Since January, 2003

Ad by Google
 (a random before-and-after moment)
May 27, 2006
April 26, 2015
Half at N, Looking Northeast (see more)

I almost can't bring myself to write the words, but the owners of the Florida Rock site just south of Nationals Park have filed with the Zoning Commission for not only the previously reported plan to change the planned first phase office building to a residential one, but also to revisit parts of the site plan for the three subsequent phases. (For those of you versed in zoning speak, they are requesting to "revert Phases II, III, and IV to First Stage Approvals with modifications.")
This is going to be a lengthy process, with hearings at the Zoning Commission, reports from the Office of Planning and others, and presentations to the ANC (starting with one this coming Monday night, Dec. 12). So I'm going to avoid getting into the weeds too much too early, and will just give some bullet points of what changes they are looking for. (You're free to read these 57 pages of the filing for more detail.)
* The new Phase 1 building, at the far east end of the site (next to Diamond Teague Park) will now be the aforementioned residential building, a nine-story U-shaped design oriented toward the river with 300-350 units and 286 below-grade parking spaces. There will still be 12,500 square feet of retail, though they are asking that 7,000 of it be "flex space" that "may alternatively be dedicated to residential amenity space" until retail gets going. There will be a private courtyard within the "U", but there will also be the open space on the buildings' east side, now dubbed Anacostia Plaza, that will be open enough to maintain open views from First Street and the stadium's Grand Staircase to the river but will also provide "passive recreation space."
* The esplanade that has always been such a big part of the site plan remains, acting as the portion of the Anacostia Riverwalk Trail connecting South Capitol Street to Teague Park, the new pedestrian bridge, and the Yards Park. The Esplanade will "relate" to the "design vernacular" of the newly constructed boardwalks, and will also have a lot of stormwater management and bio-filtration offerings.
* On the building's west side will be the "Mews," which they call a pedestrian boulevard separating the Phase 1 building from the planned Phase 2 residential building. This path will also provide access to parking and loading for the first two phases, but "a dynamic paving design . . . will help distinguish this area as an urban space that privileges pedestrians over vehicles."
* The filing says they anticipate construction to begin in the second quarter of 2013, with first move-ins in early 2015 and the entire phase completed by summer 2015.
As for overall changes, here's what seem to be the most interesting changes from the previously approved design that the developers are looking for:
* The new plan would bring 1,164,640 square feet of gross floor area (4.6 FAR), up from 1,115,400 sq ft/4.4 FAR in the last plan. The other three phases' uses would remain unchanged (residential, office, hotel).
* Building heights of 130 feet for Phase 2-4 are being requested, compared to 130/112/130 last time around.
* Below-grade parking spaces would go from 1,010 to 1,144.
Plus, though It's hard to tell from one small site plan concept drawing, a lot of the public space design, especially to the east of the Phase 3 and 4 buildings, looks scaled back from the 2008 design. (UPDATE: Here's a graphic put together from another part of the filing that compares the 2008 site plan with the current one.)
The filing also says that "the Applicant would like the flexibility to provide interim uses on Phases, II, III, IV so that the site will not simply lay dormant pending construction," and lists a park, a farmers market, or other "simple, temporary retail uses" as examples.
And, just as in the previous plans, development of phases 3 and 4 are completely dependent on the construction of a new South Capitol Street Bridge, since the current bridge bisects the property where those buildings are planned.
Again, this is early in this new process, and there will be plenty of filings and presentations to come for all the additional detail you're going to be clamoring for. For now, the takeaway is that FRP/MRP want to get started on a residential building at 1st and Potomac in the spring of 2013, and still want to move forward on the rest of the site with a design similar to what was approved 3 1/2 years ago, but with some modifications.
This project first began its zoning quest in 1998, and went through a four-year process ending in 2008 to get its second-stage approvals. I should also note that Davis Buckley Architects, who worked on the project throughout that 10-year ordeal, is no longer part of the design team; SK&I is now on board, with Oculus as the landscape design firm. The site's owners, FRP Development/Florida Rock Properties, announced their partnership with MRP Realty earlier this year.
(As for the concrete plant currently on site, I haven't looked lately, but demolition is underway, and the filing says it should be done by the end of the year. Tom Boswell's heart will be broken.)
UPDATE, 1/3: Just before Christmas, demolition was finished on the plant, making it #166 in my Demolished Buildings Gallery.
Comments (3)
   
