Since January, 2003
            
 Page Through from Before to After

Moving from the "P" portion of Monday's ANC 6D meeting (pylons and parking) to the "C"s:
* Canal Park: Chris Vanarsdale of the Canal Park Development Association gave an update on construction, the bottom line of which has not changed from what's been mentioned the past few months, that because of unexpected issues, the park's opening has been delayed until November. Unmapped utilities that required a redesign of the stormwater management system have been a big stumbling block, but Vanarsdale also mentioned the soil-related difficulties when building on the site of an old canal. Construction is now 60 percent complete, and the work on the pavilion is almost done. Here are the presentation slides, and you can also check out the official web site for more details (along with my project page). Oh, and they're thinking about offering Zamboni driving lessons!
* Community Center: The DC Housing Authority has filed a request with the Zoning Commission for an extension for construction of the planned Capper Community Center, which already received one extension back in 2010 that 6D supported. DCHA has apparently requested that the Zoning Commission act within 30 days on the request, news of which the ANC received on Monday. So the commissioners voted unanimously to send a letter urging postponement of the zoning case so that the ANC can address the request and form a response with a vote at next month's meeting. Commissioners Litsky and McBee also both commented that the project shouldn't be getting another extension.
UPDATE: Here is the letter sent on behalf of DCHA to the Zoning Commission asking for the extension: it would be for two years, requiring building permits by July 1, 2014 and construction underway by July 1, 2015.
* CSX/Virginia Avenue Tunnel: The commissioners voted 6-0-1 to send this letter to the appropriate parties laying out the ANC's opinion on the plans to reconfigure the Virginia Avenue Tunnel. After listing the various ways that the proposed construction "would put people, homes, businesses, and fragile historic resources at risk," the letter states: "[W]e strongly believe that the best options for our community are for CSX to either leave the Virginia Avenue Tunnel in its current state (Concept 1) -- with the suggestion that if this option were chosen that the tunnel would be fully maintained for the safety of both the trains below and the communities above, or to reroute additional train traffic outside the District of Columbia [...] instead of in an expanded Virginia Avenue Tunnel." But, if the construction does occur, "it is absolutely imperative that the health and safety of our many residents, the economic and physical well-being of our businesses, parks, religious institutions, homes, and historic buildings, and the north-south access for all existing modes of transportation be preserved and enhanced." A number of Capitol Quarter residents in attendance also spoke in support of the ANC's support. The next public meeting on the plans for the tunnel will be May 21 at 6:30 pm at Nats Park.
One more recap post to go, probably tomorrow.
Comments (6)
   
 
 More About Canal Park

JDLand.com Home

Comments

Alex B. says: (5/15/12 1:48 PM)
160,000,000
4,000,000,000


Alex B. says: (5/15/12 1:48 PM)
160,000,000
4,000,000,000


Alex B. says: (5/15/12 1:51 PM)
Whoops! Apologies for the erroneous posts.

Just wanted to compare the costs of replacing the VA Ave tunnel in place (CSX estimated those at $160 million in 2010) and the costs of one of NCPC's bypass options (range $3.2-5.3 billion - split the difference and call it ~$4 billion).

$160,000,000
$4,000,000,000

That's a big difference.



JD says: (5/15/12 1:52 PM)
Whew, I thought you were being really snippy about a typo or something!


JES says: (5/15/12 2:20 PM)
Anyone else not realize until now how friggin' huge that ice rink is gonna be?


The Hoff says: (5/16/12 7:35 PM)
I'm with you, JES. I guess I figured that with a rink management company lined up it was going to be big enough to need it but I could never really picture it. It's going to be pretty great when it's all said and done.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Westnorth on Inching from Quarantining: Re: Half Street SE, the plan is a "woonerf design allows for flexible uses ...
Westnorth on Inching from Quarantining: On a webinar today with a presentation from Hickok Cole about 80 M St's vertical...
king of arabistan on Inching from Quarantining: Wholefoods and Harry’s is boarded up but open for business FYI.
GarfieldPark on Inching from Quarantining: Whole Foods boarded up and closed. Harry's has also been boarded up, not sure if...
JD on Inching from Quarantining: Raze applications have been filed for the buildings on the west side of the 1000...
VelocityChris on Inching from Quarantining: The substance of the article doesn't add clarity to whether Half St SE will or w...
Get JDLand Updates In Your Inbox!


Thousands and thousands of photos showing the neighborhood changing. More than 150 buildings no longer with us. All the news, since 2003. Photos from various archives showing the neighborhood in the more distant past. Maps from the early 1900s. Overhead Photo Comparisons: 1949, 1988, 2002-2008. All Blog Entries, 2003 - Present Major Events, 1799 - Present A series of blog entries looking at the neighborhood's history.
Near Southeast's Rearview Mirror


City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 1ST ST SE   BURGLARY
Burglary Two
 06/03/20
200 B/O M ST SE   BURGLARY
Burglary Two
 05/30/20
900 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/27/20
900 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/26/20
1000 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/24/20
1200 B/O VAN ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/23/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/20/20
1100 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/19/20
1100 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/19/20
1200 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/17/20
100 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/15/20
1200 B/O 4TH ST SE   ASSAULT WITH A DANGEROUS WEAPON  05/12/20
300 B/O WATER ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/07/20

Recent Issued Building Permits Archive  
1300 4TH ST SE RU-1   
05/14/20 
AP BOWER RETAIL LLC / null
P2006042 / SUPPLEMENTAL
1300 4TH ST SE   
05/08/20 
null / ;
P2005886 / SUPPLEMENTAL
   
05/15/20 
null / ;
P2006066 / SUPPLEMENTAL
929 5TH ST SE   
05/18/20 
CHRISTOPHER D FRENCH / CHRIS FRENCH; HERCULES FENCE OF MARYLAND, LLC HERCULES FENCE OF
F2000461 / CONSTRUCTION
1. Removal and replacement of front metal fence and gate in kind.  2. Removal and partial relocation of existing 6' tall wood fence in rear patio. The fence is currently approx. 30" inside the rear property line, and we intend to move the fence to our rear property line. The work includes removal of existing wood gate that opens from neighbor's property to our property along shared property line ...
300 M ST SE   
05/14/20 
AMENTUM / null
E2007609 / SUPPLEMENTAL
   
06/02/20 
FEDERAL CENTER LP / null
P2006421 / SUPPLEMENTAL
   
06/02/20 
FEDERAL CENTER LP / null
M2002616 / SUPPLEMENTAL
111 N ST SE   
05/07/20 
BROOKFIELD PROPERTIES / MAHMOUD KHACHAN; NA
SB2000288 / CONSTRUCTION
Drill temporary eight soil borings to a depth of 80 each at the existing parking lot at 111 N Street SE, Washington DC. The diameter of the borings is 6 inches. The borings will be grouted upon completion in accordance with DCRA requirements as indicated in the work plan.
1111 NEW JERSEY AVE SE   
05/12/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E2007563 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
05/19/20 
UNITED STATES OF AMERICA / null
M2002480 / SUPPLEMENTAL
   
05/19/20 
UNITED STATES OF AMERICA / null
P2006118 / SUPPLEMENTAL
   
06/02/20 
UNITED STATES OF AMERICA / ;
P2006429 / SUPPLEMENTAL
79 POTOMAC AVE SE APT 838   
05/29/20 
null / NA NA NA
EHOP20936871 / HOME OCCUPATION
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.