Since January, 2003
 (a random before-and-after moment)
July 2005
May 26, 2013
3rd at Virginia, Looking East-Southeast (see more)

From DDOT, news of another milestone in the 11th Street Bridges reconstruction project:
"The District Department of Transportation (DDOT) will open the newly constructed ramp at the intersection of 11th Street and M Street, SE to traffic on or about Friday, May 18. The new ramp will provide access from the M Street/Navy Yard area to the new outbound 11th Street Freeway Bridge and southbound I-295.
"Access to Historic Anacostia will remain on the old outbound 11th Street Bridge, until the new local bridge opens in the coming days. Existing inbound traffic movements from northbound I-295 to the M Street/ Navy Yard area will also remain the same."
So, don't drive down 11th Street south of M anymore if you're wanting to get to I-295 southbound, because that old ramp at N Street will now only take you via the old bridge directly into Anacostia on Martin Luther King Jr. Ave.
Will be interesting to see how this works, and of course it will be equally interesting to see the new 11th Street Local bridge in action, "in the coming days." UPDATE, 5/18: Dr. Gridlock says today on his blog that the 11th Street Local bridge will be opening on Wednesday (May 23).
Comments (4)
   
 
 More About 11th Street Bridges
 All posts: 11th Street Bridges

JDLand.com Home

Comments

Maelstrom says: (5/17/12 4:29 PM)
I rode by the local bridge on two different days recently and it looks like the fake brick (red patterened concrete) that was used for the crosswalks was not fairing well. I've seen at least two rip-ups and repours, and the surface of the concrete "bricks" looked cracked open in a lot of spots. I originally heard the local bridge would open May 16th, so I wonder if this is what is holding it up.


BillP says: (5/18/12 11:53 AM)
I'm sure they are saving the best for last, the direct connection from our neighborhood to 295 North without doing the Pennsylvania Avenue shuffle!


jmauro says: (5/19/12 6:02 PM)
Are they going to be adding northbound entrances onto DC-295 as part of this project?


JD says: (5/19/12 6:09 PM)
There's going to be a new ramp from the outbound 11th Street Freeway bridge to DC-295 northbound. You can see it under construction now as you drive outbound on the freeway bridge--its exit lanes are already in place at the right side of the bridge, but blocked off.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2015!
 Top News
  
Gamble Rogers on Hill Country Launching: Two thoughts: 1) The best part about the Hill Country spot is their "adapt...
Gamble Rogers on Pacers Running Coming: JD, you know your readers too well when a posting about a much-loved running sto...
Gamble Rogers on Pacers Running Coming: Chicken waaaang war! Would love to see Bonchon duke it out.
conngs0 on Hill Country Launching: I see they've carried on the tradition (aka mistake) started by the Fairgrounds ...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 8TH ST SE   THEFT F/AUTO
 05/24/15
100 B/O L ST SE   THEFT F/AUTO
 05/15/15
200 B/O I ST SE   THEFT
2nd Degree
 05/15/15
1000 B/O 7TH ST SE   THEFT F/AUTO
 05/12/15
70 B/O I ST SE   THEFT
Theft 1st Degree
 05/09/15
1100 B/O 2ND ST SE   MOTOR VEHICLE THEFT
Unauthorized Use Of Vehicle
 05/05/15
UNIT B/O I ST SE   BURGLARY
2nd Degree Burglary (Armed Or Otherwise)
 05/02/15
1000 B/O 8TH ST SE   THEFT F/AUTO
 05/01/15
1100 B/O NEW JERSEY AVE SE   THEFT
2nd Degree
 04/26/15

