Since January, 2003

Ad by HillAds
 (a random before-and-after moment)
February 16, 2006
October 19, 2014 
1st at N, Looking North-Northwest (see more)

Just sent out by DDOT: "Today the District Department of Transportation (DDOT) announced the start of land acquisition and preliminary design work for the South Capitol Street Project, which includes replacement of the current Frederick Douglass Memorial Bridge. [...] While the Record of Decision (ROD) is still pending, the Federal Highway Administration signed the project's Final Environmental Impact Statement (FEIS) following the requisite 30-day public comment period that ended in May."
I'm posting quickly, so I shall now crib unabashedly from my post on the Final EIS, from back in April:
If you are interested in this subject, there is more verbiage and documentation accompanying the plans than you could ever dream of. (Traffic studies! Environmental consequences! Technical reports!) And I've written a lot about the process, which began more than a decade ago with other studies before the EIS got underway. And I'm sure there will be posts on other blogs delving more specifically into portions of the plans. But, since most people probably want to know "what does this mean for me?", you can see this graphic (from the 224-MB chapter 2 of the FEIS) giving a quick overview of what changes are planned along South Capitol Street if the final EIS is signed off on (and, more importantly, if funding is secured). The short version, for the west side of the Anacostia:
* Add "pedestrian amenities" and enhance the streetcape along South Capitol north of I and along New Jersey Avenue SE north of the freeway.
* Replace the existing ramp to the freeway from South Capitol and I with an at-grade intersection. (This would be a left turn onto a ramp to the freeway from under the freeway, near the current Nats HH economy parking lot.)
* Bring New Jersey Avenue SE back to a 160-foot full right-of-way, and add streetscape enhancements.
* "Reconstruct South Capitol Street as an urban boulevard." This means bringing M Street up to an "at-grade" intersection (no more tunnel), and would include new signalized at-grade intersections to allow traffic to cross South Capitol on K and L streets. (M Street would also get reconstructed between the Halfs [SE and SW].) The section of South Capitol north of M would have the same streetscape that the south portion received during its 2007/08 makeover, with wide sidewalks and a tree-lined median.
* Build a traffic oval at South Capitol, Potomac, Q, as the gateway to a new arched bascule-design Douglass Bridge that would have wide "multi-use trails" (i.e., sidewalks!) in both directions. The existing bridge would be demolished, after the new bridge is built somewhat downriver of the current location.
The Executive Summary (220 MB PDF) gives a good overview of the FEIS and preferred alternative (as it should!), but I also suggest wandering through the Chapter 2: Alternatives section, especially if you came to the neighborhood or JDLand after 2008 and didn't get to follow along during the EIS process, or if you're interested in the additional plans for east of the river, which I'm going to leave to others to discuss. My previous posts on all of this may be of interest as well. If you're wanting to see some of the earlier studies referenced in the FEIS, there are links to them at the top of my South Capitol Street project page.
How much would this all cost? The preferred alternative is priced in this final EIS at $806 million in FY 2014 dollars. (New bridges are expensive, you know.) Note that nothing in today's statement from DDOT says anything about funding, or a construction timeline.
You can also check my South Capitol Street and South Capitol Street Bridge page for all the info about the plans, along with my scores of posts over the past few years.
Comments (6)
 
 More About South Capitol St.

JDLand.com Home

Comments

Alan says: (9/29/11 9:35 AM)
Hey JD, what does 'Bring New Jersey Avenue SE back to a 160-foot full right-of-way,' mean?


JD says: (9/29/11 9:53 AM)
If you look on the graphic: link Basically it means widening New Jersey south of the freeway to K (where they can). There's that little service road on the east side that would go away. If you read deeper into the FEIS, it's about adding bike lanes and streetscape improvements (wider sidewalks) on New Jersey than more cars.


JD says: (9/29/11 10:54 AM)
And, since someone asked me privately, I'll also point out that the $806 million price tag is for the entire project. The new bridge itself is priced at $357 million, not all that different from the cost of the new 11th Street Bridges.


Alan says: (9/29/11 1:25 PM)
Thanks!


F says: (10/1/11 2:17 PM)
Considering the work on New Jersey Ave, the construction by W.C. Smith on the Trash Transfer site and the CSX railway project...are the horse stables still going to stay there. There must be some Cruelty to Animals ordinance thats being violated.


