Since January, 2003
            
 (a random before-and-after moment)
February 11, 2007
October 22, 2017
South Capitol at L, Looking East-Northeast (see more)

(There were a number of Near Southeast-related items on Monday night's ANC 6D agenda, so I'm going to break up the reports into a couple of posts. One or two more to come over the next day or so.)
Representatives of the Capitol Hill Day School came to 6D to ask for the commission's support on a zoning case that would allow the school to erect "modular classrooms" on the empty community center lot at 5th and K while their current location at 2nd and South Carolina undergoes renovation. As I wrote last week, the school would occupy the lot starting in June, with the intent of returning to the Dent School building in January 2012. There were a few additional details given last night:
* CHDS has secured 29 spaces in the big parking lot at 7th and L for faculty.
* They will be requesting from DDOT that six of the street parking spaces (half the block) on the east side of 5th in front of the lot be changed to No Parking from 8 am to 6 pm weekdays, to act as a drop-off zone for parents and buses. They will ask parents coming from north of the freeway to drive south on 4th, turn left on L, and then turn left on 5th to pull into one of their four drop-off spots, where kids are guided quickly out of the cars. (You can see this in operation at 2nd and South Carolina.) Their school buses would also operate in those spots during the day. But the spaces would be available for resident parking after 6 pm, before 8 am, and on weekends, with a "minimal" number of nighttime events beyond a Back to School night.
* Headmaster Jason Gray said that the school wants to be "as minimally disruptive as we can, be good community members, and leave the site better than we left it." They'll be landscaping the site (and fencing it), and will clear the lot and clean it up once they move out.
* In return for using this DC Housing Authority lot, CHDS has agreed to fund three scholarships for public housing children to attend the school, though details on how the students will be picked are still being worked out.
The commission voted 6-1 to support the zoning request, with only Commissioner Roger Moffatt voting against. The BZA will hear the case on May 17. If you want to know more about the CHDS renovation project, you can check out their wiki, and they are also keeping a blog on the construction project.
There was also a general update on the progress of the overall Capper redevelopment given by David Cortiella of DCHA. Some bullet points:
* Construction on the second phase of Capitol Quarter is actually a bit ahead of schedule; Cortiella said the first move-ins are scheduled for July/August, but I've heard from EYA that it may be more like May/June.
* DCHA is in the process of building a new lot for DPW so that it can move out of the New Jersey & K site; Cortiella expects this to happen by August, at which time site remediation and demolition can begin, working toward the building of I Street through to New Jersey Avenue (along with all manner of infrastructure work). This would take about 18 months.
* The financing for the mixed-income apartment project on Square 882 (just south of the Marine barracks) has apparently proven difficult to secure, and is still being worked on, with Cortiella saying he "expects" it by the end of the year.
* The community center's financing is dependent on whether a second bond can be floated to get the rest of the $55 million PILOT monies; the $29 million bond sold in 2010 is paying for infrastructure work around Canal Park and the DPW site, and by spring of next year it should be known whether this second bond will be happening.
* The entire project is still on track to eventually provide the 707 units of public housing that were on the site before redevelopment; about 337 have already been delivered.
(Plus, it wasn't mentioned at the meeting, but there's a lottery of up to 11 Capitol Quarter workforce housing units coming March 26.)
Comments (15)
   
 
 More About ANC News

JDLand.com Home

Comments

MJM says: (3/15/11 11:17 AM)
So what was Roger Moffatt's reason for not approving the temp school site?


JD says: (3/15/11 11:28 AM)
To be honest, I don't know--I didn't catch any quick reason he might have given, which granted might be because of my hearing issues, but he made no strong statement. It might have been because he pretty much votes against anything having to do with Capper, I think going back to his disapproval of the PUD years ago. But maybe he or David can chime in with reasons, since this is just pure speculation on my part.





David Garber says: (3/15/11 11:46 AM)
He didn't vote to approve it because there was a Capitol Quarter resident there who was expressing concerns about the site. He knew it would pass anyway so his nay vote was just a gesture toward the resident.


MJM says: (3/15/11 12:50 PM)
Thanks - headshake about concerns :)

BTW - do we get hear about the Safeway letter? :)


JD says: (3/15/11 12:52 PM)
Outside of my jurisdiction!


MJM says: (3/15/11 1:01 PM)
Boo :(


JD says: (3/15/11 1:04 PM)
I'm sure SWill will cover it at the Southwest blog.


Bruce says: (3/15/11 1:09 PM)
Concerns were just over child safety and speed limits as cars tend to fly down those streets along with the removal of some resident parking. Wasn't against it at all. Nothing out of the ordinary!