Recent Issued Building Permits Archive  
1011 1ST ST SE   
05/14/15 
COLIN CLARK / MICHAEL BIANCO; COLIN CLARK; MITCH PERMUY
E98099105 / SUPPLEMENTAL
1200 1ST ST SE   
05/12/15 
FOREST CITY WASHINGTON / WILL TEASS / PE TEASS - WARREN ARCHITECTS; WILL TEASS TEASS
BCIV1500073 / CONSTRUCTION
INSTALLATION OF EROSION SEDIMENT CONTROL FEATURES
1277 1ST ST SE   
05/15/15 
ANCHOR CONSTRUCTION
AH1500439 / CONSTRUCTION
EXCAVATION CATCH BASINS MANHOLE INSTALLATION SEWER ML TRENCH SEWER SERVICE LATERAL ABANDONMENT INSTALLATION OF VAULTS WATER LATERAL CONNECTION OVER 2 INCHES WATER SERVICE LATERAL ABANDONMENT WATER METER MANHOLE
1007 8TH ST SE   
05/21/15 
CALLE OCHO LLC / ALAN W. CARTER
E1506005 / SUPPLEMENTAL
1015 HALF ST SE   
05/22/15 
HALF ST SE LLC / ROBERT L HUNTER
M1501993 / SUPPLEMENTAL
   
05/06/15 
HALF ST SE LLC / KRISTINA DELGADO
B1506055 / CONSTRUCTION
REVISION TO PERMIT NUMBER B1501688
   
05/12/15 
HALF ST SE LLC /
P1505751 / SUPPLEMENTAL
   
05/20/15 
HALF ST SE LLC / JOSEPH J FLYNN
E1505972 / SUPPLEMENTAL
   
05/22/15 
HALF ST SE LLC / RALPH E. JACKSON
E1506049 / SUPPLEMENTAL
82 I ST SE   
05/13/15 
GREYSTAR DEVELOPMENT GREYSTAR DEVELOPMENT / MARKO CZERKAS; GREYSTAR DEVELO GREYSTAR DEVELOPMENT; MITCH PERMUY
E77539507 / SUPPLEMENTAL
   
05/22/15 
CSX TRANSPORTATION INC / GLENNWOOD ROGERS
P1505766 / SUPPLEMENTAL
306 L ST SE   
05/14/15 
MICHAEL THOMPSON
B1507715 / CONSTRUCTION
FIRST EXTENSION TO PERMIT# B1311538 TO EXPIRE 10 / 17 / 2015
55 M ST SE   
05/21/15 
HINES GLOBAL REIT / JOHN GIUSEPPE-RAMCO
B1507922 / CONSTRUCTION
RENOVATIONS FOR EXPANSION OF 3RD FLOOR OFFICE SPACE GREAT MINDS AS SHOWN ON THE ATTACHED MECH. ELECT. FIRE PROTECTION DEMOLITION AND ARCH. DWGS. INTERIOR WORK ONLY. NO PLUMBING OR STRUCT. WORK INVOLVED.
80 M ST SE   
05/08/15 
WELLS REIT II 80 M STREET LLC / JOHN GIUSEPPE-RAMCO
B1504197 / CONSTRUCTION
RENOVATION TO 5TH FLOOR OFFICE SPACE TASC PHASE II AS SHOWN ON THE ATTACHED MECH. PLUMB. ELECT. FIRE PROTECTION DEMOLITION AND ARCHITECTURAL DWGS. INTERIOR WORK ONLY. NO CHANGE IN USE.
55 M ST SE   
05/07/15 
UNKNOWN UNKNOWN / PATRICK BARRON; UNKNOWN UNKNOWN; ROBIN MALLEY
E92336177 / SUPPLEMENTAL
80 M ST SE   
05/12/15 
WELLS REIT II 80 M STREET LLC / RONNIE E WRIGHT
E1505712 / SUPPLEMENTAL
   
05/12/15 
WELLS REIT LI 80 M STREET LIC / FRED MILLER; WELLS REIT LI 80 M STREET LIC; DOMINIC TOTARO
AR28204267 / SUPPLEMENTAL
   
05/13/15 
WELLS REIT II 80 M STREET LLC WELLS REIT II 80 M STREET LLC / NEIL NUTWELL; WELLS REIT II 8 WELLS REIT II 80 M STREET LLC; NEIL NUTWELL
P21967258 / SUPPLEMENTAL
100 M ST SE   
05/07/15 
SQUARE 743 INC. / JOHN GIUSEPPE-RAMCO
B1506295 / CONSTRUCTION
RENOVATIONS TO EXISTING 8TH FLOOR OFFICE SPACE TECH-MARINE BUSINESS AS SHOWN ON THE ATTACHED THIRD PARTY REVIEWED AND APPROVED MECH. PLUMB. ELECT. FIRE PROTECTION AND ARCH. DWGS. BY KTA GROUP. INTERIOR WORK ONLY. NO CHANGE IN USE NO STRUCT. WORK.
   