AVC says: (10/5/11 2:22 PM)
The woman who runs the horse carriage company and owns the horses has been given an eviction notice from the city as they own the property she has been leasing. Not sure where she will be able to go.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
JD on Meeting Materials from: There would still need to be a big new push to bring back funding for subsequent...
Packinblackandred on Meeting Materials from: I'm interested that the streetcar is still an option here--I thought that it was...
conngs0 on Meeting Materials from: Man, wouldn't it be great if they could incorporate the final stop of the street...
JD on Public Meeting Wednesday: Thanks, Josh, that makes sense. But I specifically asked DDOT about the early st...


Latest News
  
For past mile markers in the neighborhood's evolution,
see my Near Southeast DC Timeline.

 
Thousands and thousands of photos showing the neighborhood changing. More than 150 buildings no longer with us. All the news, since 2003. Photos from various archives showing the neighborhood in the more distant past. Maps from the early 1900s. Overhead Photo Comparisons: 1949, 1988, 2002-2008. All Blog Entries, 2003 - Present Major Events, 1799 - Present A series of blog entries looking at the neighborhood's history.
Near Southeast's Rearview Mirror


City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
200 B/O M ST SE   THEFT /  10/12/14
200 B/O I ST SE   THEFT /  10/08/14
70 B/O I ST SE   THEFT F/AUTO /  10/08/14
800 B/O L ST SE   BURGLARY /  10/07/14
9TH ST SE AND POTOMAC AVE SE   THEFT F/AUTO /  10/03/14
100 B/O K ST SE   THEFT F/AUTO /  10/03/14
VIRGINIA AVE SE AND 8TH ST SE   THEFT F/AUTO /  09/28/14
6D   THEFT F/AUTO /  09/27/14
1100 B/O NEW JERSEY AVE SE   THEFT /  09/26/14
300 B/O WATER ST SE   THEFT /  09/24/14
50 B/O M ST SE   THEFT /  09/24/14
6D   THEFT F/AUTO /  09/23/14
6D   THEFT F/AUTO /  09/23/14
1100 B/O NEW JERSEY AVE SE   THEFT /  09/23/14
1100 B/O NEW JERSEY AVE SE   THEFT /  09/23/14
700 B/O M ST SE   THEFT /  09/23/14
1200 B/O 12TH ST SE   THEFT F/AUTO /  09/23/14
1300 B/O M ST SE   THEFT /  09/22/14

Active Public Space Permits Archive  
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15
301 TINGEY ST SE    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1212 4TH ST SE   
10/10/14 
FORREST CITY
TL1500006 / CONSTRUCTION
CHANGE OWNER ADDRESS ON EXISTING BUILDING PERMIT TL1400136
1019 4TH ST SE   
10/14/14 
JOHN SHORT
F1500026 / CONSTRUCTION
WE WILL INSTALL AN ORNAMENTAL IRON FENCE IN THE FRONT YARD WITH A GATE. THE FENCE IS 3 FEET HIGH AND THE FENCE WILL BE BLACK IRON. FENCE IS ENTIRELY ON PUBLIC SPACE.
1212 4TH ST SE   
10/16/14 
FC 1212 LLC / PAUL R. JABLONSKI
E1500411 / SUPPLEMENTAL
   
10/16/14 
FC 1212 LLC / ARK SIGN SERVICES INC.; NONE
SG1500034 / CONSTRUCTION
INSTALL ONE WALL MOUNTED ILLUMINATED SIGN.
1103 9TH ST SE   
10/10/14 
ICP PARTNERS POTOMAC 810 LLC / HARRY RIDGEWAY
P1500293 / SUPPLEMENTAL
1220 12TH ST SE   
10/10/14 
WASHINGTON GAS LIGHT CO /
P1500284 / SUPPLEMENTAL
80 M ST SE   
10/10/14 
VEIC / GEORGE DELGADO
B1411521 / CONSTRUCTION
INTERIOR ALTERATION TO SUITE 310 AS REQUIRED FOR EXPANSION. WORK TO INCLUDE ELECTRICAL MECHANICAL AND PLUMBING
20 M ST SE   
10/17/14 
SOUTHEAST REALTY LLC / DAMON ELLIS; .
SG1400457 / CONSTRUCTION
INSTALLATION OF NEW NON ELECTRIC SIGN 10FT L 1FT 8IN H 3IN W
99 M ST SE   
10/07/14 
BALLPARK SQUARE 701 LLC / STEVEN ADAMCHAK ECS MID-ATLANTIC LLC
SB1400475 / CONSTRUCTION
TWO GEOTECHNICAL BORINGS TO A AN APPROXIMATE DEPTH OF 60 FT BELOW EXISTING SITE GRADES TO BE LOCATED WITHIN PRIVATE PROPERTY. TWO BORINGS WILL BE CONVERTED TO TEMPORARY MONITORING WELLS.
100 M ST SE   
10/10/14 
SQUARE 743 INC /
P1500281 / SUPPLEMENTAL
   
