I almost can't bring myself to write the words, but the owners of the Florida Rock site just south of Nationals Park have filed with the Zoning Commission for not only the previously reported plan to change the planned first phase office building to a residential one, but also to revisit parts of the site plan for the three subsequent phases. (For those of you versed in zoning speak, they are requesting to "revert Phases II, III, and IV to First Stage Approvals with modifications.")
This is going to be a lengthy process, with hearings at the Zoning Commission, reports from the Office of Planning and others, and presentations to the ANC (starting with one this coming Monday night, Dec. 12). So I'm going to avoid getting into the weeds too much too early, and will just give some bullet points of what changes they are looking for. (You're free to read these 57 pages of the filing for more detail.)
* The new Phase 1 building, at the far east end of the site (next to Diamond Teague Park) will now be the aforementioned residential building, a nine-story U-shaped design oriented toward the river with 300-350 units and 286 below-grade parking spaces. There will still be 12,500 square feet of retail, though they are asking that 7,000 of it be "flex space" that "may alternatively be dedicated to residential amenity space" until retail gets going. There will be a private courtyard within the "U", but there will also be the open space on the buildings' east side, now dubbed Anacostia Plaza, that will be open enough to maintain open views from First Street and the stadium's Grand Staircase to the river but will also provide "passive recreation space."
* The esplanade that has always been such a big part of the site plan remains, acting as the portion of the Anacostia Riverwalk Trail connecting South Capitol Street to Teague Park, the new pedestrian bridge, and the Yards Park. The Esplanade will "relate" to the "design vernacular" of the newly constructed boardwalks, and will also have a lot of stormwater management and bio-filtration offerings.
* On the building's west side will be the "Mews," which they call a pedestrian boulevard separating the Phase 1 building from the planned Phase 2 residential building. This path will also provide access to parking and loading for the first two phases, but "a dynamic paving design . . . will help distinguish this area as an urban space that privileges pedestrians over vehicles."
* The filing says they anticipate construction to begin in the second quarter of 2013, with first move-ins in early 2015 and the entire phase completed by summer 2015.
As for overall changes, here's what seem to be the most interesting changes from the previously approved design that the developers are looking for:
* The new plan would bring 1,164,640 square feet of gross floor area (4.6 FAR), up from 1,115,400 sq ft/4.4 FAR in the last plan. The other three phases' uses would remain unchanged (residential, office, hotel).
* Building heights of 130 feet for Phase 2-4 are being requested, compared to 130/112/130 last time around.
* Below-grade parking spaces would go from 1,010 to 1,144.
Plus, though It's hard to tell from one small site plan concept drawing, a lot of the public space design, especially to the east of the Phase 3 and 4 buildings, looks scaled back from the 2008 design. (UPDATE: Here's a graphic put together from another part of the filing that compares the 2008 site plan with the current one.)
The filing also says that "the Applicant would like the flexibility to provide interim uses on Phases, II, III, IV so that the site will not simply lay dormant pending construction," and lists a park, a farmers market, or other "simple, temporary retail uses" as examples.
And, just as in the previous plans, development of phases 3 and 4 are completely dependent on the construction of a new South Capitol Street Bridge, since the current bridge bisects the property where those buildings are planned.
Again, this is early in this new process, and there will be plenty of filings and presentations to come for all the additional detail you're going to be clamoring for. For now, the takeaway is that FRP/MRP want to get started on a residential building at 1st and Potomac in the spring of 2013, and still want to move forward on the rest of the site with a design similar to what was approved 3 1/2 years ago, but with some modifications.
This project first began its zoning quest in 1998, and went through a four-year process ending in 2008 to get its second-stage approvals. I should also note that Davis Buckley Architects, who worked on the project throughout that 10-year ordeal, is no longer part of the design team; SK&I is now on board, with Oculus as the landscape design firm. The site's owners, FRP Development/Florida Rock Properties, announced their partnership with MRP Realty earlier this year.
(As for the concrete plant currently on site, I haven't looked lately, but demolition is underway, and the filing says it should be done by the end of the year. Tom Boswell's heart will be broken.)
UPDATE, 1/3: Just before Christmas, demolition was finished on the plant, making it #166 in my Demolished Buildings Gallery.
Comments (3)
   
 
 More About Florida Rock
 All posts: Florida Rock, zoning

JDLand.com Home

Comments

lester says: (12/9/11 3:15 PM)
130 feet tall? That's curious.

