Since January, 2003
            
 Page Through from Before to After

Catching up after a quick trip to Florida:
* A few readers have mentioned some work underway around the Boilermaker Shops at The Yards, but I'll burst the bubbles and note that it's not a sign of formal construction getting started on the 46,000-square-foot retail space. Forest City is taking care of some remediation on behalf of GSA, involving the paint inside the building along with some potentially tainted soil around the outside.
On the same subject, there was a tidbit in the April Hill Rag on page 85 (hat tip reader J) in an article about Barracks Row restaurateur Xavier Cervera, who runs Lola's, Molly Malone's, the Chesapeake Room, and some other new ventures on the way: "And there's even more in his culinary sights: along the Southeast waterfront near Nationals Park, Cervera has leased half of the glass-and-steel Boilermaker building (1100 New Jersey Ave. SE) for a classy, 450 seat sports bar." (Ay-yi-yi on that really incorrect address!)
I asked Forest City about the report, and received this response: "Forest City Washington expects to announce soon a number of great restaurant and retail venues that will be located at The Yards. Upon completion of these leases we will commence redevelopment construction of the Boilermaker Building. At this point, we are not able to specifically respond to the inaccuracies in the Hill Rag piece. These inaccuracies will become evident when we make our official announcement." Hmmm.
In the meantime, you can see renderings and photos (outside *and* inside!) on my Boilermakers Shops page.
* After having a contract for more than three years, WMATA and Donohoe have finally completed the $3 million sale of 5,165 square feet of land at New Jersey and M where the east entrance of the Navy Yard Metro station sits. This allows Donohoe to build its planned 220,000-square-foot 1111 New Jersey office building, as soon as they find tenants. (The building won't sit directly on top of the entrance, as 55 M does with the west entrance of the station, but is pretty close, as you can see in the rendering on my project page.)
* And, in other land transactions in the 100 block of M, the longtime owners of the tiny 1,500-sq-ft sliver of land between 100 M and the alley have sold the property for Northwood Investors, the new owners of 100 M. (The property records say the price was $250,000, which, if accurate, would seem to a good deal less than what they might have been offered back when Opus East was acquiring the property to build 100 M.)
* On Tuesday, April 19 (tomorrow!), there's a Ward 6 Candidates Forum with the large field of candidates for the open at-large seat on the city council (you didn't know there's an election on April 26? You're not alone). It's in the North Hall at Eastern Market from 6:30 to 8 pm, and being hosted by the Ward 6 Democrats (but it's labeled a non-partisan event, so there will be no endorsement vote). You can submit a question for the candidates, whether you're attending or not.
* American River Taxi is getting some press as it gets its service underway between Georgetown, the Southwest Waterfront, and Diamond Teague Park across from the stadium (though Saturday's rains and the subsequent flooding along the Potomac have put a crimp in their schedule over the past few days). WTOP and the The Hoya have posted articles in the past few days.
Comments (5)
   
 
 More About 1111 New Jersey/Insignia on M

JDLand.com Home

Comments

Bruce says: (4/18/11 4:01 PM)
Love good restaurants!


Ryan says: (4/19/11 8:24 PM)
What is the fate of the church on NJ ave on the 1111NJ ave block? Is the office building cover this whole block? Thanks


JD says: (4/19/11 8:28 PM)
Church will stay, it's not part of the 1111 footprint.


IMGoph says: (5/9/11 10:24 AM)
So, what exactly was the point of purchasing that teeny-tiny sliver of land next to 100 M? I looked at it on Google Street View, and there can't possibly be anything done there other than change what's planted in the space, right?


JD says: (5/9/11 10:28 AM)
I guess you could look at it the other way, and ask what the purpose is at this point for the former landowners to hold onto it anymore. It does butt up against the 100 M building, so even if nothing can be built on it, it gives the 100 M folks all the land right up to the alley, rather than having to deal with someone else every time they need to do something right next to their own building.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Sasq on Checking in From: @Jaal @jscott280 Hey neighbor! Last I was told, the 2nd floor "should"...
NavyYardGuy on Inching from Quarantining: https://dc.eater.com/2020/5/29/21274400/bammys-caribbean-restaurant-opening-menu...
NavyYardGuy on Inching from Quarantining: I'll try too. Link to Bammy's menu.
dcgent on Inching from Quarantining: Secon try on Bammy link https://dc.eater.com/2020/5/2nk9/21274400/bammys-caribbe...
dcgent on Inching from Quarantining: Another look at Bammy
jaal on Checking in From: @Sasq & @ Jscott280 Fellow envy here! Any updates on closing?
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/24/20
1200 B/O VAN ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/23/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/20/20
1100 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/19/20
1100 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/19/20
1200 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/17/20
100 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/15/20
1200 B/O 4TH ST SE   ASSAULT WITH A DANGEROUS WEAPON  05/12/20
300 B/O WATER ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/07/20
100 B/O H ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/03/20
100 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/03/20
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/28/20
400 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 04/24/20

