Since January, 2003

Ad by HillAds
 (a random before-and-after moment)
August 12, 2006
July 28, 2014
1st at N, Looking North (see more)

Because of a need to burn off some calories before digging into my "Reeseter's Bunny" (milk chocolate-coated peanut butter bunny, which the label says is four servings [ha!] at 180 calories per), I did my usual wanderings this morning to grab updated photos around, Capper, 200 I, Canal Park, and the Boilermaker Shops. Alas, I did not hide any Easter eggs in any of these shots, nor did I find any.
The framing and Tyvek-ing is underway on 3rd Street south of L, in the shadow of the 300 M Street office building, as Capitol Quarter continues its march toward completion. I also took a lot of photos of other CQ Phase II blocks, so spend some time in the Capitol Quarter Phase 2 Expanded Photo Archive (and scroll down a bit) to hop through the many (many!) before-and-afters.
Then there's the Boilermaker Shops at the Yards, where some work was being done even on Easter Sunday. The walling off the interior space for the different tenants has begun, with the studs visible--and some drywall has even gone in on the mezzanine level, as seen at right, in a view from 4th Street, through what will be the Bluejacket space.
The work is on-going at Canal Park, but continues to not be terribly exciting from a photographic standpoint, unless you're wowed by images of new curbs. But the Canal Park Expanded Photo Archive can take you for a walk around the park's perimeter to see the current views, if you don't see it every day. (I also like my barbed wire shot [above right], the result of desperation after being without photos from the east side of 2nd and L for a very long time now. But, no, I didn't jump the fence.)
I also enjoyed being watched very closely by a USDOT security guard with a clipboard as I took photos of the park's progress from the south side of M Street. "What are you taking photos of?" she finally asked, trying to sound stern. "Stuff," I replied, as I smiled and kept walking.
There's also updated shots from 225 Virginia/200 I (seen at right), with the landscaping now starting to go in.
If you want to see today's entire batch (213 of 'em), here they are, remembering to click the fun little Click to see all available photos of this location. icon if you want to see the entire range of photos for a certain location. If you want even more new-ish pictures, here's photos I took around 1st and Half Streets on Tuesday, to get the Fairgrounds exterior into the official archive.
Now I need to go find that peanut butter bunny. I think I earned it.
Comments (7)
 
 More Recent News

JDLand.com Home

Comments

Kelsey25252 says: (4/10/12 9:47 AM)
Any pictures of the demolitions on Virginia Ave by NCC? Better hurry, there's not much left!


JD says: (4/10/12 9:49 AM)
I haven't been able to get over there, but a reader did send this tweet yesterday of the garage's demise: link



JD says: (4/10/12 10:16 AM)
[And, by the way.... I don't quite feel like mentioning this in an actual blog post yet, but I do feel like people should know that I've been battling some health issues for a few months now, and I'll probably continue to be less than 100% for a few months more. (I will be going under the knife in later May, if all goes according to plan.) So, if I seem like I'm blowing off some things, I'm really not--I have good days and bad days, and also just have to kind of pick my spots, especially when there's also my "real" job and the rest of my life to deal with, too. For instance, I was able to go out and get these photos on Sunday, but I had to give up and head home before I got all the ones I wanted--then I had to write the blog post a few hours later from the sofa, after a nap. :) So, bear with me for a little while longer. Thanks....]


Maelstrom says: (4/10/12 2:41 PM)
Get well soon, JD. I don't think anyone else could put all this information on the transformation of the neighborhood as well as you. You're irreplaceable.


JD says: (4/10/12 6:29 PM)
Thanks, M!


MJM says: (4/11/12 2:59 PM)
Yeah, best wishes for a speedy recovery


IMGoph says: (4/22/12 9:48 AM)
I'm glad you just said "stuff" to the guard, though a "none of your business, I'm on public property" would have been really baller. :)

