The task force put together by Tommy Wells to propose new boundaries for all of Ward 6's Advisory Neighborhood Commissions and their Single Member Districts will be coming to ANC 6D on Thursday night (July 28), for a "listening meeting" at 6:30 pm in the DCRA Hearing Room (E200) at 1100 4th St. SW.
Now posted on their blog is a series of questions that task force chair Joe Engler is asking to "account for the 'sense' of where residents associate their daily living." Among the questions:
* "Do the residents living around the baseball stadium believe their community "core" is located in: (a) Barracks Row, (b) Waterfront Mall, (c) both, and/or (d) neither?" (There is also a poll widget on the site where you can vote on this question.)
* "Is the freeway the proper east-west dividing line? For example, is there an opportunity to create SMD that use the Third, Fourth, Sixth and Eighth streets tunnels to "connect" the residents on both sides of the freeway?"
* "Should large residential buildings or complexes be dispersed among multiple SMDs?"
* "While needing to build SMDs with a population of 2,000 residents - are there any creative ways to account for the hidden census? Either those people that are now living in ANC 6D (around the baseball stadium for example) that were not there at the time of the census. Or those empty buildings or pending constructions that will drive a significant increase in density over the next few years?"
The last question is an interesting one, given that the census numbers come from April 1, 2010, and certainly another couple hundred residents have moved in since then. And with phase 2 of the Capitol Quarter townhouses moving along, the Yards' Foundry Lofts building about to start leasing, and likely construction of new residential buildings at 401 M, 880 New Jersey, Florida Rock, and along Half Street within the next five years, any SMDs drawn in Near Southeast based on 2010 numbers are going to balloon well past the target population size of between 1,900 and 2,100 residents. At the kick-off task force meeting a few weeks back, attendees were told that the 2,000-plus-or-minus-five-percent is not a legislated requirement, but is a goal, and that the task force can choose to have non-conforming SMD sizes if they feel it is necessary. But it was also clear that some of the task force members consider non-conforming SMDs a no-no, especially if they're used to take into account populations not reflected in the census numbers
As for the "core community" question, a new map suggested by ANC 6A02 commissioner Drew Ronneberg (but not endorsed by the task force) shows all of Near Southeast in a new ANC 6B, pairing the neighborhood with Barracks Row as its "core." Southwest would then be on its own in 6D, west of South Capitol Street.
You can use my interactive Ward 6 map to play with the numbers, especially if you want to see how keeping all of Near Southeast in 6D is a pretty tough nut to crack if the 1,900-2,100 population targets are inviolate. But then the question becomes whether the neighborhood gets split between 6D and 6B, or moved completely to 6B.
Somewhere far down the road, of course, Near Southeast when built out could be its own ANC, but in the meantime the realities of the numbers mean that it has to be grouped with either a large number of Southwest SMDs or a large number of southern Capitol Hill SMDs. Which one do you think makes more sense?
The meeting will run for 90 minutes, with time alloted for public input by ANC chairs/commissioners, community and neighborhood organizations, business and merchant associations, residents, and business owners; there will be a sign-in sheet for those wishing to speak. Written statements and comments will also be accepted at the meeting, or by e-mail for up to three days after the meeting (ward6rd@gmail.com).
The task force is scheduled to propose its first draft of new boundaries at a public meeting on Aug. 8, then forwarding the official draft to the ANCs on Aug. 18. The final draft would then go to Tommy Wells on Sept. 26.
Or, if you don't want anything to do with an ANC "listening meeting" Thursday evening, you can go on Tommy Wells's South Capitol Street Bike Ride, scheduled for exactly the same time as the redistricting session. Representatives from DDOT, the Washington Area Bicyclist Association, and Black Women Bike will be joining community members from Ward 6 and Ward 8 to discuss issues that affect pedestrians and cyclists on both sides of the river, focusing on improvements that can be had in the design of the future Douglass Bridge, which already calls for far wider sidewalks than the current bridge.
Either way, you'll probably still be able to make the showing of West Side Story at Tingey Plaza at 8:45 pm. Stay cool, boy!
Comments (0)
 