The area is zoned W-2, which would traditionally allow for up to 60 feet. It's part of the capital gateway overlay, which is designed "to reduce the height and bulk of buildings along the Anacostia riverfront."

Then DC goes ahead and approved (previously) 130/112/130 foot tall buildings (Phase II, III, and IV, not sure what Phase I will be). Wow. The wonders of the PUD (which basically nullifies the W-2 and CG designation).

However, moving past these decisions, how on earth do they justify 130 feet with respect to the Heights of Building Act of 1910? To allow a 130 foot tall building, you would need to have either South Capitol or Potomac be 110' wide, and as best as I can estimate from the DC property records web site, they are at most 90' wide. What gives?

Either way, it seems silly to develop an overlay to reduce height and bulk near the Anacostia riverfront, and then approve four buildings on the waterfront 100+ feet high...

Mind you, from where I live, the buildings won't really impact my view at all, I just find it all very... strange.


JD says: (12/9/11 3:22 PM)
Phase I was originally approved at 92 feet; they're requesting 95 feet this time.

There's a fair amount of discussion of the zoning starting around page 11 in the document I link to above, which says that CG/W-2 (the Capitol Gateway overlay) allows for max heights of 130 ft in mixed-use developments. (Purely commercial buildings can only be 60 feet high; the CG overlay gives the opportunity for increased density by developing mixed-use.)

Here's the Capitol Gateway Overlay, if you want to read: link




IMGoph says: (12/17/11 12:17 AM)
I like the fact that the building footprints aren't curvy like the Watergate anymore. That footprint just felt contrived.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2016!
 Top News

conngs0 on Whaley's Announces May: Sounds like a good spot. Any early reviews?
Westnorth on Whaley's Announces May: @JES: Talked with a server today, and it'll be just inland of the bridge's easte...
JD on Training Ship Freedom: (I keep meaning to add the option to include one image with comments, but haven'...
Ampersand on Training Ship Freedom: I can't figure out how to put a picture in this comment, but I saw the Freedom S...
  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 05/21/16
800 899 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/16/16
1000 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/15/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 05/15/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 05/15/16
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/12/16
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/11/16
1200 B/O I ST SE   ROBBERY  05/08/16
900 B/O 1ST ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/08/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/06/16
1220 HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/05/16
1100 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 05/04/16
300 K ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 05/04/16
70 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/02/16
UNIT B/O I ST SE   ROBBERY  04/29/16
1100 B/O 5TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 04/27/16
200 B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 04/25/16
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 04/24/16
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/24/16

