Since January, 2003
            
 Sliding from Before to After

Today the council's Subcommittee on Redistricting is holding a hearing (watch live!) on the proposals for new ANC and single-member district boundaries. Late on Monday night, proposed maps for all eight wards were posted, with the Ward 6 maps being exactly the ones that the Ward 6 Task Force submitted back in September. However, a Twitter discussion with Tommy Wells's chief of staff has indicated that the task force maps are not what Tommy forwarded to the subcommittee, and Charles Allen was nice enough to pass along the ANC 6D portion of Tommy's map, seen below on the left, alongside the task force's recommended map (both can be clicked to enlarge):
(The colors don't match up, so beware.) The two biggest differences for Near Southeast are that 1) 6D02 stretches all the way down to Nationals Park as part of its cross-South Capitol boundary, and 2) a pretty obvious notch has been drawn that happens to allow current 6D07 commissioner David Garber to remain within the SMD covering the vast majority of Near Southeast. (The populations of the block where Garber lives and the Capitol Hill Tower block are nearly identical, so a New Jersey Avenue boundary would have been easy enough to use, except that then Garber would be in an SMD with another sitting commissioner--and also wouldn't get to rule over more than about 15 blocks of Near Southeast.)
We'll see what transpires at the hearing. Watch for updates here and on Twitter. And now the Ward 6 Task Force has posted all of Tommy's maps for 6D. (You can also read my many previous posts on the SMD redistricting process over the past few months.)
Comments (1)
   
 
 More About politics

JDLand.com Home

Comments

MJM says: (11/29/11 11:56 AM)
Thank you Tommy for the slight changes to Near-SE!!!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Jscott280 on Super Tuesday Tidbits: Construction fences up at 1299 first st, has anyone heard what might go here?
202_cyclist on Super Tuesday Tidbits: JD— your brother is doing good work. https://mobile.twitter.com/jamiedupree /st...
RMP on Super Tuesday Tidbits: The Willow space is cleared out :(
MarkinDC on Super Tuesday Tidbits: This article has some great info for helping out our neighborhood restaurants an...
CJBabyDaddy on Super Tuesday Tidbits: @RMP: I’m stacking up gift cards so I can celebrate by binging at a couple of m...
AGH on Super Tuesday Tidbits: Just got notice that the new retail on N street will be: Kilwins (Chocolate, Fud...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/23/20
1500 B/O SOUTH CAPITOL ST SE   THEFT
Shoplifting
 03/11/20
200 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/09/20
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/08/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 03/06/20
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/05/20
1200 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/01/20
1100 B/O 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/27/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 1001   
03/16/20 
LA FAMOSA LLC / null
P2004796 / SUPPLEMENTAL
   
03/20/20 
LA FAMOSA LLC / null
E2005975 / SUPPLEMENTAL
1300 4TH ST SE 1006   
03/16/20 
LA FAMOSA LLC / null
M2001859 / SUPPLEMENTAL
1300 4TH ST SE RU-1   
03/04/20 
AP BOWER RETAIL LLC / DAVID T FONTANA; BACON CONSTRUCTION COMPANY BACON CONSTRUCTION COM
TL2000065 / CONSTRUCTION
First time tenant layout on 1,196 SF of 1st floor retail shell for restaurant, Jeni Ice Cream, with 10 seats
   
03/06/20 
AP BOWER RETAIL LLC / null
E2005415 / SUPPLEMENTAL
   
03/11/20 
AP BOWER RETAIL LLC / DOMINIC E TOTARO; DOMINIC E TOTARO
M2001793 / SUPPLEMENTAL
1300 4TH ST SE   
03/13/20 
LA FAMOSA LLC / KIMOY LALLEMENT; POTOMAC CONSTRUCTION SERVICES
TL2000028 / CONSTRUCTION
New tenant layout for commercial kitchen, two restrooms, point of sale bar, and dining seating, new lighting and mechanical zones. 2,338 sf INDOOR OCCUPANCY: 84 PERSONS WITH 59 SEATS OUTDOOR OCCUPANCY: 38 PERSONS WITH 38 SEATS TOTAL MAX OCCUPANCY: 122
900 5TH ST SE   
03/03/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / CHRISTOPHER LAKATOSH; CHRISTOPHER LAKATOSH
E2005256 / SUPPLEMENTAL
   
03/24/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KAYLA TRICE; DELAWARE
EN2001608 / SHOP DRAWING
Install 3 new hydraulic passenger elevators
2 I ST SE   
03/09/20 
CRESCENT CAPITOL VIEW MF LLC / BOB BIROONAK; BOB BIROONAK; BOB BIROONAK
SG2000223 / CONSTRUCTION
one non illuminated sign
200 I ST SE   
03/17/20 
DISTRICT OF COLUMBIA / LEIA TERRELL
B2006382 / CONSTRUCTION
Tenant Alterations of existing office doors and wall. Including relocation of existing electrical, and mechanical terminals. NO CHANGE OF EGRESS, USE OF OCCUPANCY, NO EXTERIOR LAND DISTURBANCE, NO BASE BUILDING STRUCTURAL WORK.
139 N ST SE   
03/16/20 
PARCEL I FC ROWAN / MIGUEL RIOS; GRIFFIN DEWATERING, LLC
SB2000152 / CONSTRUCTION
Type of proposed System: Deep well dewatering system consisting of 16 wells around the perimeter of the shored excavation and 2 wells within the excavation in a mutually agreed layout. • Installation Method: Wells will be drilled up to 70’ deep, utilizing Griffin’s hollow stem auger drilling rig to drill up to a 10.25” I.D. borehole. Deep wells come complete with screen, casing, riser pipe and a s...
861 NEW JERSEY AVE SE   
03/03/20 
809-853 NEW JERSEY AVENUE ACQUISITION LLC / ERICKA CLARK
AH2000987 / CONSTRUCTION
Tower crane erection must be performed in 1 day due to weather constraints. All work performed onsite. Noise reduction procedure in place.
1275 NEW JERSEY AVE SE   
03/06/20 
MILLER AND LONG / WILLIAM MOORE
AH2001001 / CONSTRUCTION
After hours to pour concrete with pump truck saturday 3 / 7 and sunday 3 / 8 from 9PM-4AM.
1299 NEW JERSEY AVE SE   
03/13/20 
FOREST CITY SEFC LLC / SARAH J. NAPIER
BCIV2000067 / CONSTRUCTION
Revisions to BCIV1800153. This submission is for approval stamps only. No change in work.
71 POTOMAC AVE SE   
03/27/20 
MRP RESIDENTIAL / KAYLA SHATTUCK; KAYLA SHATTUCK; PARADIGM CONTRACTORS LLC
BCIV2000036 / CONSTRUCTION
This permit is for site civil work at 71 Potomac Avenue SE including stormwater management and erosion & sediment control. See plans for more details.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.