 
 More About Florida Rock
 All posts: Florida Rock, zoning

JDLand.com Home

Comments

lester says: (12/9/11 3:15 PM)
130 feet tall? That's curious.

The area is zoned W-2, which would traditionally allow for up to 60 feet. It's part of the capital gateway overlay, which is designed "to reduce the height and bulk of buildings along the Anacostia riverfront."

Then DC goes ahead and approved (previously) 130/112/130 foot tall buildings (Phase II, III, and IV, not sure what Phase I will be). Wow. The wonders of the PUD (which basically nullifies the W-2 and CG designation).

However, moving past these decisions, how on earth do they justify 130 feet with respect to the Heights of Building Act of 1910? To allow a 130 foot tall building, you would need to have either South Capitol or Potomac be 110' wide, and as best as I can estimate from the DC property records web site, they are at most 90' wide. What gives?

Either way, it seems silly to develop an overlay to reduce height and bulk near the Anacostia riverfront, and then approve four buildings on the waterfront 100+ feet high...

Mind you, from where I live, the buildings won't really impact my view at all, I just find it all very... strange.


JD says: (12/9/11 3:22 PM)
Phase I was originally approved at 92 feet; they're requesting 95 feet this time.

There's a fair amount of discussion of the zoning starting around page 11 in the document I link to above, which says that CG/W-2 (the Capitol Gateway overlay) allows for max heights of 130 ft in mixed-use developments. (Purely commercial buildings can only be 60 feet high; the CG overlay gives the opportunity for increased density by developing mixed-use.)

Here's the Capitol Gateway Overlay, if you want to read: link




IMGoph says: (12/17/11 12:17 AM)
I like the fact that the building footprints aren't curvy like the Watergate anymore. That footprint just felt contrived.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2015!
 Top News
  
rpyxyz on Marines Pick Existing: This sounds like the right pick for all people involved. That "nice, big, fou...
JES on Marines Pick Existing: Excellent news from a land use perspective
conngs0 on More Zoning News: Thanks, JD! I agree that the newest rendering is a tremendous improvement over t...
JD on More Zoning News: If you read this post when I first put it up, check out the new versions of thre...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O M ST SE   THEFT
2nd Degree
 07/02/15
500 B/O M ST SE   THEFT F/AUTO
 06/28/15
1000 B/O 1ST ST SE   THEFT
2nd Degree - Parking Lot/ Garage
 06/28/15
1100 B/O NEW JERSEY AVE SE   THEFT
 06/28/15
400 B/O M ST SE   THEFT
2nd Degree - Grocery/ Supermarket
 06/25/15
300 B/O TINGEY ST SE   THEFT
 06/24/15
900 B/O 3RD ST SE   THEFT F/AUTO
Theft From Auto 1 - / Unknown
 06/23/15
1100 B/O NEW JERSEY AVE SE   THEFT
2nd Degree - Construction Site
 06/23/15
1100 B/O 1ST ST SE   THEFT
2nd Degree - Residence/ Home
 06/22/15
1000 B/O K ST SE   MOTOR VEHICLE THEFT
Unauthorized Use Of Vehicle
 06/22/15
1100 B/O 1ST ST SE   THEFT F/AUTO
- Parking Lot/ Garage
 06/21/15
1000 B/O 8TH ST SE   THEFT F/AUTO
 06/20/15
800 B/O L ST SE   THEFT F/AUTO
 06/20/15
   THEFT
2nd Degree
 06/19/15
54 B/O M ST SE   THEFT F/AUTO
 06/19/15
400 B/O M ST SE   ASSAULT W/DANGEROUS WEAPON
Adw -- Other Dangerous Weapon - Public Housing Project
 06/19/15
400 B/O M ST SE   THEFT
 06/14/15
K & HALF ST SE   THEFT F/AUTO
 06/11/15
1300 B/O 4TH ST SE   ASSAULT W/DANGEROUS WEAPON
 06/11/15
UNIT B/O K ST SE   THEFT F/AUTO
 06/11/15
VIRGINIA AVE & 8TH ST SE   THEFT F/AUTO
 06/10/15
8TH & L ST SE   THEFT F/AUTO
 06/10/15
500 B/O M ST SE   THEFT
 06/09/15
1100 B/O 1ST ST SE   THEFT
 06/09/15
900 B/O NEW JERSEY AVE SE   THEFT
 06/07/15
L & HALF ST SE   MOTOR VEHICLE THEFT
 06/06/15

