Since January, 2003
            
 Page Through from Before to After

When last I visited the Foundry Lofts, it was about a month before the first residents moved in. I took a pile of photos, but while model units were furnished, a lot of the shared spaces were still being worked on. So I finally made a return visit this week to see all the finishing touches on the interior courtyard, lobby, community room, etc. And I took one or two photographs, of course.
The leasing office tells me that the 170-unit building is now about 65 percent leased and 40 percent occupied, and construction on the non-retail spaces is not far from 100 percent completion. The four priciest units--the corner penthouses, which were announced with rents in the $4,500 range--are all taken. And the two eateries in the ground floor--Potbelly and Kruba Thai and Sushi--have their building permits and are working toward opening within 90 days.
Also, because I can't walk past the Boilermaker Shops without taking pictures, I added a few new shots to that page, including the panorama at right that I got from one of the Foundry Loft patios.
As if this all isn't exciting enough, here's a first terribly not exciting photo of the excavation underway at the 1212 4th/Teeter site a block east of the Foundry Lofts and across the street from Boilermaker.
Plus, since I had to walk down 4th Street to get to all of this, I snapped some shots of the continuing Capitol Quarter progress at K and L.
Comments (1)
   
 
 More Recent News

JDLand.com Home

Comments

thedofc says: (1/26/12 1:08 PM)
I really wanna live there. It looks amazing!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

bdj on Meet the New: Anyone heard any rumors about what's going into Crossing DC? With the news about...
Jscott280 on Meet the New: Also heard that they are close to naming a replacement for punchbowl social, as ...
Jscott280 on Meet the New: @jd: I do not have a link yet. I spoke to the construction crew that is building...
JD on Meet the New: @JScott280: I am intrigued by your Silver Diner tidbit. Do you have a link?
Blorty on Meet the New: @JD - I think it's been lapped by the new Douglass bridge (original announcement...
JD on Meet the New: On the Bridge Park, let's go to the videotape. On track for 2023: https://dc....
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1300 4TH ST SE 1001   
02/22/21 
AP BOWER RETAIL LLC / null
E2104231 / SUPPLEMENTAL
1346 4TH ST SE APT 1M   
02/06/21 
null / NA NA NA
EHOP21945129 / HOME OCCUPATION
1331 4TH ST SE R-2   
02/08/21 
FC 1331 LLC / FC 1331 LLC
BP2101814 / POST CARD
10 I ST SE   
02/16/21 
CAPITOL HILL RACQUET CLUB / NA; VICTORIA STEINHOFF
SB2100112 / CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
555 L ST SE   
01/29/21 
UNITED STATES OF AMERICA / RENNE WELL; RICK HARLAN SCHNEIDER
B2102004 / CONSTRUCTION
DGS PROJECT REHABILITATION+RESTORATION OF THE HISTORIC LINCOIN FIELDHOUSE
861 NEW JERSEY AVE SE 20003   
02/23/21 
809-853 NEW JERSEY AVE ACQUISITION LLC / SUSANA VAZQUEZ
AH2100728 / CONSTRUCTION
Dismantling of tower crane.
809 NEW JERSEY AVE SE   
02/11/21 
GREYSTAR GP LLC 809-853 NEW JERSEY AVENUE ACQUISITION LLC / null
E2103926 / SUPPLEMENTAL
853 NEW JERSEY AVE SE   
02/11/21 
GREYSTAR GP LLC / null
E2103924 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
02/05/21 
GS CSX HOTEL OWNER LLC / null
E2103762 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
02/02/21 
FC 1275 NJ LLC / null
E2103662 / SUPPLEMENTAL
   
02/11/21 
FC 1275 NJ LLC / null
P2103445 / SUPPLEMENTAL
848 SOUTH CAPITOL ST SE   
02/16/21 
CXS TRANSPORTATION INC / VICTORIA STEINHOFF; TBD
SB2100111 / CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2021 JD.