Since January, 2003
            
 Sliding from Before to After

Saturday was a lovely day for taking a couple of walks with camera in hand, and with work underway at locations that couldn't be any closer to my out-of-neighborhood house, I had no excuse to not get some updated photos of 225 Virginia/200 I, Capitol Quarter Phase 2, Canal Park, and the Little Red Building. (It was also nice chatting with the folks who correctly guessed that the oddball standing in the middle of the street taking photos must have been me.)
The showy demolition work is now well underway at 225 Virginia/200 I, and if the few shots and renderings on the project page aren't enough for you, you can do a virtual walk around the block to see which walls and windows are blown out at this point and to compare the current images with their "befores."
No time is being wasted at Capitol Quarter, where framing has now wrapped around from I to 3rd to K Street on the first block of Phase 2. You can take a "walk" around that block, too, if you haven't lately, or wander through the project page, both of which have plenty of images of the old Capper public housing buildings that were on this block for a very long time. I also added to the database some photos of what will eventually be the intersection of 3rd Place and L, once the new street gets built through its second block south of K. If you're big on old Capper photos, there's a few "before" images of L Street buildings in that sent that haven't been displayed on the site before now.
If photographs of fences are your thing, take a "walk" around the Canal Park perimeter, to see many pictures of the "traffic control" now in place in advance of the start of construction on the park (presuming it ever actually comes). Those barriers are going to put a crimp in some of my standard shooting locations for the next year or so, including where I've stood for the past eight years to take photographs of the Little Red Building, which in its new incarnation is now more of a brick red than the beet red it used to be. ANC commissioner Garber posted on Friday that the roof is going in over the next few days, at which point work on the interior can begin, as it slowly progresses toward becoming "Lot 38 Espresso."
Remember that the Click to see all available photos of this location.icon on any page gets you to the full batch of photos I've taken at any location (which, since I'm getting into the eighth year of doing this, can be kind of voluminous in some spots).
(I know that It seems kind of odd to still be posting photos when so many readers now live in the neighborhood, which of course wasn't always the case. But it's my schtick, and so I continue onward! Plus. there are plenty of people interested in Near Southeast who don't wander around every day--or maybe some of the residents don't know what these spots used to look like before....)
Comments (6)
   
 
 More About 225 Virginia/Old Post Plant/200 I

JDLand.com Home

Comments

Gary Karr says: (3/20/11 11:59 AM)
Or readers who are thinking about moving into the neighborhood...:-)


G says: (3/21/11 4:36 PM)
Must have been fun taking out those windows / walls on old Washington Star plant!


southwillriseagain says: (3/22/11 1:15 PM)
I am thinking that Canal Park might have its Federal funding taken away.

It has been 4 years since Eleanor Norton and surrounding developers got federal funding for Canal Park. They had a design..."ready to go." They had to redesign it to bring it to their budget 3 years ago. I am disappointed there is still no site activity although groundbreaking was 6 months ago. I want to see Canal Park built but I fear that with Republicans looking for every dollar to cut out of the budget, Federal funding will be lost (if it has not been lost already)...Can't we get moving with this project? What in the world can be holding it up for so long?

Could you give a history of Canal Park on your website?
(Thank God for the Yards Park!!!!)


JD says: (3/22/11 1:25 PM)
First off, I'm pretty sure there's no federal funding for Canal Park, or if there is, it's a very small portion of the total. There's city funding, money from the USDOT payment-in-lieu-of-taxes (PILOT) fund, some bond monies for infrastructure work, and some private funds.

I don't think they would have put up the barricades to close streets if they weren't very close to starting construction.

Could I give a history of Canal Park? link link

Start reading. :) You can start at the end and work forward if you want, to help correct your timeline a bit.




Ben in SE says: (3/22/11 1:47 PM)
And I am pretty sure they were tearing up the M Street block yesterday, so construction has already started.


MJM says: (4/5/11 10:17 PM)
Did Canal Park lose their funding again? Doesn't appear to have been any progress over the last week or so. They tore up some of the black-top and the little bob-cats have since disappeared unless they are on the same schedule as the LRB II.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts

JD on June Construction Update: A tunnel was actually discussed back when I first started doing it. Prohibitivel...
NavyYardRes on June Construction Update: From the Bridge article - "Traffic ovals will be created at each end and se...
jdc on June Construction Update: Sigh. If only, as shown in that photo, that segment of Half Street would be clos...
202_cyclist on June Construction Update: JD-- thank you for posting the article. I'm impressed by the engineering requir...
JD on June Construction Update: And since I skipped writing about the new Douglass Bridge, here's a good piece a...
malatesta on June Construction Update: That's, uh, not a very good article. It's correct in that I know there's plenty ...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O VIRGINIA AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/18/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/16/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/11/18
1100 B/O 8TH ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/10/18
UNIT B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/09/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/06/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/29/18
1000 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/28/18
1100 B/O 10TH ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/26/18
1100 B/O 9TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/25/18
UNIT B/O I ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/25/18

Recent Issued Building Permits Archive  
1100 2ND PL SE   
06/19/18 
CAPPER CARROLLSBURG VENTURE LLC / null
E1807795 / SUPPLEMENTAL
1018 3RD ST SE   
06/06/18 
DAVID A LEINER / SCOTT STERL
F1800474 / CONSTRUCTION
REPLACEMENT OF AN EXISTING CHAIN LINK FENCE TO A WOODEN FENCE 6FT. TALL.
1212 4TH ST SE   
06/06/18 
null / THAIS NA PEACHER
EHOP18924304 / HOME OCCUPATION
100 H ST SE   
06/19/18 
DISTRICT OF COLUMBIA / RUSSELL COX
FD1800083 / CONSTRUCTION
Construction of foundation only
101 H ST SE   
06/05/18 
SQUARE 737 LLC / JOHN SONNER 4438727277
E1807389 / SUPPLEMENTAL
   
