Since January, 2003

Advertise on JDLand
 (a random before-and-after moment)
February 16, 2006
August 29, 2015 
New Jersey at K, Looking Northeast (see more)

I've learned today that mega-developer Toll Brothers has purchased the Square 699N land directly north of the Velocity Condos building on 1st Street SE for $24 million, with the intention of building a 250ish-unit residential building.
This land has been owned by the Cohen Companies since their purchase of the entire block bounded by 1st, Half, K, and L in 2005.
In fact, the garage and below-grade structure for the Toll Brothers lot is already built--that's why you see all the funny beige boxes on the land, covering vent shafts and other infrastructure items. Cohen had planned to move forward with a sibling for Velocity soon after it completed the condo building, but that never came to fruition.
This would be Toll Brothers's first building in DC proper, I believe, but they have plenty of offerings in the Metro area. And, as I found out today, they don't just do single-family homes (White Flint Station is an example of a condo building of theirs in the area). UPDATE: SWill from across the way mentions in the comments that TB bought White Flint Station after it was completed and converted it to condos from apartments. Apologies for the assumption.
More to come on this, I'm sure. And it will no doubt be seen as another indication of the strength of Near Southeast's residential market.
[And I should add that Cohen still owns the third lot on the block, along Half Street.]
Comments (10)
   
 
 More About Toll Brothers Lots

JDLand.com Home

Comments

ZoolanderANDtheBoYz says: (5/2/12 1:29 PM)
I was hoping they would build a four or five start hotel. What do Toll brothers know about building a condo in a city any way. The one they built in white flint looks horrible link


sggunase says: (5/2/12 1:48 PM)
Interesting, I wonder if it will still be condos given the success of the rentals in the area.


SWill says: (5/2/12 2:18 PM)
BTW - Toll Brothers didn't build White Flint Station - they purchased the apartment complex and converted it to condos.


JD says: (5/2/12 2:20 PM)
Ah, thanks for the clarification.


ZoolanderANDtheBoYz says: (5/2/12 4:13 PM)
Interesting @Swill. So, they never built a big condo building like Velocity?


JD says: (5/2/12 4:24 PM)
No, they've built a number of them.

And I bet this might be the sort of branding this Square 699N project might come under:
link


ZoolanderANDtheBoYz says: (5/2/12 5:08 PM)
WOW awesome. Check this one out link It looks amazing.


Maelstrom says: (5/3/12 7:39 AM)
That looks like I'll never afford it. :P In other new (?) news, I rode past DPW last night (Wednesday) and it looked like teardown equipment is being lined up there that I had not noticed previously. It could be going down soon.


BillP says: (5/3/12 9:21 AM)
good find JD, the locations in manhattan and brooklyn should answer any concerns that they are not capable of building high quality projects in urban areas. one of the brooklyn projects is even certified LEED gold. clearly, cohen was not in a hurry to start phase 2. however, since toll made this purchase, we can infer they have a more aggressive timeframe in mind.


MJM says: (5/3/12 9:45 AM)
Yay! No more sculpture garden!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2015!
 Top News
  
Jaybird on Your Sunday Morning: Welcome back JD! That is one amazing pair of before and afters. Not sure where...
willinrm on Due South Opening: does anyone have a navy yard/eastern market/capitol hill happy hour website? dat...
Section314 on Due South Opening: First thing back, you can go take pictures of the construction starting at 99 M....
JD on Due South Opening: Me too! :-) I'll be back in the saddle next week, and well refreshed too, wit...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O POTOMAC AVE SE   THEFT F/AUTO
 08/17/15
500 B/O L ST SE   THEFT F/AUTO
 08/17/15
UNIT B/O K ST SE   THEFT F/AUTO
 08/16/15
500 B/O L ST SE   THEFT
 08/08/15
UNIT B/O I ST SE   BURGLARY
 08/07/15
300 B/O WATER ST SE   THEFT
 08/05/15
UNIT B/O I ST SE   THEFT
 08/04/15
50 B/O M ST SE   THEFT
 08/04/15
400 B/O M ST SE   THEFT
 08/03/15
1100 B/O NEW JERSEY AVE SE   THEFT
 07/29/15

Recent Issued Building Permits Archive  
1277 1ST ST SE   
08/11/15 
BALLPARK RESIDENTIAL LLC / RICHARD V CAREY
P1508164 / SUPPLEMENTAL
   
08/21/15 
BALLPARK RESIDENTIAL LLC BALLPARK RESIDENTIAL LLC / CLINT HOLMES; BALLPARK RESIDE BALLPARK RESIDENTIAL LLC; MITCH PERMUY
E20139177 / SUPPLEMENTAL
1000 5TH ST SE   
08/18/15 
UNITED STATES OF AMERICA / JOSEPH M MAGNOLIA
P1508371 / SUPPLEMENTAL
1150 5TH ST SE   
08/10/15 
DEPARTMENT OF GENERAL SERVICES DC PUBLIC SCHOOL / DEPARTMENT OF G DC PUBLIC SCHOOL
B1511234 / CONSTRUCTION
REVISION TO B1511107 TO CORRECT QUADANT ON ADDRESS FROM 1150 5TH STREET N.E. TO 1150 5TH STREET S.E. TO UPGRADE THE ELECTRICAL SERVICES OF A DISTRICT OF COLUMBIA PUBLIC SCHOOL FROM 1200AMP TO 3 000 AMP.
   
