In a conference room at Nationals Park on Wednesday night, a bevy of representatives from CSX, DDOT, and FHWA along with consultants galore showed the public for the first time a series of 12 "project concepts" for how to handle CSX's desire/need to expand the capacity of the 3,800-foot-long Virginia Avenue Tunnel that runs from 2nd to 12th Street SE.
The concepts are now posted on the project web site, and can be grouped as seven "rebuild" options along with four other "reroute" options that would bring about the abandonment of the tunnel altogether (and, it must be said, are probably a just smidge less likely to be one of the alternatives chosen).
Three of the rebuild options are along the lines of what's been discussed for more than two years now, which would be the running of a temporary track in an open trench while the expansion work is done on the existing tunnel. While having the trench on the south side of the tracks (Concept 2) has been the "default" discussion and has to be assumed to be CSX's preferred choice, Concept 3 shows the possibility of running the trench on the north side of the tunnel, which would be right next to the Southeast Freeway (and which I'm imagining would run into some issues with having to make sure all freeway supports are adequately protected). Concept 4 runs a "serpentine" trench both north and south of the existing tracks.
Concept 5 is an intriguing new notion, where a second permanent tunnel would be built parallel and south of the existing one. There's also the idea of just widening the current tunnel either while trains continue to use the tunnel (Concept 6) or with freight traffic temporarily rerouted either to Union Station (Concept 7A) or outside the District entirely (with a route shown that would take trains from Richmond through Ohio and up to Buffalo before turning back to the East Coast).
The "reroute" options all propose abandoning the tunnel, either building a nine-mile-long freight tunnel from National Airport to the Deanwood Metro station about 80 feet underground (Concept 8) or building other alignments proposed in recent years by the National Capital Planning Commission (Concepts 9 and 10), or running on CSX's existing tracks out to Ohio and then northward.
But of course, these are concepts, and one of the reasons for going through a NEPA process is to study the different ideas to then come up with alternatives, accompanied by scads of data on noise, vibration, pollution, traffic, and timeline impacts. And to determine how much the various alternatives would cost--because it's likely that CSX is not going to be too gung-ho on the options anticipated to run into the billions of dollars.
It's expected that the public meeting where the alternatives will be unveiled will be in February of 2012, at which point so many of the questions that residents have been asking for so long about how the tunnel construction will affect the day-to-day lives of people who live near and use Virginia Avenue will get some concrete answers.
Faisal Hameed of DDOT, who ran much of the meeting, emphasized a number of times during the Q&A that this is a unique project: a private company is doing work they are paying for themselves on a right of way that they own some (but not all) of, but the impacts on vehicle/pedestrian/bicycle transportation are expected to be extensive enough that DDOT requested this environmental assessment before getting to the point of signing off on any permits that CSX will need to do the work. (There is also apparently still some negotiating going on between CSX and DDOT about exactly whose right of way is where, but it was said that no portion of the project will enter private land, though some small incursions will happen on the Marine bachelor enlisted quarters' site west of 7th Street.)
The Q&A was a pretty peaceful one as these things go (which makes a cranky blogger so very happy!). Most of the wrangling between audience members and CSX was over the route that hazardous materials take when they are forced to go around the District because of various city laws and federal regulations; the audience members were trying to get CSX to admit that there's an existing route bypassing the city that's shorter than anything shown in the concepts, while CSX wasn't going to get anywhere near telling people where hazardous materials travel.
In response to one audience question (coming as a result of the new FAQ posted on the project web site), CSX did say that they are going to "strongly pursue" getting a waiver to stop the currently required blowing of horns anytime a train enters the tunnel, and that they think it should be a "strong possibility" that it can happen, though of course they weren't wanting to commit.
There were also questions that will be better asked when the alternatives are unveiled, about construction staging, safety during construction, noise and vibration impacts, traffic flow, emergency planning, alley access, and what CSX will do to restore or even improve the Virginia Avenue streetscape when construction is finished. (As for any historic preservation impacts, a Section 106 review of the project is being done concurrently with this NEPA assessment.)
Comments are being accepted on these 12 concepts for the next 30 days, either by using the web site or e-mailing contact@virginiaavenuetunnel.com. (About 530 comments were received after the September scoping meeting.) It's hoped the environmental assessment will be completed with a final NEPA decision by the summer of 2012; though, if there is a finding that there will be a "significant environmental impact" from whichever construction alternative is chosen, then a full Environmental Impact Study (EIS) would then have to be done.
Comments (4)
   
 
 More About CSX/Virginia Ave. Tunnel

JDLand.com Home

Comments

Bruce says: (12/1/11 6:28 PM)
I'm glad they showed us some concepts..it will be a long process.


F says: (12/2/11 9:39 AM)
I wonder how many of those are "serious" concepts. It seems as though CSX is presenting some so-called alternate concepts to make it look like they're considering options when they've already decided on Concept 2 or something close to it.