Recent Issued Building Permits Archive  
1233 1ST ST SE   
05/10/16 
null / KONE INC
EN1602126 / SHOP DRAWING
TYPE OF ELEVATOR : TWO (2) ELECTRICAL / STEEL / CENTER / PASSENGER / 3 FLOORS ELEVATOR 5 & 6 CONDITION : APPLICATION FOR MODIFICATION OF CONSTRUCTION CODE MVQ1600083 & MVQ1600084 SEE : B1403486 AND TL1600011
1108 2ND ST SE   
05/19/16 
NA DISTRICT OF COLUMBIA HOUSING AUTHORITY / NA DISTRICT OF COLUMBIA HOUSING AUTHORITY; ECS MID-ATLANTIC LLC
SB1600233 / CONSTRUCTION
THREE BORINGS WILL BE COMPLETED UTILIZING A GEOPROBE DIRECT PUSH DRILL RIG USING A DUEL TUBE SAMPLING DEVICE. THE BORINGS WILL CREATE A 2.25 INCH ANULUS. THE GEOPROBE WILL ADVANCE ALL 3 BORINGS TO A DEPTH OF 30 FEET BELOW GROUND SURFACE OR UNTIL REFUSAL OR DENSE CLAY IS ENCOUNTERED. FOLLOWING COMPLETION OF THE SOIL BORINGS HOLES WILL BE TREMME GROUTED FROM THE BOTTOM TO THE TOP USING A MIXTURE OF ...
1331 2ND ST SE   
05/16/16 
DC WATER / DC WATER; CORMAN CONSTRUCTION
AH1600698 / CONSTRUCTION
AFTER HOURS WORK FOR STRUCTURE EXCAVATION AND SUPPORT FOR B1311474 & B1605659 DC WATER, CORMAN CONSTRUCTION 202-863-0052
1005 3RD PL SE   
05/04/16 
PETER TRIFU / PETER TRIFU; MOHAMED ABDELMOTY
B1607724 / CONSTRUCTION
I WOULD LIKE TO INCREASE THE SIZE OF MY BATHROOM FROM 3 FEET BY 6 FEET TO 3 FEET BY 7 FEET 3 INCHES AND ADD A SHOWER. THE WEST WALL WILL BE EXTENDED 9 INCHES INTO AN EXISTIMG CLOSET AND THE EAST WALL WILL BE EXTENDED 6 INCHES INTO OPEN LIVING SPACE. THE DRAIN AND PLUMBING WILL BE MODIFIED TO ACCOMIDATE THE NEW POSITION OF THE EXISTING SINK, TOILET AND THE ADDITION OF THE SHOWER. THE DOOR WILL BE M...
   
05/12/16 
PETER D TRIFU / JOSE M. MORALES
P1606192 / SUPPLEMENTAL
1300 4TH ST SE   
05/10/16 
LOU FOREST CITY - WASHINGTON / GEORGE MORETRENCH AMERICAN CORP.
SB1600070 / CONSTRUCTION
TO DRILL AND INSTALL 18 DEEP WELLS WITH 12" DIAMETER OF BOREHOLE AND 6" WELL CASING, AND 4 OBSERVATION WELLS WITH 6" DIAMETER OF BOREHOLE AND 2" WELL CASING TO 80 FEET VIA MUD ROTARY DRILLING FOR THE TEMPORARY CONSTRUCTION DEWATERING OF THE PROPOSED BELOW GRADE CONSTRUCTION. ALL DRILL SPOILS WILL BE CONTAINED AND DISPOSED OF ACCORDING TO FEDERAL AND DISTRICT OF COLUMBIA REGULATIONS.
1220 12TH ST SE 200   
05/11/16 
WASHINGTON GAS LIGHT CO / RALPH THREATT
E1606272 / SUPPLEMENTAL
1220 12TH ST SE   
05/11/16 
CORPORATE OFFICE PROPERTIES TRUST / KELLY WALSH; CORPORATE OFFICE PROPERTIES TRUST; THOMAS DVORAK
E74440979 / SUPPLEMENTAL
909 HALF ST SE   
05/05/16 
null / MARK A DORSEY
EN1601560 / SHOP DRAWING
TYPE OF ELEVATOR : ONE (1) TRACTION / STEEL / CENTRALLY / VERTICAL TRANSPOTATION (2ND FLOOR)
1210 HALF ST SE   
05/04/16 
HINES GLOBAL / CARLOS MONTES; HINES GLOBAL; CARLOS MONTES
P42209552 / SUPPLEMENTAL
   