 More About ANC News

JDLand.com Home

Comments

No comments posted.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Tell readers about your apartment/house/item
for two weeks for $5.
Someone's looking for
what you're selling!
List it here.
Recent Comments:  
JD on Ho Hum, Another: There's still plenty of office developments on the boards, and at least one plan...
conngs0 on Ho Hum, Another: I suppose over-saturating the market is a concern, but it seems like the extra r...
JD on Next Virginia Avenue: I do know that many years ago, when 4th was switched to one-way southbound, that...
4thStNeighbor on Next Virginia Avenue: So I street will now have two-way traffic, 5th will go all the way through, and ...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
200 B/O VIRGINIA AVE SE   MOTOR VEHICLE THEFT /  07/10/14
900 B/O HALF ST SE   THEFT F/AUTO /  07/10/14
100 B/O M ST SE   THEFT /  07/09/14
4TH ST SE AND L ST SE   ROBBERY /  07/08/14
800 B/O POTOMAC AVE SE   THEFT /  07/07/14
300 B/O K ST SE   THEFT F/AUTO /  07/07/14
1100 B/O NEW JERSEY AVE SE   THEFT /  07/05/14
100 B/O L ST SE   THEFT F/AUTO /  07/04/14
1100 B/O 2ND PLACE SE   THEFT F/AUTO /  07/03/14
2ND PLACE SE AND I ST SE   THEFT F/AUTO /  07/02/14
70 B/O I ST SE   ROBBERY / GUN  07/02/14
200 B/O I ST SE   THEFT F/AUTO /  07/02/14
400 B/O M ST SE   MOTOR VEHICLE THEFT /  06/30/14
UNIT B/O M ST SE   THEFT F/AUTO /  06/30/14
70 B/O I ST SE   THEFT /  06/29/14
1100 B/O 1ST ST SE   THEFT F/AUTO /  06/28/14
900 B/O 4TH ST SE   THEFT /  06/28/14
70 B/O I ST SE   THEFT /  06/26/14
1000 B/O NEW JERSEY AVE SE   THEFT F/AUTO /  06/26/14
7TH ST SE AND L ST SE   ROBBERY /  06/25/14
3RD ST SE AND K ST SE   THEFT F/AUTO /  06/24/14
300 B/O I ST SE   MOTOR VEHICLE THEFT /  06/23/14
1100 B/O 8TH ST SE   ASSAULT W/DANGEROUS WEAPON /  06/22/14

Active Public Space Permits Archive  
1011 1ST ST SE    Pepco Holdings Inc 
Issued
excavation; new  
 06/26/14
to
08/26/14
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
804 3RD ST SE    Maximiliano Villagra 
Issued
streetfixture; new  
 08/05/14
to
08/06/14
904 3RD ST SE    Janel Fitzhugh 
Issued
streetfixture; new  
 07/01/14
to
08/14/14
908 3RD ST SE    Rachel Frankel 
Issued
streetfixture; new  
 07/24/14
to
09/21/14
1026 3RD ST SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/26/14
to
09/04/14
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15
913 5TH ST SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/26/14
to
08/28/14
1100 - 1199 BLOCK 1ST ST SE    tom cash 
Issued
excavation; new  
 06/27/14
to
08/25/14
410 M ST SE    Pepco Holdings Inc 
Issued
excavation; new  
 07/11/14
to
09/08/14
800 NEW JERSEY AVE SE    Pepco Holdings Inc 
Issued
excavation; new  
 06/20/14
to
08/22/14
880 NEW JERSEY AVE SE    WASHINGTON GAS 
Issued
excavation; new  
 05/27/14
to
07/27/14
    WASHINGTON GAS 
Issued
excavation; new  
 06/17/14
to
08/17/14
    WASHINGTON GAS 
Issued
excavation; new  
 07/28/14
to
09/26/14
1105 NEW JERSEY AVE SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/13/14
to
08/11/14
301 TINGEY ST SE    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1100 1ST ST SE   
07/15/14 
NA NA NA
EHOP1490710 / HOME OCCUPATION
1265 1ST ST SE   
07/03/14 
CAPITOL RIVERFRONT HOTEL LLC / DANIEL RUDE; CAPITOL RIVERFRONT HOTEL LLC; DANIEL RUDE
P71911683 / SUPPLEMENTAL
   