08/11/15 
PEPCO PEPCO
AH1500668 / CONSTRUCTION
INSTALLATION OF CABLE AND METERS
1220 12TH ST SE   
08/13/15 
WASHINGTON GAS LIGHT CO / JOHN GIUSEPPE-RAMCO
B1509350 / CONSTRUCTION
RENOVATIONS TO EXISTING 3RD FLOOR OFFICE SPACE EXELIS AS SHOWN ON THE ATTACHED MECH. PLUMB. ELECT. FIRE PROTECTION DEMOLITION AND ARCH. DWGS. INTERIOR WORK ONLY. NO CHANGE IN US. NO STRUCT. WORK.
909 HALF ST SE   
08/13/15 
BAKER DC LLC / CHRISTINE LONG
AH1500677 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 11:00PM FRIDAY THRU 11:00PM SATURDAY
   
08/18/15 
BAKER DC
AH1500686 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 12:01AM WEDNESDAY THRU 11:59PM THURSDAY. 1-49 BLOCK OF K ST SE
   
08/21/15 
BAKER DC / CHRISTINE LONG
AH1500695 / CONSTRUCTION
AN AFTER HOURS PERMIT IS FROM 12:01AM THRU 11:59PM FROM 08 / 25 / 2015 TO 08 / 29 / 2015
1015 HALF ST SE   
08/13/15 
HALF ST SE LLC / GREGORY E LIGON
E1508399 / SUPPLEMENTAL
   
08/17/15 
HALF ST SE LLC / ANTHONY G SAMBURG
E1508502 / SUPPLEMENTAL
   
08/20/15 
WSP PARSONS BRINCKERHOFF / STEVE AUD; WSP PARSONS BRINCKERHOFF; STEVE AUD
E95740122 / SUPPLEMENTAL
1220 HALF ST SE   
08/12/15 
BUFFALO WILD WINGS / NICOLE WHITE; BUFFALO WILD WINGS; GREG CONCANNON
AR49901357 / SUPPLEMENTAL
   
08/13/15 
BUFFALO WILD WINGS / BELA X-PEDITERS PLUS INC.
AH1500681 / CONSTRUCTION
WORK AFTER HOURS 7PM-7AM. 8 / 13 / 2015 TO 9 / 13 / 2015
601 L ST SE   
08/17/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KRISSY GER LISA LJ PERMIT
B1510955 / CONSTRUCTION
REVISION TO B1101058 MINOR GRADING REVISION
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502944 / SHOP DRAWING
TYPE OF ELEVATOR ONE (1) HYDRO / STEEL / CENTRALLY / PASSENGER TO PROVIDE ACCESS BETWEEN G AND G2 FLOORS AS PER PLANS.
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502945 / SHOP DRAWING
TYPE OF ELEVATOR: TWO (2) TRACTION / STEEL / CENTRALLY / PASSENGER (5TH FLOOR).
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502970 / SHOP DRAWING
TYPE OF ELEVATOR ONE (1) TRACTION / STEEL / CENTRALLY / PASSENGER (6TH FLOOR).
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502971 / SHOP DRAWING
TYPE OF ELEVATOR ONE (1) TRACTION / STEEL / CENTRALLY / PASSENGER (6TH FLOOR).
80 M ST SE   
08/24/15 
COLUMBIA PROPERTY TRUST / KRISTINA DELGADO
B1510944 / CONSTRUCTION
PARTIAL 4TH FLOOR RENOVATIONS INCLUDING MECHANICAL PLUMBING ELECTRICAL AS WELL AS FURNITURE INSTALLATION.
20 M ST SE   
08/19/15 
SOUTHEAST REALTY LLC / ELEANOR FARID; SOUTHEAST REALTY LLC; RODNEY CANNON
E69278004 / SUPPLEMENTAL
50 M ST SE   
08/11/15 
MILLER?LONG
TC1500036 / CONSTRUCTION
TOWER CRANE FOR JOB SITE USE
   
08/13/15 
MILLER?LONG MILLER?LONG
AH1500674 / CONSTRUCTION
AFTERHOURS TO PUT UP TOWERCRANE WITH 200 TON MOBILE CRANE SATURDAY 8 / 15 / 2015 AND 8 / 16 / 2015 FROM 5AM TO 9PM
   
08/14/15 
KCG 50 M LLC / JOSEPH E RICHARDS
E1508432 / SUPPLEMENTAL
   
08/21/15 
KCG 50 M LLC / DANIEL R. RUDE
P1508460 / SUPPLEMENTAL
55 M ST SE   
08/19/15 
DOUG OLSON / DOUG OLSON; NONE
SG1500414 / CONSTRUCTION
NEW SIGNS INSTALLATION AS PER PLANS
1100 NEW JERSEY AVE SE   
08/11/15 
CHRISTOPHER CONDON
PC69159304 / POST CARD
INTERIOR DEMOLITION OF NON-BEARING ELEMENTS IN A SPACE UP TO 5 000 SQUARE FEET (464.5 SQUARE METERS)
1500 SOUTH CAPITOL ST SE   
08/14/15 
P1508259 / SUPPLEMENTAL
301 WATER ST SE   
08/12/15 
LUMBER SHED LIC / ROBERT WATTS; LUMBER SHED LIC; ROBERT WATTS
E99575145 / SUPPLEMENTAL
355 WATER ST SE   
08/14/15 
TIAN LUU / TIAN LUU; TIAN LUU; JAMES BORROR
E95497821 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




     © Copyright 2015 JD.