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Tell readers about your apartment/house/item
for two weeks for $5.
Someone's looking for
what you're selling!
List it here.
Recent Comments:  
MJM on Community Center Groundbreaking: Too bad the new name wasn't a reflection of the area rather a housing development but guess it is a ...
JD on Community Center Groundbreaking: (And by the way, I've seen all those stories, and many more--it's the writing about them that I just...
ZoolanderANDtheBoYz on Community Center Groundbreaking: @JD, surgical bills-- no. Narcotics - a brother can hook you up with that.
conngs0 on Community Center Groundbreaking: Nice rendering. It even captures my future Audi R8 driving up the street! Seriously though, I thin...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
M ST SE AND HALF ST SE   ROBBERY /  08/17/14
800 B/O VIRGINIA AVE SE   THEFT F/AUTO /  08/17/14
M ST SE AND 5TH ST SE   THEFT F/AUTO /  08/15/14
1400 B/O 1ST ST SE   THEFT F/AUTO /  08/14/14
1000 B/O 1ST ST SE   BURGLARY /  08/12/14
800 B/O L ST SE   THEFT F/AUTO /  08/11/14
HALF ST SE AND L ST SE   THEFT F/AUTO /  08/11/14
1000 B/O NEW JERSEY AVE SE   THEFT /  08/07/14
1100 B/O 10TH ST SE   THEFT /  08/07/14
70 B/O I ST SE   THEFT /  08/02/14
100 B/O K ST SE   THEFT F/AUTO /  08/01/14
200 B/O L ST SE   THEFT F/AUTO /  07/30/14
L ST SE AND 2ND ST SE   THEFT F/AUTO /  07/30/14
70 B/O I ST SE   MOTOR VEHICLE THEFT /  07/29/14
70 B/O I ST SE   THEFT /  07/29/14
1100 B/O NEW JERSEY AVE SE   THEFT /  07/28/14
400 B/O K ST SE   THEFT /  07/24/14

Active Public Space Permits Archive  
1011 1ST ST SE    Pepco Holdings Inc 
Issued
excavation; new  
 06/26/14
to
08/26/14
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
908 3RD ST SE    Rachel Frankel 
Issued
streetfixture; new  
 07/24/14
to
09/21/14
1026 3RD ST SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/26/14
to
09/04/14
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15
913 5TH ST SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/26/14
to
08/28/14
1100 - 1199 BLOCK 1ST ST SE    tom cash 
Issued
excavation; new  
 06/27/14
to
08/25/14
410 M ST SE    Pepco Holdings Inc 
Issued
excavation; new  
 07/11/14
to
09/08/14
880 NEW JERSEY AVE SE    WASHINGTON GAS 
Issued
excavation; new  
 07/28/14
to
09/26/14
301 TINGEY ST SE    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1011 1ST ST SE   
08/06/14 
TOLL DC LP / MITCH A. PERMUY
E1407892 / SUPPLEMENTAL
   
08/11/14 
TOLL DC LP / ALBERT J. PEARCE
FB1400108 / SUPPLEMENTAL
1259 1ST ST SE   
08/11/14 
CAPITAL RIVERFRONT HOTEL LLC / CAPITAL RIVERFR HOTEL LLC
AH1400636 / CONSTRUCTION
AFTER HOURS FOR PERMIT NUMBER B1401471 FOR 8 / 12 THROUGH 9 / 11 FROM 5AM TO 7PM MONDAY THROUGH SATURDAY.
1212 4TH ST SE   
08/07/14 
TAKOREAN / FVI 2020
B1410615 / CONSTRUCTION
REVISION TO TL1400052 TO INCLUDE OUTDOOR SUMMER GARDEN WITH 14 SEATS AND 7 TABLES.
1201 4TH ST SE   
08/12/14 
JBG/FEDERAL CENTER LIC / JIM CALABRESE
AN1400129 / CONSTRUCTION
PLEASE EXTEND PERMIT AN1300174 THIS IS THE FIRST EXTENSION AND PERMIT WILL BE VALID UNTIL 1 / 31 / 2015.
1212 4TH ST SE   
08/05/14 
FC 1212 LLC / THE YARDS
TL1400165 / CONSTRUCTION
FIRST TIME TENANT LAYOUT FOR NEW MANAGEMENT OFFICE 2ND FLOOR TOTAL OF 780 SQ FT RENOVATION LIMIT TO MECHANICAL ELECTRIC AND FIRE LIFE SAFETY ONLY
1331 4TH ST SE   
08/14/14 
F. C. 1331 LLC / FVI 2020
B1402843 / CONSTRUCTION
CONSTRUCTION OF A BRAND NEW 11 STORY BUILDING. THE BUILDING IN TOTAL IS 350 000 SQ FT. ADDING 327 RESIDENTIAL RENTAL UNITS 20 000 SQ FT. IN COMMERCIAL SPACE AND 3 BELOW GRADE PARKING LEVELS.
   
