Since January, 2003
            
 (a random before-and-after moment)
June 4, 2006
July 17, 2016
1st at N Place, Looking South-Southwest (see more)

Presidential election not exciting enough for you? Lack of a mayor's race got you down? Need a bigger fix than just a council chair contest? Then you're in luck, because there will be Advisory Neighborhood Commission elections this November, as there are every two years.
The process kicks off Monday (July 9), when interested candidates can pick up nominating petitions at the DC Board of Elections. If candidates-to-be can round up signatures by Aug. 8 of at least 25 registered voters in the single member districts (SMDs) they wish to represent, and survive through the petition challenge period Aug. 11-20, they'll be on the ballot on Nov. 6. Candidates must be registered voters themselves and have lived in the SMD since June 9.
The biggest change for this go-round is there will now be two SMDs covering Near Southeast, necessitated by the swelling of the neighborhood's population well past the legislated SMD size of 2,000 plus or minus five percent. The map at right matches the final boundaries as signed into law, at least for Near Southeast (it shows what Tommy Wells submitted to the council to be the 6D SMD boundaries).
The changes? SMD 6D07 (shown in purple blue), the current Near Southeast district represented by David Garber that has long covered most everything east of South Capitol and south of the the freeway to 11th Street, has a big chunk taken out of it along South Capitol Street South of I and north of Potomac. That part of the neighborhood will now be in SMD 6D02 (dark green), currently represented by Southwest resident Cara Shockley, and it also includes areas of Southwest north of M Street and west of South Capitol. (The folks who live on or east of 7th Street SE north of M continue to be represented by ANC 6B04.)
So, If you live in Jefferson/Axiom, Onyx, Capitol Quarter, or the Foundry Lofts, or plan on moving into the Park Chelsea or any new buildings at the Yards or Florida Rock over the next 10 years, you are still in 6D07.
Residents of 909 New Jersey, Capitol Hill Tower, Velocity, and any buildings that might pop up in the blocks north of Nationals Park by 2022 will be voting in 6D02.
If you're looking to run and you pick up nominating petitions, feel free to drop me a line to let me know. And I imagine I will write about the races from time to time.
Comments (5)
   
 
 More About ANC News

JDLand.com Home

Comments

JeffreyGordon says: (7/10/12 4:17 AM)
JD, I think you got the wrong color in your post--Purple vs Blue to describe DG's district 6D07. Your description of the district does not match the purple district on the map, nor make any sense given what I know about the District--it is definitely the blue one on the map not the purple one.


JD says: (7/10/12 8:52 AM)
I consider what I guess you're thinking of as purple (and marked purple on the map) as pink, and since I only ever write about what happens east of South Capitol, I don't think the color shift is critical. But thanks, will fix.


Kelsey25252 says: (7/16/12 11:04 AM)
Ugh, we're on 7th St. SE. and we're still in 6B04? It makes no sense that our tiny little section is STILL included as part of that district. Our neighborhood concerns are completely different than the rest of 6B04.

Is it too late to request to be apart of 6D07?


David Garber says: (7/16/12 8:08 PM)
@Kelsey,

I hear ya. Unfortunately the other powers that be wanted to keep you all as part of 6B, mostly because you are part of the Capitol Hill historic district. Please feel free to come to any meetings and share concerns regarding anything happening in my district, despite technically being in 6B.


Kelsey25252 says: (7/20/12 3:21 PM)
Thanks David, we've been really impressed with your dedication and hard work in 6B. Good luck in the coming election, if we were part of 6D, we'd vote for ya! :)

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2016!
 Top News

conngs0 on Signs and Wonders: I couldn't argue with anyone who is skeptical about the cost projections for the...
Chaifetz10 on Two-Year Change in: Have a random question for anyone and everyone here as 1) It's technically outsi...
JD on Signs and Wonders: {pointed silence}
202_cyclist on Signs and Wonders: Another blog has a post about the 11th Street bridge park ( ). I think this is ...

