Since January, 2003
            
 (a random before-and-after moment)
March 3, 2011
May 29, 2016
8th at Virginia, Looking West-Northwest (see more)

(There were a number of Near Southeast-related items on Monday night's ANC 6D agenda, so I'm going to break up the reports into a couple of posts. One or two more to come over the next day or so.)
Representatives of the Capitol Hill Day School came to 6D to ask for the commission's support on a zoning case that would allow the school to erect "modular classrooms" on the empty community center lot at 5th and K while their current location at 2nd and South Carolina undergoes renovation. As I wrote last week, the school would occupy the lot starting in June, with the intent of returning to the Dent School building in January 2012. There were a few additional details given last night:
* CHDS has secured 29 spaces in the big parking lot at 7th and L for faculty.
* They will be requesting from DDOT that six of the street parking spaces (half the block) on the east side of 5th in front of the lot be changed to No Parking from 8 am to 6 pm weekdays, to act as a drop-off zone for parents and buses. They will ask parents coming from north of the freeway to drive south on 4th, turn left on L, and then turn left on 5th to pull into one of their four drop-off spots, where kids are guided quickly out of the cars. (You can see this in operation at 2nd and South Carolina.) Their school buses would also operate in those spots during the day. But the spaces would be available for resident parking after 6 pm, before 8 am, and on weekends, with a "minimal" number of nighttime events beyond a Back to School night.
* Headmaster Jason Gray said that the school wants to be "as minimally disruptive as we can, be good community members, and leave the site better than we left it." They'll be landscaping the site (and fencing it), and will clear the lot and clean it up once they move out.
* In return for using this DC Housing Authority lot, CHDS has agreed to fund three scholarships for public housing children to attend the school, though details on how the students will be picked are still being worked out.
The commission voted 6-1 to support the zoning request, with only Commissioner Roger Moffatt voting against. The BZA will hear the case on May 17. If you want to know more about the CHDS renovation project, you can check out their wiki, and they are also keeping a blog on the construction project.
There was also a general update on the progress of the overall Capper redevelopment given by David Cortiella of DCHA. Some bullet points:
* Construction on the second phase of Capitol Quarter is actually a bit ahead of schedule; Cortiella said the first move-ins are scheduled for July/August, but I've heard from EYA that it may be more like May/June.
* DCHA is in the process of building a new lot for DPW so that it can move out of the New Jersey & K site; Cortiella expects this to happen by August, at which time site remediation and demolition can begin, working toward the building of I Street through to New Jersey Avenue (along with all manner of infrastructure work). This would take about 18 months.
* The financing for the mixed-income apartment project on Square 882 (just south of the Marine barracks) has apparently proven difficult to secure, and is still being worked on, with Cortiella saying he "expects" it by the end of the year.
* The community center's financing is dependent on whether a second bond can be floated to get the rest of the $55 million PILOT monies; the $29 million bond sold in 2010 is paying for infrastructure work around Canal Park and the DPW site, and by spring of next year it should be known whether this second bond will be happening.
* The entire project is still on track to eventually provide the 707 units of public housing that were on the site before redevelopment; about 337 have already been delivered.
(Plus, it wasn't mentioned at the meeting, but there's a lottery of up to 11 Capitol Quarter workforce housing units coming March 26.)
Comments (15)
   
 
 More About ANC News

JDLand.com Home

Comments

MJM says: (3/15/11 11:17 AM)
So what was Roger Moffatt's reason for not approving the temp school site?


JD says: (3/15/11 11:28 AM)
To be honest, I don't know--I didn't catch any quick reason he might have given, which granted might be because of my hearing issues, but he made no strong statement. It might have been because he pretty much votes against anything having to do with Capper, I think going back to his disapproval of the PUD years ago. But maybe he or David can chime in with reasons, since this is just pure speculation on my part.





David Garber says: (3/15/11 11:46 AM)
He didn't vote to approve it because there was a Capitol Quarter resident there who was expressing concerns about the site. He knew it would pass anyway so his nay vote was just a gesture toward the resident.


MJM says: (3/15/11 12:50 PM)
Thanks - headshake about concerns :)

BTW - do we get hear about the Safeway letter? :)


JD says: (3/15/11 12:52 PM)
Outside of my jurisdiction!


MJM says: (3/15/11 1:01 PM)
Boo :(


JD says: (3/15/11 1:04 PM)
I'm sure SWill will cover it at the Southwest blog.


Bruce says: (3/15/11 1:09 PM)
Concerns were just over child safety and speed limits as cars tend to fly down those streets along with the removal of some resident parking. Wasn't against it at all. Nothing out of the ordinary!


MJM says: (3/15/11 2:26 PM)
Valid concerns but for him to vote no - weird. Cars fly down L St and the stop signs are just yield signs if that - even w/o the temp school. (Which btw - I don't think I've ever seen a MPD car on my run home down L in the prime time for speeders).


Bruce says: (3/15/11 3:12 PM)
M, I am not sure why either. Car Do fly down these streets. I received a nice email from the head of CHDS and he is looking into addressing these concerns. Nice guy.
Thanks for all of your great comments on this and other topics!