Recent Issued Building Permits Archive  
1011 1ST ST SE   
06/24/15 
NA NA NA
EHOP1590680 / HOME OCCUPATION
1265 1ST ST SE   
06/25/15 
HAMPTON INN / TIM MEALEY SIGNS; NONE
SG1500270 / CONSTRUCTION
INSTALL SIGN 37.3 FT X 4FT INSTALL 1'X9' SIGN ABOVE THE DOOR
1277 1ST ST SE   
06/23/15 
ANCHOR CONSTRUCTION
AH1500523 / CONSTRUCTION
EXCAVATION CATCH BASINS MANHOLE INSTALLATION SEWER MAIN LINE SEWER SERVICE LATERAL
1331 2ND ST SE   
06/29/15 
CORMAN CONSTRUCTION
AH1500543 / CONSTRUCTION
TUNNEL BORING MACHINE ? EQUIPMENT
1000 5TH ST SE   
06/17/15 
DISTRICT OF COLUMBIA /
P1506682 / SUPPLEMENTAL
909 HALF ST SE   
06/29/15 
23 I LLC C/O RELATED COMPANIES / PITTINGER-DUNHA CAPITOL PERMITS
FD1500043 / CONSTRUCTION
FOUNDATION-TO-GRADE ONLY UNDER THIS TPR / PROJECTDOX SUBMISSION.
   
07/02/15 
RELATED COMPANIES RELATED COMPANIES / DENNIS STUBBS; RELATED COMPANI RELATED COMPANIES; DENNIS STUBBS
P98189559 / SUPPLEMENTAL
82 I ST SE   
06/23/15 
CSX TRANSPORTATION INC / MILLER?LONG
TC1500024 / CONSTRUCTION
TOWER CRANE FOR JOBSITE USE
   
06/25/15 
CRANE SERVICE CO / CHRISTINE LONG
AH1500530 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 4:00AM THRU 9:00PM
125 L ST SE   
06/26/15 
CRANE SERVICE CO / CRANE SERVICE CO; CHRISTINE LONG
AH1500526 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 4AM SATURDAY THRU 9PM SUNDAY
55 M ST SE   
06/16/15 
HINES GLOBAL REIT 55 M STREET LLC / DENNIS R. WOODE
E1506693 / SUPPLEMENTAL
   
06/17/15 
HINES GLOBAL REIT 55 M STREET LLC /
P1506705 / SUPPLEMENTAL
80 M ST SE   
06/19/15 
WELLS REIT II 80 M STREET LLC /
P1506802 / SUPPLEMENTAL
50 M ST SE   
06/19/15 
WASHINGTON DC / FRANCISCO CRANERENTAL CO.
AH1500511 / CONSTRUCTION
AFTER HOURS PERMIT TO WORK SATURDAY 5AM TO 7PM SUNDAY INCONJUNCTION WITH D-DOT PERMIT # 10194482
   