07/03/14 
CAPITOL RIVERFRONT HOTEL LLC / DANIEL RUDE; CAPITOL RIVERFRONT HOTEL LLC; DANIEL RUDE
G97426310 / SUPPLEMENTAL
   
07/03/14 
CAPITOL RIVERFRONT HOTEL LLC / DANIEL RUDE; CAPITOL RIVERFRONT HOTEL LLC; DANIEL RUDE
P13209615 / SUPPLEMENTAL
   
07/03/14 
CAPITOL RIVERFRONT HOTEL LLC / DANIEL RUDE; CAPITOL RIVERFRONT HOTEL LLC; DANIEL RUDE
P55243720 / SUPPLEMENTAL
1212 4TH ST SE   
07/11/14 
FC 1212 LLC /
P1406926 / SUPPLEMENTAL
   
07/14/14 
MIKE LENARD / BHAR; W. SAKIE BHAR
SG1400363 / CONSTRUCTION
INSTALL ONE SET OF BUILDING SIGN ON TO EXISTING BUILDING
1331 4TH ST SE   
07/09/14 
UNITED STATES OF AMERICA / RONALD C. CAYTON
E1406628 / SUPPLEMENTAL
1220 12TH ST SE   
07/16/14 
FAIRBANKS MORSE ENGINE / EVAN O'BRIEN/ D MCKEEVER SERVICES
B1409041 / CONSTRUCTION
INTERIOR ALTERATION TO EXISTING 2578 SF OFFICE SPACE. AFFECTED AREA LESS THAN 1000 SF TO CREATE DEMISING WALL AND MINOR ALTERATIONS TO PARTITION PLAN IN CONFERENCE AREA. MECHANICAL AND ELECTRICAL WORK INCLUDED.
326 L ST SE   
07/17/14 
NA NA NA
EHOP1490715 / HOME OCCUPATION
55 M ST SE   
07/16/14 
HINES GLOBAL REIT 55 M STREET LLC / TYRAN D. BRANNUM
E1407255 / SUPPLEMENTAL
20 M ST SE   
07/17/14 
SOUTHEAST REALTY LLC / JOHN GIUSEPPE-RAMCO
TL1400132 / CONSTRUCTION
FIRST TIME TENANT BUILDOUT FOR FAST FOOD ESTABLISHMENT - SUBWAY SANDWICH SHOP SEATING 41 AS SHOWN ON THE ATTACHED ARCH. MECH. PLUMB. ELECT AND FIRE PROTECTION DWGS. INTERIOR WORK ONLY.
55 M ST SE   
07/15/14 
HINES
B1409693 / CONSTRUCTION
INSTALL 6 AUTOMATIC DOOR OPERATORS LOCATED AT THE ELEVATOR LOBBIES BETWEEN THE 4TH-7TH FLOORS
901 M ST SE   
07/15/14 
CARLTON RAY
AH1400584 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1201 M ST SE   
07/15/14 
CARLTON RAY
AH1400585 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
800 NEW JERSEY AVE SE   
07/14/14 
NEW JERSEY AT H LLC / COLIN CLARK
B1409654 / CONSTRUCTION
REVISION TO PERMIT #SH1400039 FOR A OWNERSHIP CHANGE
1000 NEW JERSEY AVE SE   
07/11/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / RICHARD G. FINFROCK
P1406902 / SUPPLEMENTAL
   