08/15/14 
CLARK CONCRETE
AH1400650 / CONSTRUCTION
AFTER HOURS TO POUR CONCRETE ON JOBSITE FROM 7AM TO 7PM FROM SUNDAY TO SATURDAY 8 / 15 / 2014 TO 11 / 15 / 2014
1000 5TH ST SE   
08/07/14 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KIM MITCHELL CDKM CONSULTING LLC
FD1400029 / CONSTRUCTION
FOUNDATION TO GRADE TO INCLUDE UTILITIES
   
08/13/14 
UNITED STATES OF AMERICA /
FD1400132 / CONSTRUCTION
NEW FOUNDATION TO GRADE PERMIT FOR NEW COMMUNITY CENTER INCLUDING UTILITIES. REVISION TO FD1400029 TO REVISE STRUCTURAL DETAILS OF COLUMS.
   
08/20/14 
UNITED STATES OF AMERICA / BRUCE G. PICKETT
E1408304 / SUPPLEMENTAL
1015 HALF ST SE   
08/12/14 
HALF ST SE LLC / SAM HOLLEN RAMCO OF DC INC.
TL1400162 / CONSTRUCTION
INTERIOR TENANT LAYOUT OF 1ST FLOOR PERFORMANCE STUDIO SPACE AND OFFICE SPACE. PARTITIONS FURNITURE MECHANICAL ELECTRICAL AND LIFE SAFETY. CBS
   
08/15/14 
HALF ST SE LLC / ROBERT L HUNTER
M1402951 / SUPPLEMENTAL
   
08/16/14 
SAM HOLLEN / DONALD VEALS; SAM HOLLEN; DONALD VEALS
E83010192 / SUPPLEMENTAL
200 I ST SE   
08/08/14 
DANIEL RILEY / OMAR BIAGAS; DANIEL RILEY; JOHN BIAGAS
E47247428 / SUPPLEMENTAL
41 L ST SE   
08/20/14 
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY (WMATA) / SAMIR ALQUTRI - GEOTECHNICAL SOLUTIONS INC.
SB1400402 / CONSTRUCTION
GSI PLANS TO DRILL 4 SOIL TEST BORINGS TO CONFIRM SOIL STRENGTH WITH A HOLLOW-STEM AUGER EQUIPPED WITH A SPLIT SPOON SAMPLER FOR THE SPT N-VALUE TESTS DOWN TO A MAXIMUM DEPTH OF 80 FEET BELOW EXISTING GRADES. ALL BORINGS WILL BE DRILLED TO THE MAXIMUM DEPTH OR AUGER REFUSAL WHICHEVER OCCURS FIRST. THE BORE HOLES DIMENSION WILL BE 3.25 INCHES AND SHALL BE GROUTED UPON COMPLETION.
601 L ST SE   
08/06/14 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / JOSEPH M MAGNOLIA
P1407161 / SUPPLEMENTAL
20 M ST SE   
08/06/14 
SOUTHEAST REALTY LLC /
P1407613 / SUPPLEMENTAL
100 M ST SE   
08/06/14 
SQUARE 743 INC /
P1407610 / SUPPLEMENTAL
   
08/16/14 
NORTHWOOD INVESTERS LLC / STANLEY HUBBARD; NORTHWOOD INVESTERS LLC; STANLEY HUBBARD
E14516088 / SUPPLEMENTAL
901 M ST SE   
08/14/14 
CARLTON RAY
AH1400642 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1201 M ST SE   
08/14/14 
CARLTON RAY
AH1400641 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1111 NEW JERSEY AVE SE   
08/12/14 
NJA ASSOCIATES LLC / COLIN CLARK
B1308085 / CONSTRUCTION
CONSTRUCT A NEW 13 STORY APARTMENT BUILDING WITH THREE BELOW GRADE PARKING LEVELS FIRST FLOOR RETAIL A PRIVATE SWIMMING POOL PROJECTIONS OF BAY WINDOWS 324 UNITS TO INCLUDE MECHANICAL PLUMBING ELECTRICAL AND ELEVATOR WORK.
1500 SOUTH CAPITOL ST SE   
08/04/14 
LIVE NATION / DAVID VEGA
AH1400629 / CONSTRUCTION
TO CLOSE OFF STREETS FOR LOADING AND UNLOADING OF STADIUM EVENTS 7PM - 7AM
300 TINGEY ST SE   
08/05/14 
FC BOILERMAKER LLC / PHILLIP B MOBLEY
M1402818 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.