Since January, 2003

Ad by Google
 (a random before-and-after moment)
July 29, 2004
May 18, 2014
2nd (West) at M, Looking North (see more)

The Bullpen, the outdoor bar and festivities spot that has operated just across the street from Nationals Park during stadium events since 2009, is making plans to open a "Beer Garden" at the northern end of their current block, at Half and M streets, SE, facing the western entrance to the Navy Yard Metro station. (See my high-quality graphic at right.) With 79 picnic tables holding eight people each, it would have a seating capacity of 632 people, and would offer draft German beers (and perhaps other European beers) along with German sausages, kielbasa, and other light (ahem) fare.
"Das Bullpen" [copyright JD] is being envisioned as having a very different atmosphere from the current Bullpen, with the beer garden not having game areas with lots of kids running around. There would be no amplified music, and it would operate during the same hours as Bullpen 1.0 (which will be remaining open this year as well). It would have its own entrance, right across from the Metro station's entrance, and would be fenced in and partially covered/tented in the same way as the existing Bullpen.
At an ANC 6D ABC subcommittee meeting tonight, a Bullpen rep explained that Akridge, the owners of the entire block bounded by M, N, Half, and Van, has informed the Bullpen owners of plans to begin construction perhaps as early as October of this year on the southern end of the block, where Bullpen 1.0 is located. (There seems to have been some sort of "hint" that if the Bullpen wants to have a shot at a permanent home in the new ground-floor retail spaces that will be available when the block is completed, they need to expand to this additional area this year.) If Akridge's plans are unchanged from what went through the zoning process a few years ago, the southern end of the block would be a 300-unit residential building with ground-floor retail. You can see renderings on my Akridge Half Street page.
As you can see on my cruddy map, there will still be substantial parking available between the two locations. (For old-timers, this new site is where WMATA's old Southeastern Bus Garage entrance was located.)
The Bullpen's lawyers are trying to determine whether this constitutes an expansion of the current operation, to allow Das Bullpen to open under their existing liquor license, or whether a new license (and then a new voluntary agreement with the ANC) will be needed. More to come, I'm sure.
UPDATE: And it should be noted that this is a completely separate venture from the Bavarian Beer Garden plans at 8th and L, SE. Beer gardens to the left! Beer gardens to the right!
UPDATE II: To clear up any confusion, they are intending to have Das Bullpen open this spring, with Bullpen 1.0 open as well through the end of the 2011 baseball season.
UPDATE III: Another clarification: The new site has no official name yet. "Das Bullpen" is purely my invention, because I wanted something catchy to describe it.
Comments (0)
 
 More About Akridge/Half St.

JDLand.com Home

Comments

E. Carlin says: (2/2/11 10:25 PM)
I understand the German theme has the backing of the team's Internet fan club, the Nats E-Party.


Jay Roberts says: (2/3/11 9:21 AM)
From buses to buzzes, he, he...


Alan says: (2/3/11 1:32 PM)
Slightly confused; is the goal to open this secondary watering hole by opening day this year and have two places for the 2011 season and then just the Beer Garden for 2012 and beyond or will it be just the bullpen this year and then just the beer garden next year?


JD says: (2/3/11 1:34 PM)
The goal is to have both for this year and just the beer garden next year.


Tom says: (2/3/11 5:07 PM)
I'm slightly disappointed that the folks who operate the Bullpen and Das Bullpen don't seem to have any desire in opening a permanent facility in the neighborhood.

To me, they want our money, but only during baseball games. What about when the team is in Chicago and I still want a beer on a Saturday afternoon?

There's plenty of ground floor retail that would be perfect for a restaurant (even one above the Metro!).

Very disappointed.


JD says: (2/3/11 6:00 PM)
"Tom", I think in this case what they're doing is trying to (p)reserve a permanent spot in Akridge's Half Street project, which will be a prime place to be when it is ever finished. The Bullpen rep basically said last night that they were told that if they didn't add Das Bullpen this year, they would lose the chance at one of the permanent retail spaces when that side of Half Street is built out.

I'm guessing there will be at least one new sit-down restaurant option announced in the area before 2011 is out.


Tom says: (2/4/11 9:22 AM)
While I understand that, even if ground were broken tomorrow, it would still be at least two years before the structure is complete. The key words are "when it is ever finished".

Obviously they see a need for increased space during the baseball season, it's just a shame that they don't see the need for ANY space during the rest of the year, as it stands right now.


rj says: (2/6/11 2:37 PM)
Maybe the bullpen guys are opening up das bullpen to make money. its called business.

I want more permanent businesses in the neighborhood too, but to be disappointed by an entrepreneur who sees an opportunity to make a profit is pretty childish.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
JD on The Big Stick: Mr. JDLand and I did go--I had the polish sausage and he had the half smoke, and...
JES on The Big Stick: JD, I saw some menu pics on twitter. Did you go? How was it?
Westnorth on Navy Yard Circulator: People generally don't ride bus routes from one end to the other end. In the cas...
E. Masquinongy on Southeast Blvd.: All three plans show the rehabilitation of Barney Circle, reconnecting it to L S...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
200 B/O I ST SE   THEFT F/AUTO
 12/18/14
700 B/O L ST SE   THEFT
2nd Degree
 12/17/14
1200 B/O 1ST ST SE   THEFT
Theft F/Building
 12/08/14
1200 B/O 1ST ST SE   THEFT
 11/21/14
900 B/O 5TH ST SE   BURGLARY
 11/21/14
200 B/O I ST SE   THEFT
 11/21/14
1200 B/O NEW JERSEY AVE SE   THEFT
 11/20/14