07/11/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / BRANDON K VIERNES
M1402531 / SUPPLEMENTAL
1105 NEW JERSEY AVE SE   
07/07/14 
ST MATTHEWS BAPTIST CHURCH / ST MATHEWS CURCH
R1400051 / CONSTRUCTION
TWO STORY CHURCH
1111 NEW JERSEY AVE SE   
07/03/14 
NJA ASSOCIATES LLC / HERB LAWHORN
AH1400565 / CONSTRUCTION
INSTALL OVERHEAD PROTECTION ON M STREET SIDEWALK NORTH SIDE FOR METRO ENTRANCE ELEVATOR ENTRANCE BUS STOP AND PEDESTRIAN WALKWAY FROM NEW JERSEY AVE INTERSECTION WEST TO ALLEY APPROX. 100 LF
   
07/03/14 
NJA ASSOCIATES LLC / NJA ASSOCIATES LLC; COLIN CLARK
SH1300060 / CONSTRUCTION
EXCAVATION SHEETING AND SHORING OF THREE BELOW GRADE LEVELS FOR A FUTURE APARTMENT
1236 SOUTH CAPITOL ST SE   
07/11/14 
1244 SOUTH CAPITOL RESIDENTIAL LLC / GEOCAPITOL ENGINEERING LLC
SB1400340 / CONSTRUCTION
WE PROPOSE DRILLING THREE SIX-INCH DIAMETER GEOTECHNICAL TEST BORINGS USING THE HOLLOW STEM AUGER METHOD TO EVALUATE THE SUBSURFACE CONDITIONS. THE PROPOSED TEST BORING DEPTHS WILL BE 80 FEET BELOW THE EXISTING GROUND SURFACE. DRILLING EQUIPMENT WILL BE DECONTAMINATED BETWEEN EACH HOLE TO AVOID CROSS CONTAMINATION THROUGHOUT THE SITE. UPON COMPLETION THE GEOTECHNICAL TEST BORINGS WILL BE BACKFILLE...
1244 SOUTH CAPITOL ST SE   
07/11/14 
1244 SOUTH CAPITOL RESIDENTIAL LLC / GEOCAPITOL ENGINEERING LLC
SB1400341 / CONSTRUCTION
WE PROPOSE DRILLING TWO SIX-INCH DIAMETER GEOTECHNICAL TEST BORINGS USING THE HOLLOW STEM AUGER METHOD TO EVALUATE THE SUBSURFACE CONDITIONS. THE PROPOSED TEST BORING DEPTHS WILL BE 80 FEET BELOW THE EXISTING GROUND SURFACE. DRILLING EQUIPMENT WILL BE DECONTAMINATED BETWEEN EACH HOLE TO AVOID CROSS CONTAMINATION THROUGHOUT THE SITE. UPON COMPLETION THE GEOTECHNICAL TEST BORINGS WILL BE BACKFILLED ...
300 TINGEY ST SE   
07/02/14 
CM-YARDS LLC / DWIGHT SMITH
TL1400061 / CONSTRUCTION
TENANT BUILD OUT FOR NEW RESTAURANT IN YARDS. ALL INTERIOR ALTERATIONS AND INSTALLATION OF EQUIPMENT.
201 TINGEY ST SE   
07/11/14 
JBG COMPANIES / GEORGE DELGADO
B1409541 / CONSTRUCTION
ONE DAY SPECIAL EVENT FOR BMW SHOW--150 OCCUPANTS EXTERNAL GENERATOR RESTROOMS AND LIGHTING BAY DOORS TO REMAIN OPEN DURING FUNCTION
300 TINGEY ST SE   
07/08/14 
FVI 2020 / STEPHEN ADAMS; FVI 2020; STEPHEN ADAMS
E14277468 / SUPPLEMENTAL
   
07/10/14 
FORREST CITY AT THE YARDS / CRIS FLACK
TL1400123 / CONSTRUCTION
REVISION TO B1402734 FOR REVISIONS TO MECHANICAL AND ELECTRICAL SYSTEMS.
301 WATER ST SE   
07/03/14 
FOREST CITY COMMERCIAL GROUP / PAUL WARREN; FOREST CITY COMMERCIAL GROUP; PAUL WARREN
E63100944 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.