CENTER LP / null
F1600517 / CONSTRUCTION
   
08/06/16 
FGSF TEST
PC92978992 / POST CARD
Installation of 1 temporary construction trailer on private property.
   
08/06/16 
SDS SDSDS / LAVANYA SIKHINAM; SDS SDSDS; ENRIQUE LYON
E90011839 / SUPPLEMENTAL
   
08/07/16 
XVB XVBX / FSGVSF SFGS; XVB XVBX; DAVID FARMER
E77515115 / SUPPLEMENTAL
909 NEW JERSEY AVE SE 1311   
08/11/16 
null / NA NA NA
EHOP1690902 / HOME OCCUPATION
861 NEW JERSEY AVE SE   
08/09/16 
NA CSX TRANSPORTATION, INC.
AH1600944 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
1000 NEW JERSEY AVE SE   
08/02/16 
null / ALLISON HINES
PC66310814 / POST CARD
Replacement of not more than 1 gas appliance, on a residential, commercial or industrial project.
1017 NEW JERSEY AVE SE   
08/04/16 
1021 NEW JERSEY AVE LLC / N/A 1021 NEW JERSEY AVE LLC POTOMAC DEVELOPMENT; ECC, INC.
SB1600326 / CONSTRUCTION
Due diligence investigation. Installation of one 3-inch diameter direct-push geoprobe soil borings to depths of approximately 30 feet below grade. Soil borings will be abandoned on the same day as drilling by tremi-grouting using a bentonite slurry composed of 2 pounds of bentonite powder to 1 gallon of water. IDW will be properly managed.
1029 NEW JERSEY AVE SE   
08/04/16 
MESERET DEGEFU / HAILU TEKLEBERHAN; ECC, INC.
SB1600327 / CONSTRUCTION
Due diligence investigation. Installation of two 3-inch diameter direct-push geoprobe soil borings to depths of approximately 30 feet below grade. Soil borings will be abandoned on the same day as drilling by tremi-grouting using a bentonite slurry composed of 2 pounds of bentonite powder to 1 gallon of water. IDW will be properly managed.
1111 NEW JERSEY AVE SE   
08/11/16 
null / THOMAS P MCGUIRE
E1609117 / SUPPLEMENTAL
125 O ST SE   
08/04/16 
JOHN LECKER, FOREST CITY WASHINGTON, INC / JOHN LECKER, FOREST CITY WASHINGTON, INC; RACHEL DOERY, PSI
SB1600337 / CONSTRUCTION
Site is located south of N Pl SE, 500ft east of intersect with First St, SE in Washington, DC. Drilling soil borings at site for future development of a 4-story concrete parking garage with 331 parking spaces at street level. A 2-story theater will be constructed above the parking garage totaling approximately 95,000 sf.
25 POTOMAC AVE SE   
08/03/16 
RIVERFRONT INVESTMENT PARTNERS / RIVERFRONT INVESTMENT PARTNERS; JASON BENTLEY
B1610683 / CONSTRUCTION
Revision to Issued Permit Number B1408697.
741 SICARD ST SE 20374   
07/29/16 
US NAVY NAVFAC WASHINGTON / US NAVY NAVFAC WASHINGTON; RPS INC
SB1600239 / CONSTRUCTION
ADVANCEMENT OF UP TO 22 SOIL BORINGS AND 4 MONITORING WELLS TO SUPPORT INVESTIGATION OF FORMER PETROLEUM UNDERGROUND STORAGE TANKS AT BUILDING 71 AND SITE 111 / 225 AT WASHINGTON NAVY YARD. SOIL BORINGS WILL BE ADVANCED TO A MAXIMUM OF 15 FT BELOW GROUND SURFACE. WELLS WILL BE INSTALLED TO A MAXIMUM DEPTH OF 13 FT BELOW GROUND SURFACE. SOIL BORINGS WILL BE BACKFILLED UPON COMPLETION. WORK PLAN HAS...
329 VIRGINIA AVE SE   
08/01/16 
CLAIRE C SCHAEFER / JOHN C. MYERS
P1608301 / SUPPLEMENTAL
385 WATER ST SE   
08/12/16 
FC 385 WATER LLC / STEPHEN J. EXELBERT
P1608654 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2016 JD.