Recent Issued Building Permits Archive  
1300 4TH ST SE RU-1   
05/14/20 
AP BOWER RETAIL LLC / null
P2006042 / SUPPLEMENTAL
1300 4TH ST SE   
05/08/20 
null / ;
P2005886 / SUPPLEMENTAL
   
05/15/20 
null / ;
P2006066 / SUPPLEMENTAL
929 5TH ST SE   
05/18/20 
CHRISTOPHER D FRENCH / CHRIS FRENCH; HERCULES FENCE OF MARYLAND, LLC HERCULES FENCE OF
F2000461 / CONSTRUCTION
1. Removal and replacement of front metal fence and gate in kind.  2. Removal and partial relocation of existing 6' tall wood fence in rear patio. The fence is currently approx. 30" inside the rear property line, and we intend to move the fence to our rear property line. The work includes removal of existing wood gate that opens from neighbor's property to our property along shared property line ...
300 M ST SE 4TH FL   
05/05/20 
FEDERAL CENTER LP / ;
P2005798 / SUPPLEMENTAL
250 M ST SE   
04/29/20 
SQUARE 769 LLC / TAMIKA STATON; OTIS
EN2001825 / SHOP DRAWING
Install 3 New Elevators - 3500Lbs @ 350FPM - Elevators 1 - 2 and 4
   
04/29/20 
SQUARE 769 LLC / TAMIKA STATON; OTIS
EN2001826 / SHOP DRAWING
Install 1 New Elevator - 4000Lb @ 350FPM - Elevator 3
   
04/29/20 
SQUARE 769 LLC / BRIAN C STROTT; NA
TL2000026 / CONSTRUCTION
9 story 173,125 GSF tenant improvement fit out.
   
04/29/20 
SQUARE 769 LLC / TAMIKA STATON; OTIS
EN2001827 / SHOP DRAWING
Install 2 New Elevators - 3500LB @ 200FPM - Elevators 5-6
300 M ST SE   
04/30/20 
FEDERAL CENTER LP / SAM HOLLEN; TBD
B2006591 / CONSTRUCTION
INTERIOR RENOVATION TO 5TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP AND LIFE SAFETY. NO STRUCTURAL. 4499 SQUARE FEET. NTT DATA.
   
05/01/20 
FEDERAL CENTER LP / null
E2007254 / SUPPLEMENTAL
   
05/14/20 
AMENTUM / null
E2007609 / SUPPLEMENTAL
111 N ST SE   
05/07/20 
BROOKFIELD PROPERTIES / MAHMOUD KHACHAN; NA
SB2000288 / CONSTRUCTION
Drill temporary eight soil borings to a depth of 80 each at the existing parking lot at 111 N Street SE, Washington DC. The diameter of the borings is 6 inches. The borings will be grouted upon completion in accordance with DCRA requirements as indicated in the work plan.
1111 NEW JERSEY AVE SE   
05/12/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E2007563 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
05/06/20 
UNITED STATES OF AMERICA / JUSTIN BELLOW; NA
B1913803 / CONSTRUCTION
PARCEL G PROJECT CONSISTS OF A NEW 12 STORY OFFICE BUILDING WITH STREET LEVEL RETAIL AND 2 LEVELS OF BELOW GRADE PARKING. 2 LEVEL PARKING APPROVED UNDER FOUNDATION TO GRADE FD1900047 & SHEETING AND SHORING SH1900050
   
05/19/20 
UNITED STATES OF AMERICA / null
M2002480 / SUPPLEMENTAL
   
05/19/20 
UNITED STATES OF AMERICA / null
P2006118 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.