MJM says: (3/15/11 2:26 PM)
Valid concerns but for him to vote no - weird. Cars fly down L St and the stop signs are just yield signs if that - even w/o the temp school. (Which btw - I don't think I've ever seen a MPD car on my run home down L in the prime time for speeders).


Bruce says: (3/15/11 3:12 PM)
M, I am not sure why either. Car Do fly down these streets. I received a nice email from the head of CHDS and he is looking into addressing these concerns. Nice guy.
Thanks for all of your great comments on this and other topics!


Mark says: (3/16/11 10:50 AM)
Agree - L street is a real danger to the kids in our neighborhood, including mine. The commuters rush in and rush out - I've even watched cars completely ignore the stop signs and run the street at over 50 mph. It really is only a matter of time until a kid gets hurt.

I do have concerns about the drop off plan. I would recommend that the school instead tell the parents to take 4th to M street and then turn onto 5th from M.


Bruce says: (3/16/11 11:47 AM)
Drop off concerns were addressed as well. If I recall, it was recommended that folks come down M and turn up 5th for this purpose. Thanks Mark...


JD says: (3/16/11 11:51 AM)
No, they said parents will be recommended to turn on L and then up 5th.


MJM says: (3/16/11 12:18 PM)
@DG - what would it take to get MPD patrols along L St between 7th and 3rd streets (during rush hour) and also north of M before/after baseball games? Its almost that time of year where people use 1st St to get to/from games and ignore the stop signs at I, K, and L just to try and get through the 1st/M St light. Even peds in the intersection doesn't really result in cars stopping.


Bruce says: (3/16/11 2:04 PM)
Ahh yes, that's right. I couldn't remember if it was L or M. Good point about MPD although stop signs in the area are inconsistent. Some blocks have 4 way, some only 2. it can be confusing. The use of traffic control personnel (crossing Guards) was also brought up at the beginning/end of the school day.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts
  

NavyYardNittany on June Construction Update: All in on the #stoptheyellowbrick campaign. Don’t know why but it screams 1988 t...
GarfieldPark on New SE-SW Circulator: In Eastern Market news, that Sephora has an opening date of 7/13/18. My wife pla...
RMP on New SE-SW Circulator: Those of us over on the east-side of the neighborhood can walk over to 8th St to...
JD on New SE-SW Circulator: Or change Circulators at Eastern Market. There's still one that goes to Union St...
202_cyclist on New SE-SW Circulator: Also, with the new dog park across the street from Whole Foods (opening fall 202...
202_cyclist on New SE-SW Circulator: JD— you’re going to make my wife’s blood boil with this post. We’re going to ha...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O VIRGINIA AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/18/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/16/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/11/18
1100 B/O 8TH ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/10/18
UNIT B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/09/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/06/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/29/18
1000 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/28/18
1100 B/O 10TH ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/26/18
1100 B/O 9TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/25/18
UNIT B/O I ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/25/18

Recent Issued Building Permits Archive  
1100 2ND PL SE   
06/19/18 
CAPPER CARROLLSBURG VENTURE LLC / null
E1807795 / SUPPLEMENTAL
1018 3RD ST SE   
06/06/18 
DAVID A LEINER / SCOTT STERL
F1800474 / CONSTRUCTION
REPLACEMENT OF AN EXISTING CHAIN LINK FENCE TO A WOODEN FENCE 6FT. TALL.
1212 4TH ST SE   
06/06/18 
null / THAIS NA PEACHER
EHOP18924304 / HOME OCCUPATION
100 H ST SE   
06/19/18 
DISTRICT OF COLUMBIA / RUSSELL COX
FD1800083 / CONSTRUCTION
Construction of foundation only
101 H ST SE   
06/05/18 
SQUARE 737 LLC / JOHN SONNER 4438727277
E1807389 / SUPPLEMENTAL
   
06/06/18 
SQUARE 737 LLC / null
P1806501 / SUPPLEMENTAL
2 I ST SE   
05/31/18 
CRESCENT CAPITOL VIEW / null
E1807278 / SUPPLEMENTAL
4 I ST SE   
06/18/18 
CRESCENT COMMUNITIES / KIM MITCHELL
B1804349 / CONSTRUCTION
VELOCITY - 4 I ST SE- IS THE PHASE II OF A MIXED-USE RESIDENTIAL PROJECT LOCATED AT 2 I ST SE. IT SITS AT TE CORNER OF I ST & SOUTH CAPITOL ST SE. PHASE II CONSIST OF 184 RESIDENTIAL UNITS AND ROUGHLY 3,800 SF OF RETAIL ON 1ST FLOOR FACING I STREET. TWO LEVELS OF UNDERGROUND PARKING GARAGE SERVES BOTH PHASES OF THE PROJECT. BUILDING HEIGHT IS 130 FEET. INCLUDING 3 ELEVATORS.
202 M ST SE   
05/29/18 
null
E1807211 / SUPPLEMENTAL
   