Mark says: (3/16/11 10:50 AM)
Agree - L street is a real danger to the kids in our neighborhood, including mine. The commuters rush in and rush out - I've even watched cars completely ignore the stop signs and run the street at over 50 mph. It really is only a matter of time until a kid gets hurt.

I do have concerns about the drop off plan. I would recommend that the school instead tell the parents to take 4th to M street and then turn onto 5th from M.


Bruce says: (3/16/11 11:47 AM)
Drop off concerns were addressed as well. If I recall, it was recommended that folks come down M and turn up 5th for this purpose. Thanks Mark...


JD says: (3/16/11 11:51 AM)
No, they said parents will be recommended to turn on L and then up 5th.


MJM says: (3/16/11 12:18 PM)
@DG - what would it take to get MPD patrols along L St between 7th and 3rd streets (during rush hour) and also north of M before/after baseball games? Its almost that time of year where people use 1st St to get to/from games and ignore the stop signs at I, K, and L just to try and get through the 1st/M St light. Even peds in the intersection doesn't really result in cars stopping.


Bruce says: (3/16/11 2:04 PM)
Ahh yes, that's right. I couldn't remember if it was L or M. Good point about MPD although stop signs in the area are inconsistent. Some blocks have 4 way, some only 2. it can be confusing. The use of traffic control personnel (crossing Guards) was also brought up at the beginning/end of the school day.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News

malatesta on Barre3 Studio Coming: DC made the finalist list for Amazon HQ2: https://www.amazon.com/gp/browse.html/...
smitty2k1 on Barre3 Studio Coming: Cornercopia is open every weekday for breakfast and lunch. They close fairly ear...
202_cyclist on Barre3 Studio Coming: I noticed another construction trailer this morning on the empty lot immediately...
jdc on Barre3 Studio Coming: I love Harry's, but competition is always good. That said, I wonder if this plac...
Message Board (beta)

  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O K ST SE   BURGLARY
Burglary Two
 01/13/18
1000 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/11/18
500 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 01/09/18
900 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/07/18
100 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/04/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/04/18
400 B/O M ST SE   THEFT
Shoplifting
 01/02/18
UNIT B/O K ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/31/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/19/17

Recent Issued Building Permits Archive  
1100 2ND PL SE   
12/21/17 
CAPPER CARROLLSBURG VENTURE LLC / null
P1802299 / SUPPLEMENTAL
1331 2ND ST SE   
12/22/17 
DC WATER / DAVE LEVINE
AH1800369 / CONSTRUCTION
After Hours work for structure excavation and support for B1311474 DC Water, Corman Construction 301-343-5417. TO EXCLUDE LEGAL HOLIDAYS.
1331 4TH ST SE CU   
12/27/17 
FC 1331 LLC / GARY BRENT; N/A
SG1800119 / CONSTRUCTION
Install 1 illuminated blade sign and 7 non-illuminated window vinyl signs - CHLOE BY HAIDAR KAROUM
   
12/28/17 
FC 1331 LLC / BEN BEDDO
TL1700205 / CONSTRUCTION
New Tenant Layout for restaurant
1300 4TH ST SE   
01/05/18 
FORREST CITY WASHINGTON / GEORGE ARTHUR KING
SB1800091 / CONSTRUCTION
To abandon 18 6 inch diameter 80 foot deep dewatering wells and 4 2 inch diameter 50 feet deep observation wells per the DOEE regulations
1346 4TH ST SE   
01/12/18 
ALAN OWINGS / ROBERT HENRY
AH1800415 / CONSTRUCTION
After Hours Permit for 1 / 15 / 18 from 7AM to 7PM to perform concrete operations, framing, operations, and utility operations.
2 I ST SE   
12/20/17 
CRESCENT CAPITAL VIEW, LLC N/A / ERICKA CLARK
AH1800359 / CONSTRUCTION
Place and finish concrete. Minimal noise impact, and required for reduction on impact to traffic.
411 I ST SE   
12/27/17 
ABIGAIL A SMITH / ROBERT D. JOHNSTON
E1802679 / SUPPLEMENTAL
337 L ST SE   
12/22/17 
JENNIFER LANCASTER / null
E1802602 / SUPPLEMENTAL
   
01/11/18 
JENNIFER LANCASTER / BJORN FALK
SOL1800005 / CONSTRUCTION
Installation of a 3.6kW solar PV system. Roof Mounted, 10 panels
300 M ST SE STE# 400   
01/03/18 
FEDERAL CENTER LP / SAM HOLLEN
B1803531 / CONSTRUCTION
INTERIOR RENOVATION TO 4TH FLOOR OFFICE CONFERENCE ROOM. PARTITIONS, CEILING, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING OR STRUCTURAL. 680 SQUARE FEET. CACI SUITE 400
25 POTOMAC AVE SE DOCK 79   
01/11/18 
RIVERFRONT HOLDINGS I LLC / null
P1802701 / SUPPLEMENTAL
227 TINGEY ST SE   
12/29/17 
JW CAPITAL PARTNERS / MELISSA DIAZ
FD1700126 / CONSTRUCTION
Parcel L1- Foundation to Grade permit for the new construction on an 11 story full service hotel building with restaurant and retail.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.