05/04/16 
HINES GLOBAL / CARLOS MONTES; HINES GLOBAL; CARLOS MONTES
G36907854 / SUPPLEMENTAL
70 I ST SE 832   
05/17/16 
null / NA NA NA
EHOP1690678 / HOME OCCUPATION
10 I ST SE   
05/19/16 
TIMOTHY TEMPLE- CAPITAL HILL RACQUET CLUB / TIMOTHY TEMPLE- CAPITAL HILL RACQUET CLUB; ECS MID-ATLANTIC LLC
SB1600232 / CONSTRUCTION
FIVE BORINGS WILL BE COMPLETED UTILIZING A GEOPROBE DIRECT PUSH DRILL RIG USING A DUEL TUBE SAMPLING DEVICE. THE BORINGS WILL CREATE A 2.25 INCH ANULUS. THE GEOPROBE WILL ADVANCE ALL 5 BORINGS TO A DEPTH OF 30 FEET BELOW GROUND SURFACE OR UNTIL REFUSAL OR DENSE CLAY IS ENCOUNTERED. FOLLOWING COMPLETION OF THE SOIL BORINGS HOLES WILL BE TREMME GROUTED FROM THE BOTTOM TO THE TOP USING A MIXTURE OF P...
201 L ST SE   
05/19/16 
NA DISTRICT OF COLUMBIA HOUSING AUTHORITY / NA DISTRICT OF COLUMBIA HOUSING AUTHORITY; ECS MID-ATLANTIC LLC
SB1600234 / CONSTRUCTION
TWO BORINGS WILL BE COMPLETED UTILIZING A GEOPROBE DIRECT PUSH DRILL RIG USING A DUEL TUBE SAMPLING DEVICE. THE BORINGS WILL CREATE A 2.25 INCH ANULUS. THE GEOPROBE WILL ADVANCE BOTH BORINGS TO A DEPTH OF 30 FEET BELOW GROUND SURFACE OR UNTIL REFUSAL OR DENSE CLAY IS ENCOUNTERED. FOLLOWING COMPLETION OF THE SOIL BORINGS HOLES WILL BE TREMME GROUTED FROM THE BOTTOM TO THE TOP USING A MIXTURE OF POW...
14 M ST SE   
05/16/16 
ANDREW ROYALS
B1608241 / CONSTRUCTION
REPAIR AND REPLACEMENT OF WINDOW AND FRAME
50 M ST SE   
05/18/16 
KCG 50 M LLC ENGLEWOOD LLC / TIEVY; KCG 50 M LLC ENGLEWOOD LLC; TRACIE CLAXTON-RAMOS
SG1600300 / CONSTRUCTION
2 SIGNS CHANNEL LETTERS ILLUMINATED 2 BLADE SIGNS ILLUMINATED
100 M ST SE   
05/04/16 
SQUARE 743 INC / MICHAEL A. BONDS
P1605993 / SUPPLEMENTAL
   
05/19/16 
SQUARE 743 INC AND 100 M ST SE LLC / LHREV WASHINGTON M STREET LLC A DELAWARE LLC; KIM MITCHELL CDKM CONSULTING LLC
B1605938 / CONSTRUCTION
APPROX 7938 SF TENANT FIT OUT - CURRENTLY SHELL CONDITION - FLOORING, DOORS, AND HARDWARE, DRYWALL, CEILILNG, LIGHTS, MECHANICAL, SPRINKLER AND PLUMBING TO BE ADDED. ALL WORK TO BE DONE ON 7TH FLOOR
800 NEW JERSEY AVE SE   
05/10/16 
SQUARE 737 LLC / KONE INC
EN1602094 / SHOP DRAWING
TYPE OF ELEVATOR : TWO (2) ELECTRICAL / STEEL / CENTER / PASSENGER / 3 FLOORS CONDITION: APPLICATION FOR MODIFICATION OF CONSTRUCTION CODE MVQ1600091 & MVQ160092
   
