Since January, 2003
            
 (a random before-and-after moment)
May 1, 2008
May 24, 2015
2nd (West) at H, Looking South (see more)

I almost can't bring myself to write the words, but the owners of the Florida Rock site just south of Nationals Park have filed with the Zoning Commission for not only the previously reported plan to change the planned first phase office building to a residential one, but also to revisit parts of the site plan for the three subsequent phases. (For those of you versed in zoning speak, they are requesting to "revert Phases II, III, and IV to First Stage Approvals with modifications.")
This is going to be a lengthy process, with hearings at the Zoning Commission, reports from the Office of Planning and others, and presentations to the ANC (starting with one this coming Monday night, Dec. 12). So I'm going to avoid getting into the weeds too much too early, and will just give some bullet points of what changes they are looking for. (You're free to read these 57 pages of the filing for more detail.)
* The new Phase 1 building, at the far east end of the site (next to Diamond Teague Park) will now be the aforementioned residential building, a nine-story U-shaped design oriented toward the river with 300-350 units and 286 below-grade parking spaces. There will still be 12,500 square feet of retail, though they are asking that 7,000 of it be "flex space" that "may alternatively be dedicated to residential amenity space" until retail gets going. There will be a private courtyard within the "U", but there will also be the open space on the buildings' east side, now dubbed Anacostia Plaza, that will be open enough to maintain open views from First Street and the stadium's Grand Staircase to the river but will also provide "passive recreation space."
* The esplanade that has always been such a big part of the site plan remains, acting as the portion of the Anacostia Riverwalk Trail connecting South Capitol Street to Teague Park, the new pedestrian bridge, and the Yards Park. The Esplanade will "relate" to the "design vernacular" of the newly constructed boardwalks, and will also have a lot of stormwater management and bio-filtration offerings.
* On the building's west side will be the "Mews," which they call a pedestrian boulevard separating the Phase 1 building from the planned Phase 2 residential building. This path will also provide access to parking and loading for the first two phases, but "a dynamic paving design . . . will help distinguish this area as an urban space that privileges pedestrians over vehicles."
* The filing says they anticipate construction to begin in the second quarter of 2013, with first move-ins in early 2015 and the entire phase completed by summer 2015.
As for overall changes, here's what seem to be the most interesting changes from the previously approved design that the developers are looking for:
* The new plan would bring 1,164,640 square feet of gross floor area (4.6 FAR), up from 1,115,400 sq ft/4.4 FAR in the last plan. The other three phases' uses would remain unchanged (residential, office, hotel).
* Building heights of 130 feet for Phase 2-4 are being requested, compared to 130/112/130 last time around.
* Below-grade parking spaces would go from 1,010 to 1,144.
Plus, though It's hard to tell from one small site plan concept drawing, a lot of the public space design, especially to the east of the Phase 3 and 4 buildings, looks scaled back from the 2008 design. (UPDATE: Here's a graphic put together from another part of the filing that compares the 2008 site plan with the current one.)
The filing also says that "the Applicant would like the flexibility to provide interim uses on Phases, II, III, IV so that the site will not simply lay dormant pending construction," and lists a park, a farmers market, or other "simple, temporary retail uses" as examples.
And, just as in the previous plans, development of phases 3 and 4 are completely dependent on the construction of a new South Capitol Street Bridge, since the current bridge bisects the property where those buildings are planned.
Again, this is early in this new process, and there will be plenty of filings and presentations to come for all the additional detail you're going to be clamoring for. For now, the takeaway is that FRP/MRP want to get started on a residential building at 1st and Potomac in the spring of 2013, and still want to move forward on the rest of the site with a design similar to what was approved 3 1/2 years ago, but with some modifications.
This project first began its zoning quest in 1998, and went through a four-year process ending in 2008 to get its second-stage approvals. I should also note that Davis Buckley Architects, who worked on the project throughout that 10-year ordeal, is no longer part of the design team; SK&I is now on board, with Oculus as the landscape design firm. The site's owners, FRP Development/Florida Rock Properties, announced their partnership with MRP Realty earlier this year.
(As for the concrete plant currently on site, I haven't looked lately, but demolition is underway, and the filing says it should be done by the end of the year. Tom Boswell's heart will be broken.)
UPDATE, 1/3: Just before Christmas, demolition was finished on the plant, making it #166 in my Demolished Buildings Gallery.
Comments (3)
   
 
 More About Florida Rock
 All posts: Florida Rock, zoning

JDLand.com Home

Comments

lester says: (12/9/11 3:15 PM)
130 feet tall? That's curious.