06/06/18 
SQUARE 737 LLC / null
P1806501 / SUPPLEMENTAL
2 I ST SE   
05/31/18 
CRESCENT CAPITOL VIEW / null
E1807278 / SUPPLEMENTAL
4 I ST SE   
06/18/18 
CRESCENT COMMUNITIES / KIM MITCHELL
B1804349 / CONSTRUCTION
VELOCITY - 4 I ST SE- IS THE PHASE II OF A MIXED-USE RESIDENTIAL PROJECT LOCATED AT 2 I ST SE. IT SITS AT TE CORNER OF I ST & SOUTH CAPITOL ST SE. PHASE II CONSIST OF 184 RESIDENTIAL UNITS AND ROUGHLY 3,800 SF OF RETAIL ON 1ST FLOOR FACING I STREET. TWO LEVELS OF UNDERGROUND PARKING GARAGE SERVES BOTH PHASES OF THE PROJECT. BUILDING HEIGHT IS 130 FEET. INCLUDING 3 ELEVATORS.
202 M ST SE   
05/29/18 
null
E1807211 / SUPPLEMENTAL
   
05/29/18 
null
P1806323 / SUPPLEMENTAL
100 M ST SE   
06/05/18 
SQUARE 743 INC / ROBERT L HUNTER 703-404-0303
M1802631 / SUPPLEMENTAL
202 M ST SE   
05/31/18 
UNITED STATES OF AMERICA / null
P1806387 / SUPPLEMENTAL
   
06/22/18 
UNITED STATES OF AMERICA / DAVID BERUBE
TN1800146 / CONSTRUCTION
40'x60' and 16'x16' tent for a private event not open to public. Event to take place during daylight hours between 1130 and 1630.
300 M ST SE   
06/01/18 
FEDERAL CENTER LP / SAM HOLLEN
B1809520 / CONSTRUCTION
INTERIOR RENOVATION TO 8TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING OR STRUCTURAL. 860 SQUARE FEET. STRATEGIC INSIGHT
410 M ST SE   
05/30/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / SCOTT NICHOLS
AN1800023 / CONSTRUCTION
AT&T proposes to add three new antennas to an existing rooftop telecommunications facility.
1115 NEW JERSEY AVE SE   
06/07/18 
DONOHOE REAS ESTATE SERVICES / null
E1807467 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE 20003   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807687 / SUPPLEMENTAL
   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807698 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE 20001   
06/21/18 
GALLERY CAPITOL RIVERFRON PROPERTY / null
P1806901 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
06/12/18 
GALLERY CAPITOL WATERFRONT PROPERTY LLC / null
P1806653 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
06/12/18 
SQUARE 742 LLC / CLIFFORD DIXON
B1807730 / CONSTRUCTION
REVISION: REVISE B1804348 5TH FLOOR OFFICE SPACE TO EXTEND THE OFFICE INTO ADDITIONAL SPACE TO CREATE A LARGER OPEN OFFICE
1200 NEW JERSEY AVE SE 20590   
06/20/18 
JBG/FEDERAL CENTER LLC / ALFRED F JORDAN 202-437-5067
E1807865 / SUPPLEMENTAL
71 POTOMAC AVE SE   
05/30/18 
FORIDA ROCK PROPERTIES INC / ANKIT K SINGH
UT1800044 / CONSTRUCTION
Removal of an Underground storage Tank (UST) 7 feet in diameter and approximately 16 feet long (approximately 6,000 gallons). Suspected Fuel Tank. Tank is filled with water and soil. Tank will be cleaned, removed and disposed off as per the appropriate standards and requirements.
221 TINGEY ST SE   
06/05/18 
GONE YARD HOTEL OWNER LLC / MITCH PERMUY 7272100491
E1807017 / SUPPLEMENTAL
227 TINGEY ST SE   
05/31/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806388 / SUPPLEMENTAL
(2) Backwater valve
   
06/07/18 
UNITED STATES OF AMERICA / MICHAEL ERIC CAMPBELL 571-229-1360
M1802664 / SUPPLEMENTAL
Equipment Manufacturer Equipment Model AAON DOAS, RTU and AHU DAIKIN VRF and split systems DESERT AIRE LC06R7NFDDMLAERD
   
06/07/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806553 / SUPPLEMENTAL
REVISION TO P1806388. IN LIEU OF 753 SINKS SHOULD READ 264 SINKS, 489 BASINS
   
06/18/18 
UNITED STATES OF AMERICA / MITCH PERMUY 7272100492
E1807256 / SUPPLEMENTAL
300 TINGEY ST SE   
06/04/18 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS 443-532-0991
M1802615 / SUPPLEMENTAL
   
06/04/18 
FC BOILERMAKER LLC / null
P1806437 / SUPPLEMENTAL
   
06/05/18 
FC BOILERMAKER LLC / CARLOS E. MONTES
P1806464 / SUPPLEMENTAL
355 WATER ST SE   
06/14/18 
UNITED STATES OF AMERICA / EDUARDO LOPEZ 2023884000
E1807680 / SUPPLEMENTAL
355 WATER ST ST SE   
06/13/18 
UNITED STATES OF AMERICA / KIMBERLY SPEED
TN1800127 / CONSTRUCTION
The Great Lawn at Yards Park will be the site of the California State Society Annual Summer Picnic. The contract specifies the licensee to obtain permits for tents and generators on the lawn. The large tent is 100 x 40 - which I have the Certificate of Flame Resistance), as well as a generator. I have the generator specifications from the distributor.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.