Since January, 2003
            
 Page Through from Before to After

Yards developer Forest City Washington is putting out the word that construction is about to begin to transform the Lumber Shed at the Yards Park from its current open-air skeletal structure to the 30,000-square-foot glass-walled retail and office structure that has been in the works for a number of years.
Construction is expected to take 12-14 months, so look for completion probably in early fall 2013. The southeast corner of this building will be home to Osteria Morini, the Italian restaurant from New York City chef Michael White, and Forest City will be moving its offices to the second floor. The ground floor is designed to offer indoor and outdoor seating for five restaurants in all, and apparently a second unnamed offering is expected to be announced later this summer.
Look for fences to be going up around the structure by the end of this week, with actual construction activity probably beginning by early July.
See my Yards Park Phase 2 section for more renderings of the Lumber Shed's final form, along with photos from its faaaaahbulous salmon-exterior days and the more recent stripped down version. There are also plans for two more pavilions directly to the east of the Lumber Shed, though there's no timeframe for them.
And, in other Yards news:
* Kruba Thai and Sushi is expected to open in July in its location on the southwest corner of the Foundry Lofts (directly across from the Lumber Shed).
* The Boilermaker Shops are still expected to open "later this year," with its lineup of Bluejacket Brewery, Willie's Brew and 'Que, Buzz Bakery, Huey's 24-7 Diner, Austin Grill Express, and brb ("be right burger") well known by now, along with a dry cleaners and with spaces for other non-food/service retailers yet to be filled/announced.
* And the 218-unit residential building at 4th and M with the ground-floor Harris Teeter and unnamed-fitness-club-that's-Vida-Fitness is going to be called Twelve12 (for its address, 1212 4th Street SE). Excavation of the site has taken a little longer than expected (thanks to those surprises that kept being dug up), so the official start of construction there is now going to be "later this summer," with the opening in early 2014 (which is pretty much what I kept telling people to anticipate, anyway).
Comments (12)
   
 
 More About Lumber Shed/Yards

JDLand.com Home

Comments

F says: (6/19/12 4:02 PM)
Surprises when digging?

Are you listening CSX?


MJM says: (6/19/12 4:36 PM)
Got to LOC and read about the tunnel construction - great read. There won't be any surprises since the there was nothing there when they built the current tunnel except the Navy Yard tunnel which was destroyed in the early 1900s (near K St).


YardD says: (6/19/12 5:50 PM)
Related to Twelve12 - any word on whether the brick wall will remain in place along M Street? I work at the Navy Yard, and 'get' perhaps, the historical significance of it, but haven't read anything about removing it, or part of it. It's quite the fortress, and in my mind, should go, save for maybe the turret-like corner piece...


JD says: (6/19/12 6:29 PM)
The wall and turret are both being saved. You can already see the work they've done to brace the wall.


conngs0 says: (6/20/12 1:32 PM)
Is the developer required to preserve the wall and turret? Regardless, I think that the blending of the old structure with the new building will look pretty cool when the project is done, and it'll help the building fit into what seems like a theme of the entire area. Awesome to see the neighborhood continue to progress.


F says: (6/20/12 3:23 PM)
The turret is unique and picturesque and probably should be preserved. The rest of it is - lets face it - a brick wall.

MJM => There won't be any surprises. Let the betting begin.


MJM says: (6/20/12 5:11 PM)
One share of CSX stock? :) Only surprises might be the CQ residents and lawsuits...

But on another note - yeah to FCE-A!


YardD says: (6/25/12 10:25 AM)
I can't imagine the new structure actually incorporating the wall in its construction...? Having the building edge that close to the sidewalk/road? The thing has been a safety risk for years, and the added bracing is on top of limited bracing installed when part of it crumbled in 04/05. Will be interesting to see what they do with it.


JD says: (6/25/12 10:46 AM)
No, the wall isn't incorporated into the building structure itself, it's just going to remain standing where it is, with the building going up a few feet to the south of it. It's very very very historic, so there's no way it was coming down. (A small entrance way will be cut through it on M, though, as the rendering shows.)


Capitol Hill SE says: (6/25/12 1:32 PM)
When I was in the park for yoga on Wednesday I saw they had started installing glass panels on the northwestern corner. Very exciting!


JD says: (6/25/12 1:40 PM)
Those panels are indeed way cool--except that they've been there for a number of months now, to show folks how they would look. (Maybe all that yoga cleared your mind to things you haven't been seeing before!)