The area is zoned W-2, which would traditionally allow for up to 60 feet. It's part of the capital gateway overlay, which is designed "to reduce the height and bulk of buildings along the Anacostia riverfront."

Then DC goes ahead and approved (previously) 130/112/130 foot tall buildings (Phase II, III, and IV, not sure what Phase I will be). Wow. The wonders of the PUD (which basically nullifies the W-2 and CG designation).

However, moving past these decisions, how on earth do they justify 130 feet with respect to the Heights of Building Act of 1910? To allow a 130 foot tall building, you would need to have either South Capitol or Potomac be 110' wide, and as best as I can estimate from the DC property records web site, they are at most 90' wide. What gives?

Either way, it seems silly to develop an overlay to reduce height and bulk near the Anacostia riverfront, and then approve four buildings on the waterfront 100+ feet high...

Mind you, from where I live, the buildings won't really impact my view at all, I just find it all very... strange.


JD says: (12/9/11 3:22 PM)
Phase I was originally approved at 92 feet; they're requesting 95 feet this time.

There's a fair amount of discussion of the zoning starting around page 11 in the document I link to above, which says that CG/W-2 (the Capitol Gateway overlay) allows for max heights of 130 ft in mixed-use developments. (Purely commercial buildings can only be 60 feet high; the CG overlay gives the opportunity for increased density by developing mixed-use.)

Here's the Capitol Gateway Overlay, if you want to read: link




IMGoph says: (12/17/11 12:17 AM)
I like the fact that the building footprints aren't curvy like the Watergate anymore. That footprint just felt contrived.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2016!
 Top News
  
Get JDLand Updates In Your Inbox!

JES on Yards Marina Grand: I wonder where the water taxi will go... direct service to either national harbo...
snakegriffin on The Latest Arrival: Heh, which means probably summer/fall of 2017. By the time these deliver, we'll ...
CJBabyDaddy on The Latest Arrival: The Parcel O project page has been there for months. PNH recently tweaked their ...
snakegriffin on The Latest Arrival: PN Hoffman has a project page up now for Parcel O, although there's no new infor...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/29/16
400 B/O I ST SE   ROBBERY  06/28/16
700 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/27/16
400 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/27/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 06/24/16
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/23/16
250 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/23/16
UNIT B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/23/16
1200 B/O 1ST ST SE   THEFT
Theft First Degree (theft From Building)
 06/23/16
800 B/O 3RD ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 06/22/16
900 B/O 5TH ST SE   ASSAULT WITH A DANGEROUS WEAPON  06/21/16
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 06/21/16
400 B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  06/19/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/19/16
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 06/17/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/17/16
700 B/O L ST SE   ROBBERY  06/17/16
1100 B/O 8TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/14/16
UNIT B/O I ST SE   ROBBERY  06/13/16
250 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/10/16
100 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/09/16
1200 B/O HALF ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 06/09/16
1000 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/06/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/05/16
100 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/04/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 06/04/16
150 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/16
300 I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/02/16

Recent Issued Building Permits Archive  
1200 1ST ST SE 20303   
06/24/16 
UNITED STATES OF AMERICA / CRANE SERVICE CO; CHRISTINE LONG
AH1600817 / CONSTRUCTION
An after hours permit is respectfully requested from 4AM Saturday thru 9PM Sunday
1277 1ST ST SE   
06/15/16 
MILLER&LONG MILLER&LONG
AH1600794 / CONSTRUCTION
afterhours to take down tower crane with 200 ton mobile crane saturday 6 / 18 / 2016 5am to 9pm 6 / 19 / 2016
1331 2ND ST SE   
06/23/16 
DC WATER
AH1600806 / CONSTRUCTION
After Hours work for structure excavation and support for B1605659 DC Water, Corman Construction 202-863-0052.
1212 4TH ST SE   
06/20/16 
FC 1212 LLC / null
P1607144 / SUPPLEMENTAL
1000 5TH ST SE   
06/22/16 
UNITED STATES OF AMERICA / null
P1607205 / SUPPLEMENTAL
1240 12TH ST SE   
06/13/16 
AECOM TECHNICAL SERVICE / AECOM TECHNICAL SERVICE; KTT PERMIT EXPEDITER, LLC
B1609254 / CONSTRUCTION
2nd extension of existing permit B1503361 to expire 01 / 14 / 2017
1000 HALF ST SE   
06/14/16 
TOLL BROTHERS CITY LIVING TOLL DC PHASE III / TOLL BROTHERS CITY LIVING TOLL DC PHASE III; STEVE ADAMCHAK ECS MID-ATLANTIC, LLC
SB1600266 / CONSTRUCTION
We will perform a total of 1 soil boring on the proposed site to a depth of 75 feet below existing grades. The boring will be located within the bounds of the private property. The boring will be drilled utilizing 4.25 hollow stem, continuous flight augers and / or mud rotary drilling. The boring will be performed utilizing a truck-mounted drill rig and will generate an approximate 6 inch annul...
1210 HALF ST SE   
06/14/16 
HINES GLOBAL / ALAN CARTER; HINES GLOBAL; ALAN CARTER
E82561999 / SUPPLEMENTAL
   