MJM says: (12/3/11 3:43 PM)
If Concept 5 is a dig, build, cover, repeat as you go instead of one open long trench that may be the best option of them all. Can anyone confirm that is how Concept 5 would be constructed?


Douglas Willinger says: (12/4/11 3:30 AM)
Concept 5 also preserves a wider space making it easier to construct a below ground cut and cover tunnel for replacing the elevated SE Freeway- and would even be better if the new northern tunnel was shifted closer to the new southern tunnel.

link

link

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

bdj on Meet the New: Look's like a new sports bar with the exact same layout is going in at the old W...
WilyTibbs on Meet the New: Thanks for keeping the site going JD. It is an outstanding resource and always f...
CJBabyDaddy on Meet the New: JDeeeeeeeeeeeeeee! Yay! 2021’s starting to turn around!
202_cyclist on Meet the New: I meant Happy New Year!, not ?
202_cyclist on Meet the New: JD -and everyone else— Happy New Year? Wasn’t coronavirus supposed to miraculou...
MalS on Meet the New: Happy New Year and take care JD! Thanks for everything you are doing.
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   BURGLARY
Burglary Two
 11/26/20
UNIT B/O M ST SE   ROBBERY  11/25/20
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/24/20
UNIT B/O I ST SE   ROBBERY
Carjacking
 11/23/20
200 B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  11/22/20
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/22/20
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/22/20
1000 B/O 3RD ST SE   ROBBERY  11/21/20
1200 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/19/20
UNIT B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 11/18/20
1000 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/12/20
1100 B/O 2ND PLACE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 11/12/20
1000 B/O 8TH ST SE   THEFT
Theft First Degree (theft From Building)
 11/12/20
1000 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft Of Motor Vehicle Parts Or Accessories)
 11/10/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/05/20
300 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/05/20
900 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/20
UNIT B/O I ST SE   THEFT
Theft First Degree (shoplifting)
 10/31/20
900 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/29/20
300 B/O TINGEY ST SE   ROBBERY
Carjacking
 10/29/20
1300 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/28/20

Recent Issued Building Permits Archive  
1200 1ST ST SE   
11/04/20 
PEPCO / DONNA G GRAHAM
AH2100169 / CONSTRUCTION
WO #16029084 / 02 - 1200 1ST ST SE - PEPCO / WA CHESTER TO REMOVE AND INSTALL CABLES MONDAY THROUGH SATURDAYS FROM 9PM TO 6AM STARTING 11 / 5 / 20 TO 12 / 5 / 20
1018 3RD ST SE   
11/10/20 
DAVID A LEINER / null
E2101357 / SUPPLEMENTAL
1300 4TH ST SE 1001   
11/03/20 
YAAN REAL ESTATE LP / null
P2100950 / SUPPLEMENTAL
1300 4TH ST SE RU-1   
11/19/20 
AP BOWER RETAIL LLC / null
E2101650 / SUPPLEMENTAL
1057 5TH ST SE   
11/05/20 
PAM HARDER / null
E2101183 / SUPPLEMENTAL
82 I ST SE   
11/12/20 
STARRY / null
E2101432 / SUPPLEMENTAL
330 K ST SE   
11/09/20 
MINDY J SHAW / CASEY CHARKHABI; NA
B2008664 / CONSTRUCTION
Adding a bathroom on the first floor
   
11/10/20 
JINGSONG XIA / null
P2101107 / SUPPLEMENTAL
100 M ST SE   
11/12/20 
LHREV WASHINGTON M ST LLC / null
P2101170 / SUPPLEMENTAL
   
11/12/20 
SQUARE 743 INC / ;
P2101121 / SUPPLEMENTAL
139 N ST SE   
11/10/20 
BROOKFIELD DEVELOPMENT / JUSTIN BELLOW; BROOKFIELD DEVELOPMENT
B2004436 / CONSTRUCTION
NEW CONSTRUCTION 10-STORY PLUS PENTHOUSE APARTMENT BUILDING WITH 379 UNITS. PROPOSED GROSS FLOOR AREA: 225,000 SF. SH2000028 issued
1275 NEW JERSEY AVE SE   
11/04/20 
USA / null
E2101168 / SUPPLEMENTAL
   
11/09/20 
BROOKFIELD PROPERTIES / TIM GOOD
BP2100588 / POST CARD
71 POTOMAC AVE SE APT 1208   
11/02/20 
null / NA NA NA
EHOP20957167 / HOME OCCUPATION
71 POTOMAC AVE SE   
11/04/20 
RIVERFRONT HOLDINGS II, LLC / null
M2100380 / SUPPLEMENTAL
   
11/04/20 
RIVERFRONT HOLDINGS II, LLC / null
P2100978 / SUPPLEMENTAL
   
11/09/20 
MRP REALTY / null
E2101319 / SUPPLEMENTAL
227 TINGEY ST SE   
11/18/20 
FC 227 LLC / null
E2101630 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2021 JD.