07/02/15 
KCG 50 M LLC / JOE SAFFER
P1507193 / SUPPLEMENTAL
55 M ST SE   
06/16/15 
HINES GLOBAL REIT 55 M STREET LLC / DENNIS R. WOODE
E1506692 / SUPPLEMENTAL
   
06/17/15 
HINES GLOBAL REIT / JOHN KITTELBERGER; HINES GLOBAL REIT; JOHN KITTELBERGER
P65815829 / SUPPLEMENTAL
80 M ST SE   
06/16/15 
UNKNOWN UNKNOWN / PATRICK BARRON; UNKNOWN UNKNOWN; ROBIN MALLEY
E70224790 / SUPPLEMENTAL
400 M ST SE   
06/17/15 
EDGEWOOD MANAGEMENT CORP.
B1508977 / CONSTRUCTION
FIRE DAMAGE REPAIR TO ORIGINAL CONDITION .ALL INTERIOR WORK NO STRUCTURAL DAMAGE. REMOVE AND REPLACE AS NEEDED DRYWALL DISCONNECT RECONNECT PLUMBING FIXTURES . REWIRE AS NEEDED IF NEEDED FINISHES AND PAINT.
800 NEW JERSEY AVE SE   
06/18/15 
BAKER DC / CHRISTINE LONG
AH1500510 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM7:00PM THRU 7:00AM MONDAY THRU SUNDAY
1000 NEW JERSEY AVE SE   
06/25/15 
DANIEL WHITE
PC41402425 / POST CARD
INSTALLATION OF NOT MORE THAN 10 NEW OUTLETS AND NOT MORE THAN 10 NEW LIGHTING FIXTURES FOR A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
1100 NEW JERSEY AVE SE   
06/30/15 
DC WATER
AH1500545 / CONSTRUCTION
INSTALLING AND MAINTAINING FLOW METERS AT SPECIFIC MANHOLES ON THE STREET AT 1100 BLOCK OF NEW JERSY AVE SE AND ALONG BEACH DRIVE NW STREET FROM 7PM TO 7AM MONDAY TO FRIDAY FROM 07 / 06 / 15 TO 07 / 01 / 16
   
07/01/15 
SQUARE 742 LLC / ADVANTAGE ENGINEERS O/B/O SPRINT
AN1500181 / CONSTRUCTION
SPRINT PROPOSES TO REMOVE 2 ANTENNAS FROM THE NORTHERN FACE OF THE PENTHOUSE WALL AND INSTALL ONE ANTENNA TO THE SOUTHERN FACE OF THE PENTHOUSE WALL. THE CURRENT TOTAL IS 6 ANTENNAS. AFTER CONSTRUCTION THERE WILL BE 5 ANTENNAS. SPRINT WILL INSTALL 3 RRUS BEHIND THE EXISTING SCREEN WALL.
1111 NEW JERSEY AVE SE   
06/15/15 
MILLER?LONG
AH1500500 / CONSTRUCTION
AFTER HOURS TO POUR CONCRETE ON JOBSITE 6 / 16 / 2015 FROM 4AM TO 9PM
   
06/23/15 
MILLER?LONG
TC1500021 / CONSTRUCTION
TOWER CRANE FOR JOBSITE USE
1236 SOUTH CAPITOL ST SE   
06/16/15 
1244 SOUTH CAPITOL RESIDENTIAL LLC / WILLIAM G WATT
E1506682 / SUPPLEMENTAL
1244 SOUTH CAPITOL ST SE   
06/17/15 
1244 SOUTH CAPITOL RESIDENTIAL LLC C/O THE JBG COMPANIES / PITTINGER-DUNHA CAPITOL PERMITS
B1508279 / CONSTRUCTION
APPLICATION IN SUPPORT OF A TEMPORARY CERTIFICATE OF OCCUPANCY ALLOWING A POP-UP FOOD VENDOR TO SELL PREPARED FOODS INCLUDING BEER AND WINE ON A PRIVATE VACANT FORMER GAS STATION LOT ADJACENT TO THE NATIONAL'S STADIUM. CERTIFICATE WILL GAVE AN EXPIRATION DATE OF OCTOBER 5TH 2015. NO ALTERATION OR REPAIR WORK NEEDED FOR THIS USE OTHER THAN THE ERECTION OF 2 TEMPORARY 10'X10' TENTS.
   