06/21/16 
HINES GLOBAL REIT 55 M STREET LLC / MATT LOSIGNOR
P1607182 / SUPPLEMENTAL
70 I ST SE APT 413   
06/17/16 
null / NA NA NA
EHOP1690749 / HOME OCCUPATION
70 I ST SE   
06/21/16 
70 EYE STREET ACQUISITION LLC / FUJITEC AMERICA
ER1602585 / SHOP DRAWING
Replace MRL hoist machine on elevator #2 Condition : Submit License Application EIN 22-2190685 Estimated Cost $15,000
601 L ST SE   
06/15/16 
RICHARD V CAREY
P1607063 / SUPPLEMENTAL
   
06/15/16 
TIMOTHY S CLEMONS
M1602419 / SUPPLEMENTAL
100 M ST SE   
06/11/16 
SQUARE 743 INC AND 100 M ST SE LLC / CHRIS HEARD; SQUARE 743 INC AND 100 M ST SE LLC; ASCHALEW ASAMINEW
E56805736 / SUPPLEMENTAL
   
06/20/16 
SQUARE 743 INC / GREGORY E LIGON
E1607378 / SUPPLEMENTAL
0 N ST SE   
06/24/16 
null / ROBERT S. WATTS
E1607561 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 3 20024   
06/15/16 
JBG/FEDERAL CENTER LLC / MARK A. PELUSO
E1607254 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 3RD 20024   
06/13/16 
JBG/FEDERAL CENTER LLC / null
P1606958 / SUPPLEMENTAL
1000 NEW JERSEY AVE SE   
06/15/16 
null / JEAN FRANCOIS MEFORT
PC56593839 / POST CARD
Installation of not more than 1 new air conditioning unit, up to a maximum of 10-tons of equivalent refrigerating effect.
   
06/28/16 
HEATHER DAVIS
PC18072130 / POST CARD
Interior demolition of non-bearing elements in a space up to 5,000 square feet (464.5 square meters)
   
06/28/16 
HEATHER DAVIS
PC44971937 / POST CARD
Replacement in kind of up to 800 square feet (74.3 square meters) of gypsum board. Replacement in kind, when applied to architectural features, means replacement with a feature of like material that replicates the existing feature in proportion, appearance, texture, design, detail and dimensions.
1100 NEW JERSEY AVE SE   
06/22/16 
SQUARE 742 LLC / SQUARE 742, LLC SPAULDING AND SLYE, STE 100; TEMPEST, LLC
B1609629 / CONSTRUCTION
Interior cosmetic remodel to include ADA upgrade modifications, minor electrical work per installations and relocations.
1111 NEW JERSEY AVE SE   
06/20/16 
NJA ASSOCIATES LLC / NJA ASSOCIATES LLC; N/A
SG1600285 / CONSTRUCTION
Install 2 signs on building LED----- 1. address 1111 on building entrance canopy 2. Letters IOM on New Jersey Ave building face side between 9th and 12th floors.
25 POTOMAC AVE SE   
06/20/16 
RIVERFRONT HOLDINGS I LLC / ; NONE
SG1600336 / CONSTRUCTION
INSTALL 6 SIGNS AS PER PRINT
1230 SOUTH CAPITOL ST SE   
06/27/16 
PUBLIC STORAGE INSTITUTE FUND / WASHINGTON SIGNS, LLC; WASHINGTON SIGNS, LLC; WASHINGTON SIGNS, LLC
SS1600068 / CONSTRUCTION
CHEVROLET
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2016 JD.