05/10/16 
SQUARE 737 LLC / KONE INC
EN1602095 / SHOP DRAWING
TYPE OF ELEVATOR : THREE (3) ELECTRICAL / STEEL / CENTER / PASSENGER / 3 FLOORS ELEVATOR : G1, G2, G3 CONDITION: APPLICATION FOR MODIFICATION OF CONSTRUCTION CODE MVQ1600090 & MVQ160089 & MVQ1600088
   
05/10/16 
SQUARE 737 LLC / KONE INC
EN1602107 / SHOP DRAWING
TYPE OF ELEVATOR : ONE (1) ELECTRICAL / STEEL / CENTER / PASSENGER / 2 FLOORS ELEVATOR : G6, CONDITION: APPLICATION FOR MODIFICATION OF CONSTRUCTION CODE MVQ1600093
861 NEW JERSEY AVE SE   
05/18/16 
NA CSX TRANSPORTATION, INC.
AH1600719 / CONSTRUCTION
WORK IN PUBLIC ROW WITHIN THE VIRGINIA AVENUE TUNNEL RECONSTRUCTION PROJECT LOD FOR UTILITY, DEMOLITION, AND CONCRETE STRUCTURE CONSTRUCTION ACTIVITIES. ACTIVITIES WILL OCCUR AT THE FOLLOWING AREAS: BETWEEN 2ND STREET SE AND 3RD STREET SE ALONG VIRGINIA AVENUE SE, INTERSECTION OF 3RD STREET SE AND VIRGINIA AVENUE SE, BETWEEN 3RD STREET SE AND 4TH STREET SE ALONG VIRGINIA AVENUE SE, INTERSECTION OF...
880 NEW JERSEY AVE SE   
05/19/16 
880 NEW JERSEY AVENUE LLC / 880 NEW JERSEY AVENUE LLC; BRUCE PADDOCK SWIMMING POOL COMPANY
SP1600027 / CONSTRUCTION
1ST, 2ND 3RD, AND 4TH EXTENSION TO PERMIT SP1300053 TO EXPIRE 6 / 18 / 2016
1200 NEW JERSEY AVE SE 1ST FLR 20024   
05/06/16 
JBG/FEDERAL CENTER LLC / null
P1606040 / SUPPLEMENTAL
1000 NEW JERSEY AVE SE   
05/05/16 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / . WATERFRONT CHURCH
B1607854 / CONSTRUCTION
REMODEL TWO BATHROOMS, REPLACE LIGHTING IN BATHROOM S & VESTIBULE -IN EXISTING BOXING - FITNESS CENTER UNDER CO1301802 NO CHANGE OF USE
1244 SOUTH CAPITOL ST SE   
05/05/16 
1244 SOUTH CAPITOL RESIDENTIAL, L.L.C. / CLARK CONCRETE CLARK CONCRETE
AH1600676 / CONSTRUCTION
AFTER HOURS TO LOAD AND UNLOAD TRUCKS FOR MATERIAL AND CONCRETE FROM 5 / 7 / 2016, 12 MIDNIGHT TO 5 / 9 / 2016 7AM
300 TINGEY ST SE 1ST/2ND   
05/11/16 
FC BOILERMAKER LLC / WILLIAM P SAUREST
P1606136 / SUPPLEMENTAL
300 TINGEY ST SE 202   
05/11/16 
FC BOILERMAKER LLC / WILLIAM P SAUREST
P1606138 / SUPPLEMENTAL
300 TINGEY ST SE   
05/11/16 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS
M1602037 / SUPPLEMENTAL
   
05/11/16 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS
M1602039 / SUPPLEMENTAL
355 WATER ST SE   
05/18/16 
PAUL GRUBER NEW BELGIUM BREWING COMPANY
TN1600129 / CONSTRUCTION
SPECIAL EVENT TOUR DE FAT 1 36X24 STAGE 5 20X20 TENTS 1 20X20 HEXAGON TENT NO GENERATORS
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2016 JD.