06/19/15 
244 SOUTH CAPITOL RESIDENTIAL LLC C/O THE JBG COMPANIES / PITTINGER-DUNHA CAPITOL PERMITS
D1500624 / CONSTRUCTION
DEMOLITION OF A FREESTANDING CANOPY FROM VACANT LOT.
1500 SOUTH CAPITOL ST SE   
06/15/15 
WASHINGTON NATIONALS /
P1506602 / SUPPLEMENTAL
   
06/16/15 
NATIONALS PARK / RANDAL COX; NATIONALS PARK; RANDAL COX
E24923456 / SUPPLEMENTAL
   
06/17/15 
WASHINGTON NATIONALS / STEPHEN J. EXELBERT
P1506712 / SUPPLEMENTAL
   
06/17/15 
NATIONALS PARK / NATIONALS PARK; GEORGE DELGADO
F1500177 / CONSTRUCTION
REPLACEMENT OF 6 EXISTING FENCES AND GATES.
   
06/17/15 
NATIONALS PARK / GEORGE DELGADO
B1504325 / CONSTRUCTION
REMOVING EXISTING EXTERIOR CUSTOM ENTRY EXIT SWING GATES AND REPLACING THEM WITH PERIMETER SECURITY MAGNETOMETER IN CUSTOM ENTRY GATES SYSTEM.
   
06/19/15 
WASHINGTON NATIONALS / KRISTINA DELGADO
B1506810 / CONSTRUCTION
INSTALL A NEW PIZZA OVEN TO REPLACE EXISTING STONE COUNTER AND REFRESH ADJACENT FINISHES
   
06/23/15 
HEE YEOL HWANG
E1506849 / SUPPLEMENTAL
   
06/23/15 
WASHINGTON NATIONALS / WILLIAM P SAUREST
P1506904 / SUPPLEMENTAL
   
06/23/15 
LERNER / GEORGE DELGADO
B1509214 / CONSTRUCTION
FIRE ALARM WORK
   
06/23/15 
LERNER ENTERPRISES / NELSON TYLER SR; LERNER ENTERPRISES; NELSON TYLER
G94674970 / SUPPLEMENTAL
   
06/23/15 
LERNER ENTERPRISES / NELSON TYLER; LERNER ENTERPRISES; NELSON TYLER
P39325856 / SUPPLEMENTAL
   
06/27/15 
KRISTINA DELGADO / KRISTINA DELGADO; KRISTINA DELGADO; PHIL HAUHN
E79532492 / SUPPLEMENTAL
301 WATER ST SE   
06/18/15 
ATHUR LI / ALTAMERA GROUP / PETER NETTELBEC TEASS-WARREN ARCHITECTS
TL1500091 / CONSTRUCTION
NEW TENANT LAYOUT OF EXISTING CORE AND SHELL SPACE PERMITTED UNDER B1306803 / ZC #08-04A FOR A NEW RESTAURANT {PIZZA KIOSK} IN TENANT SPACE A WORK TO INCLUDE NEW MECHANICAL ELECTRICAL AND PLUMBING.
   
06/25/15 
FC LUMBER SHED LLC /
P1507016 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
M ST   04/10/15
$ 20,000,000
25 M STREET HOLDINGS LLC JOHN AKRIDGE COMPANIES
 


Project Directory




     © Copyright 2015 JD.