Capitol Hill SE says: (6/26/12 9:55 AM)
That's weird becuase we did the yoga in the lumbershed the week before (there was a concert on the boardwalk) and I didn't see them then either.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

202_cyclist on Slider-Palooza 2019: @ColoradoCane: I spoke with one of the construction workers the other night and...
walt on Slider-Palooza 2019: @CJBabyDaddy: Whaaaat? How do you always know so much? This is great. Thx! @...
ColoradoCane on Slider-Palooza 2019: Does anyone know what the work going on at the intersection of NJ & I St. al...
CJBabyDaddy on Slider-Palooza 2019: @Walt: Start here — https://www.bluedrop.co/services/facility-rental/
willinrm on Taking a Look/Tingey: interestingly enough Chief Marcelle from BlueJacket will be leaving bluejacket t...
walt on Slider-Palooza 2019: Great info on DC Water -- thanks everyone. I'm going to see if I can get an es...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 3RD ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/19
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 11/01/19
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/19
400 B/O M ST SE   THEFT
Shoplifting
 10/30/19
200 B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/19
100 B/O H ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/28/19
900 B/O NEW JERSEY AVE SE   ROBBERY  10/28/19
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/27/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/24/19
100 B/O H ST SE   ROBBERY  10/23/19
1400 B/O SOUTH CAPITOL ST   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/22/19
100 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/21/19
70 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/21/19

Recent Issued Building Permits Archive  
1331 2ND ST SE   
11/08/19 
DC WATER / CRAIG M COOK
B1907684 / CONSTRUCTION
Flood mitigation, seal openings, install brackets for stop logs, replace elevator shaft with concrete slab.
1300 4TH ST SE   
11/15/19 
ASANA PARTNERS / DEBRA MARSHALL; THE DONOHOE COMPANIES INC
B2001773 / CONSTRUCTION
ADD EXTERIOR DOOR, ADD INTERIOR DOOR , ANY RELAYED,ELECTRICAL,PLUMBING, RELOCATING UNBUILT APPROVED NON LOAD BEARING FIRE RATED PARTITIONS @ FIRST FLOOR APPROVED UNDER PERMIT #B1711970. ATTACHED
300 M ST SE SPACE B   
11/06/19 
FEDERAL CENTER LP / null
M2000403 / SUPPLEMENTAL
100 M ST SE SUITE 200 20003   
10/25/19 
MONUMENT REALTY LLC / null
E2001081 / SUPPLEMENTAL
100 M ST SE STE# 200   
10/25/19 
SQUARE 743 INC / MIGUEL A. MOROTE; MIGUEL A. MOROTE
E2001078 / SUPPLEMENTAL
300 M ST SE   
11/06/19 
FEDERAL CENTER LP / RUBEN MOVSISYAN; RUBEN MOVSISYAN
E2001472 / SUPPLEMENTAL
   
11/11/19 
FEDERAL CENTER LP / null
P2001215 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
11/05/19 
809-853 NEW JERSEY AVENUE ACQUISITION, LLC / JAVIER A GRACIA; NA NA
SB2000011 / CONSTRUCTION
Drilling and installation of 3 inclinometers which will be extended to a depth of 25 below existing site grade as well as the installation of 4 settlement optical monitoring points which will be extended to depths ranging between 5 feet to 30 feet below existing site grades.
   
11/15/19 
CSX TRANSPORTATION INC / ERICKA CLARK; DGS CONSTRUCTION
TC2000008 / CONSTRUCTION
(2) tower cranes
1100 NEW JERSEY AVE SE 1ST   
11/04/19 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2001381 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 410 20003   
10/24/19 
WILLIAM SNOODT / null
P2000729 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
11/01/19 
SQUARE 742 LLC / ;
P2000952 / SUPPLEMENTAL
   
11/05/19 
SQUARE 742 LLC / BETSY H MARINO; RICHARD PEPPER; BETSY H MARINO
SG2000062 / CONSTRUCTION
Remove Alion sign and replace with illuminated wall sign reading SERCO
1111 NEW JERSEY AVE SE   
11/15/19 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / TANYA HILL; THYSSENKRUPP
ER2000366 / SHOP DRAWING
REPLACE EXISTING 8MM WORN HOIST CABLES WITH LIKE IN KIND ON ELEVATOR #4. WORK TO ALLOW UNIT TO BE RETURNED TO SERVICE.
1299 NEW JERSEY AVE SE   
11/12/19 
BROOKFIELD DEVELOPMENT / JUSTIN BELLOW
BP2000489 / POST CARD
71 POTOMAC AVE SE   
11/08/19 
RIVERFRONT HOLDINGS II, LLC / JAMES VANEGAS
AH2000075 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
201 TINGEY ST SE   
11/14/19 
BROOKFIELD PROPERTIES / DFM DEVELOPMENT SERVICES, LLC
AH2000197 / CONSTRUCTION
Afterhours work at Tingey Square Project. The work performed will be forming, prepping and paving at Tingey Square park. Friday and Saturday the 15th & 16th, from 7PM to midnight. If required, Sunday the 17th from 7AM to 3PM. ANC Support provided. Associated Permit Include PA328164-R1 and PA10760162.
520 TINGEY ST SE   
10/30/19 
UNITED STATES OF AMERICA / JOHN WICKLIFFE; TBD
TN2000020 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed Feb 9, 2020 - Aug 4, 2020 Events Daily 8:00 am - 10:00 pm
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.