05/29/18 
null
P1806323 / SUPPLEMENTAL
100 M ST SE   
06/05/18 
SQUARE 743 INC / ROBERT L HUNTER 703-404-0303
M1802631 / SUPPLEMENTAL
202 M ST SE   
05/31/18 
UNITED STATES OF AMERICA / null
P1806387 / SUPPLEMENTAL
   
06/22/18 
UNITED STATES OF AMERICA / DAVID BERUBE
TN1800146 / CONSTRUCTION
40'x60' and 16'x16' tent for a private event not open to public. Event to take place during daylight hours between 1130 and 1630.
300 M ST SE   
06/01/18 
FEDERAL CENTER LP / SAM HOLLEN
B1809520 / CONSTRUCTION
INTERIOR RENOVATION TO 8TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING OR STRUCTURAL. 860 SQUARE FEET. STRATEGIC INSIGHT
410 M ST SE   
05/30/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / SCOTT NICHOLS
AN1800023 / CONSTRUCTION
AT&T proposes to add three new antennas to an existing rooftop telecommunications facility.
1115 NEW JERSEY AVE SE   
06/07/18 
DONOHOE REAS ESTATE SERVICES / null
E1807467 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE 20003   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807687 / SUPPLEMENTAL
   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807698 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE 20001   
06/21/18 
GALLERY CAPITOL RIVERFRON PROPERTY / null
P1806901 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
06/12/18 
GALLERY CAPITOL WATERFRONT PROPERTY LLC / null
P1806653 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
06/12/18 
SQUARE 742 LLC / CLIFFORD DIXON
B1807730 / CONSTRUCTION
REVISION: REVISE B1804348 5TH FLOOR OFFICE SPACE TO EXTEND THE OFFICE INTO ADDITIONAL SPACE TO CREATE A LARGER OPEN OFFICE
1200 NEW JERSEY AVE SE 20590   
06/20/18 
JBG/FEDERAL CENTER LLC / ALFRED F JORDAN 202-437-5067
E1807865 / SUPPLEMENTAL
71 POTOMAC AVE SE   
05/30/18 
FORIDA ROCK PROPERTIES INC / ANKIT K SINGH
UT1800044 / CONSTRUCTION
Removal of an Underground storage Tank (UST) 7 feet in diameter and approximately 16 feet long (approximately 6,000 gallons). Suspected Fuel Tank. Tank is filled with water and soil. Tank will be cleaned, removed and disposed off as per the appropriate standards and requirements.
221 TINGEY ST SE   
06/05/18 
GONE YARD HOTEL OWNER LLC / MITCH PERMUY 7272100491
E1807017 / SUPPLEMENTAL
227 TINGEY ST SE   
05/31/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806388 / SUPPLEMENTAL
(2) Backwater valve
   
06/07/18 
UNITED STATES OF AMERICA / MICHAEL ERIC CAMPBELL 571-229-1360
M1802664 / SUPPLEMENTAL
Equipment Manufacturer Equipment Model AAON DOAS, RTU and AHU DAIKIN VRF and split systems DESERT AIRE LC06R7NFDDMLAERD
   
06/07/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806553 / SUPPLEMENTAL
REVISION TO P1806388. IN LIEU OF 753 SINKS SHOULD READ 264 SINKS, 489 BASINS
   
06/18/18 
UNITED STATES OF AMERICA / MITCH PERMUY 7272100492
E1807256 / SUPPLEMENTAL
300 TINGEY ST SE   
06/04/18 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS 443-532-0991
M1802615 / SUPPLEMENTAL
   
06/04/18 
FC BOILERMAKER LLC / null
P1806437 / SUPPLEMENTAL
   
06/05/18 
FC BOILERMAKER LLC / CARLOS E. MONTES
P1806464 / SUPPLEMENTAL
355 WATER ST SE   
06/14/18 
UNITED STATES OF AMERICA / EDUARDO LOPEZ 2023884000
E1807680 / SUPPLEMENTAL
355 WATER ST ST SE   
06/13/18 
UNITED STATES OF AMERICA / KIMBERLY SPEED
TN1800127 / CONSTRUCTION
The Great Lawn at Yards Park will be the site of the California State Society Annual Summer Picnic. The contract specifies the licensee to obtain permits for tents and generators on the lawn. The large tent is 100 x 40 - which I have the Certificate of Flame Resistance), as well as a generator. I have the generator specifications from the distributor.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.