  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/17/16
1000 B/O HALF ST SE   THEFT
Theft First Degree (all Other Larceny)
 08/16/16
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/15/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/14/16
16 B/O M ST SE   ROBBERY  08/12/16
1000 B/O 5TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/09/16
1200 B/O 1ST ST SE   THEFT
Theft First Degree (shoplifting)
 08/08/16
50 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/02/16
600 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/02/16
700 B/O L ST SE   ROBBERY  08/01/16
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/29/16
700 B/O L ST SE   ROBBERY  07/28/16

Recent Issued Building Permits Archive  
1150 5TH ST SE 20002   
08/11/16 
ALAN J PHELPS / DOUGLAS FOSTER
B1509540 / CONSTRUCTION
1. Renovation of existing first and second floor of the academic wing of the Van Ness building. 2. Square footage is approximately 26,000 SF ,For phase 1 3. Cost of construction is 11.5M 4. Scope of work details a. Convert existing space in to 6 new classroom space. These classrooms will be two PreK -3, two prek-4, and two Kindergarten classes. Also for phase 1,...
1150 5TH ST SE   
08/12/16 
DISTRICT OF COLUMBIA / JOHN HOMICK
E1609156 / SUPPLEMENTAL
   
08/12/16 
DISTRICT OF COLUMBIA / MATT LOSIGNOR
P1608656 / SUPPLEMENTAL
   
08/12/16 
DISTRICT OF COLUMBIA / ORLANDO M CATANA
E1609149 / SUPPLEMENTAL
82 I ST SE   
08/15/16 
GDCV EYE STREET LLC / GDCV EYE STREET LLC; KIM MITCHELL CDKM CONSULTING LLC
B1611941 / CONSTRUCTION
FIRST EXTENSION TO PERMIT B1507990 TO EXPIRE ON 3 / 17 / 17
   
08/15/16 
CSX TRANSPORTATION INC / BEDCO MOBILITY INC.
EN1602806 / SHOP DRAWING
Type of Elevator : One (1) vertical wheel-chair lift / steel / garage level 2 / handicap lift (13th floor)
125 L ST SE   
08/11/16 
CRANE SERVICE CO / CRANE SERVICE CO; CHRISTINE LONG
AH1600945 / CONSTRUCTION
An after hours permit is respectfully requested from 4AM Saturday thru 9PM Sunday
80 M ST SE 1   
08/10/16 
WELLS REIT II 80 M STREET LLC / THOMAS B. STEG
P1608566 / SUPPLEMENTAL
80 M ST SE 2   
08/10/16 
WELLS REIT II 80 M STREET LLC / THOMAS B. STEG
P1608568 / SUPPLEMENTAL
80 M ST SE 3   
08/10/16 
WELLS REIT II 80 M STREET LLC / THOMAS B. STEG
P1608569 / SUPPLEMENTAL
100 M ST SE PT OF 4TH   
08/11/16 
QUARE 743 INC . / QUARE 743 INC .; JOHN GIUSEPPE-RAMCO
B1611810 / CONSTRUCTION
renovation to parts of an existing 4th floor office space, tech marine business as shown on the attached mech., plumb., elect., fire protection, demolition, and arch. dwgs. interior work only. no change in use. no struct. work. 800 sf.
300 M ST SE   
08/06/16 
FGSF TEST
PC92978992 / POST CARD
Installation of 1 temporary construction trailer on private property.
   
08/06/16 
SDS SDSDS / LAVANYA SIKHINAM; SDS SDSDS; ENRIQUE LYON
E90011839 / SUPPLEMENTAL
   
08/07/16 
XVB XVBX / FSGVSF SFGS; XVB XVBX; DAVID FARMER
E77515115 / SUPPLEMENTAL
909 NEW JERSEY AVE SE 1311   
08/11/16 
null / NA NA NA
EHOP1690902 / HOME OCCUPATION
861 NEW JERSEY AVE SE   
08/09/16 
NA CSX TRANSPORTATION, INC.
AH1600944 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
1111 NEW JERSEY AVE SE   
08/11/16 
null / THOMAS P MCGUIRE
E1609117 / SUPPLEMENTAL
385 WATER ST SE   
08/12/16 
FC 385 WATER LLC / STEPHEN J. EXELBERT
P1608654 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2016 JD.