05/08/15 
SQUARE 743 INC / ROB HOHL
P1505689 / SUPPLEMENTAL
   
05/08/15 
SQUARE 743 INC / GEORGE S OWEN
M1501845 / SUPPLEMENTAL
   
05/09/15 
SQUARE 743 INC / JOSE UMANZOR-ALVAREZ; SQUARE 743 INC; ROBERT LAWALL
E99685352 / SUPPLEMENTAL
   
05/13/15 
UNKNOWN UNKNOWN / PATRICK BARRON; UNKNOWN UNKNOWN; ROBIN MALLEY
E65875186 / SUPPLEMENTAL
   
05/21/15 
SQUARE 743 INC. / ANDREW ARNTSON; SQUARE 743 INC.; ANDREW ARNTSON
P90727311 / SUPPLEMENTAL
1201 M ST SE   
05/06/15 
WASHINGTON GAS LIGHT CO / BERNARD G KALB
E1505525 / SUPPLEMENTAL
909 NEW JERSEY AVE SE   
05/07/15 
909 NEW JERSEY AVENUE ACQUISITION LLC / MATT LOSIGNOR
P1505667 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
05/06/15 
NAVY YARD 10127312 / VELOCITY WIRELESS
AN1500153 / CONSTRUCTION
REMOVE AND REPLACE 3 EXISITING PANEL ANTENNAS
125 O ST SE   
05/06/15 
DISTRICT OF COLUMBIA / JAMES A. WILLIAMS
E1505521 / SUPPLEMENTAL
25 POTOMAC AVE SE   
05/15/15 
BARR CONCRETE
AH1500438 / CONSTRUCTION
AFTERHOURS TO POUR CONCRETE WITH PUMP TRUCK FROM 11PM 5 / 15 / 2015 TO 1159 PM 5 / 16 / 2015
1200 SOUTH CAPITOL ST SE   
05/14/15 
AMY PHILLIPS / MIKE YASEK
SB1500274 / CONSTRUCTION
FIVE 75-FOOT GEOTECHNICAL SPT SOIL BORINGS WILL BE PERFORMED WITH AN AUGER DRILLING RIG UTILIZING CONTINUOUS FLIGHT HOLLOW STEM AUGERS CREATING APPROXIMATELY 6-INCH DIAMETER BOREHOLES.
1230 SOUTH CAPITOL ST SE   
05/21/15 
PUBLIC STORAGE INSTITUTE FUND / BRAD FLEEGLE
AN1500143 / CONSTRUCTION
REPLACE 3 ANTENNA SUPPORT FRAMES INSTALL 3 ANTENNAS ? 3 RRUS ON EXISTING ROOFTOP.
1244 SOUTH CAPITOL ST SE   
05/11/15 
1244 SOUTH CAPITOL RESIDENTIAL L.L.C. / ROBERT S. WATTS
E1505679 / SUPPLEMENTAL
1500 SOUTH CAPITOL ST SE   
05/21/15 
JOHN GIUSEPPE / DONALD VEALS; JOHN GIUSEPPE; DONALD VEALS
E55177883 / SUPPLEMENTAL
301 WATER ST SE   
05/12/15 
FC LUMBER SHED LLC /
P1505749 / SUPPLEMENTAL
   
05/19/15 
LUMBER SHED LIC. / ROBERT WATTS; LUMBER SHED LIC.; ROBERT WATTS
E82501860 / SUPPLEMENTAL
355 WATER ST SE   
05/06/15 
FRIDAY NIGHT CONCERT SERIES / LINDSEY GORE
TN1500047 / CONSTRUCTION
SPECIAL EVENT FRIDAY NIGHT CONCERT 1 16 X 24 TENT NO GENERATORS 1 16 X16 STAGE
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
1022 - 1109 M ST SE   03/27/15
$ 5,000,000
WASHINGTON HUMANE SOCIETY
 
9TH ST SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
POTOMAC AV SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
POTOMAC AV SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
POTOMAC AV SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
1103 9TH ST SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
1105 9TH ST SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
816 POTOMAC AVE SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
0819R L ST SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 


Project Directory




     © Copyright 2015 JD.