10/07/14 
SQUARE 743 INC / ANTHONY G SAMBURG
E1500145 / SUPPLEMENTAL
   
10/15/14 
NORTHWOOD INVESTERS LLC / STANLEY HUBBARD; NORTHWOOD INVESTERS LLC; STANLEY HUBBARD
E14516088 / SUPPLEMENTAL
   
10/17/14 
WASHINGTON D.C. / GARY MCVEY; WASHINGTON D.C.; GARY MCVEY
E50257566 / SUPPLEMENTAL
901 M ST SE   
10/16/14 
CARLTON RAY
AH1500035 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1201 M ST SE   
10/14/14 
COMCAST CABLE / MICHAEL SONESEN
AH1500018 / CONSTRUCTION
PLACING INNERDUCT IN EXISTING VERIZON MANHOLES. OCTOBER 9 2014 ? NOVEMBER 9. 2014. 7PM ? 2AM WEEKNIGHTS ? SATURDAYS
   
10/16/14 
CARLTON RAY
AH1500034 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1000 NEW JERSEY AVE SE   
10/14/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / RICHARD G. FINFROCK
P1500331 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
10/10/14 
DONOHOE DEVELOPMENT COMPANY / HERB LAWHORN
SB1400488 / CONSTRUCTION
A HOLLOW STEM AUGER WILL INSTALL 10 TEMPORARY DEWATERING WELLS BY ADVANCING A 12 INCH OUTER DIAMETER / 8 1 / 4 INCH INNER DIAMETER BORE HOLE TO A DEPTH OF 70 FEET BGS. AT DEPTH A 4 INCH PVC FLUSH JOINT THREADED WELL ASSEMBLY WILL BE SET AND SELECT FILTER PLACED. INTO EACH WELL WILL BE INSTALLED 2 HP TURBINE SUBMERSIBLE PUMPS. EFFLUENT WILL BE DIRECTED THROUGH A COMMON MANIFOLD TO A BAFFLED SETTLIN...
   
10/16/14 
GALLERY CAPITOL RIVERFRONT / THOMAS P MCGUIRE
E1500402 / SUPPLEMENTAL
25 POTOMAC AVE SE   
10/02/14 
MRP / ANDREW WILLINGH BOHLER ENGINEERING; DAN DUKE
BCIV1400038 / CONSTRUCTION
SITE GRADING STORM WATER IMPROVEMENTS BIORETENTION AREA INSTALLATION AND SITE UTILITIES
   
10/08/14 
MRP REALTY / JASON BENTLEY
SH1400037 / CONSTRUCTION
SHEETING AND SHORING FOR NEW BUILDING
300 TINGEY ST SE   
10/06/14 
FC BOILERMAKER LLC FC BOILERMAKER LLC / FC BOILERMAKER FC BOILERMAKER LLC
B1500169 / CONSTRUCTION
INSTALLATION OF KITCHEN FIRE SUPPRESSION SYSTEM
   
10/15/14 
FC BOILERMAKER LLC / BIRKHEAD ELECTRIC INC.; ERIN ANCHOR SIGN INC
SG1500023 / CONSTRUCTION
2-COMMERCIAL SIGN INSTALLATION
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
CUSHING PL   09/11/14
$ 9,000,000
HALF STREET RESIDENTIAL PJV LLC
 
HALF ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
N ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
CUSHING PL   09/11/14
$ 9,000,000
HALF STREET RESIDENTIAL PJV LLC
 
N ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
N ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
HALF ST   09/11/14
$ 12,500,000
MR BP RESIDENTIAL #1A LLC
 
N ST   09/11/14
$ 12,500,000
MR BP RESIDENTIAL #1A LLC
 
0025 POTOMAC AV   08/08/14
$ 78,486,500
RIVERFRONT HOLDINGS I LLC
 


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.