Active Public Space Permits Archive  
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15

Recent Issued Building Permits Archive  
1025 1ST ST SE   
12/03/14 
NA NA NA
EHOP1590134 / HOME OCCUPATION
   
12/10/14 
KAREN NZAKIMUENA
PC74349112 / POST CARD
INSTALLATION OF NOT MORE THAN 1 NEW AIR CONDITIONING UNIT UP TO A MAXIMUM OF 10-TONS OF EQUIVALENT REFRIGERATING EFFECT.
1016 3RD ST SE   
12/15/14 
ANAMARIA R MOTTOLA / DIXON
B1502438 / CONSTRUCTION
RENOVATIONS MINOR MEP
1212 4TH ST SE   
12/10/14 
FC 1212 LLC / SCHINDLER ELEVATOR CORP
ER1500593 / SHOP DRAWING
REPLACE MAXTON UC2A VALVE EST. COST OF WORK $ 2 2120. 00
927 5TH ST SE   
12/15/14 
AARON LORENZO
PC25919394 / POST CARD
REPLACEMENT IN KIND OF EXISTING FENCE ON PRIVATE PROPERTY. REPLACEMENT IN KIND WHEN APPLIED TO ARCHITECTURAL FEATURES MEANS REPLACEMENT WITH A FEATURE OF LIKE MATERIAL THAT REPLICATES THE EXISTING FEATURE IN PROPORTION APPEARANCE TEXTURE DESIGN DETAIL AND DIMENSIONS.
1000 5TH ST SE   
12/04/14 
UNITED STATES OF AMERICA / WALTER T JONES
E1501598 / SUPPLEMENTAL
1015 HALF ST SE   
12/10/14 
HALF STREET LLC / ART DISPLAY; BOB BIROONAK ART DISPLAY CO.
SG1400465 / CONSTRUCTION
ONE ILLUMINATED NEWS TICKER SIGN
1201 HALF ST SE   
12/10/14 
WEST HALF 1 LLC / MARK W GIBSON
E1501746 / SUPPLEMENTAL
   
12/12/14 
JASON YORK
TN1500036 / CONSTRUCTION
INSTALLING SMALL TENT ON DEC 29 2014 FOR THE BRIDGESTONE WINTER CLASSIC ON 1-1-15 WITH GENERATOR TENTS REMOVED ON 1-2-15
808 L ST SE   
12/10/14 
NAVY YARD ASSOCIATES LLC / KE-MAURELLE PREDDIE
B1412006 / CONSTRUCTION
NEW OFFICE USE FOR 1254 SQ. FT. EXISTING TWO STORIES PLUS BASEMENT STRUCTURE ON SE / C-3-A ZONING DISTRICT. MECHANICAL ELECTRICAL AND PLUMBING REMAIN AS IS.
80 M ST SE   
12/10/14 
WELLS REIT II 80 M STREET LLC / ANTHONY G SAMBURG
E1501724 / SUPPLEMENTAL
14 M ST SE   
12/16/14 
ROMAN CATHOLIC ARCHBISHOP OF WASHINGTON / PHILLIP B. MOBLEY
FB1500047 / SUPPLEMENTAL
20 M ST SE   
12/04/14 
TRANSWESTERN JEFFREY GROSS / OLLIE READ; TRANSWESTERN JEFFREY GROSS; CHRISTOPHER SCHULZE
AR66514546 / SUPPLEMENTAL
   
12/04/14 
TRANSWESTERN JEFFERY W GROSS / ANDREW ARNTSON; TRANSWESTERN JEFFERY W GROSS; ANDREW ARNTSON
P96600069 / SUPPLEMENTAL
80 M ST SE   
12/03/14 
MARY JACKSON
PC44081129 / POST CARD
REPLACEMENT OF NOT MORE THAN 1 GAS APPLIANCE ON A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
   
12/05/14 
WELLS REIT II 80 M STREET LLC /
P1501746 / SUPPLEMENTAL
100 M ST SE   
12/03/14 
SQUARE 743 INC. / SAM HOLLEN RAMCO OF DC INC.
B1502037 / CONSTRUCTION
INTERIOR RENOVATION TO 4TH FLOOR OFFICE SPACE. SUBDIVIDE TENANT SPACE AND ADD PANTRY. PARTITIONS MEP AND LIFE SAFETY. NORTHWOOD INVESTORS LLC
202 M ST SE   
12/10/14 
DISTRICT OF COLUMBIA / WOODY WICKLIFFE
TN1500035 / CONSTRUCTION
INSTALL 50FT X 100FT TENT NO GENERATORS NO COOKING NO SMOKING NO STAGES 10FT X 70FT TENT INSTALLED DEC 11-15 2014 EVENTS DEC 12-14 2014 12:01PM - 9:00 PM
1201 M ST SE   
12/11/14 
CARLTON RAY
AH1500149 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
75 N ST SE   
12/11/14 
CRANE SERVICE CO / CHRISTINE LONG
AH1500150 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 2:00AM THRU 11:00PM
800 NEW JERSEY AVE SE   
12/08/14 
SQUARE 737 LLC / GLENNWOOD ROGERS
P1501673 / SUPPLEMENTAL
25 POTOMAC AVE SE   
12/02/14 
RIVERFRONT HOLDINGS I LLC C/O ECC INC. / ECC INC.
UT1500007 / CONSTRUCTION
REMOVAL OF ONE 100-GALLON UNDERGROUND STORAGE TANK DURING MASS EXCAVATION ACTIVITIES FOR SITE REDEVELOPMENT.
   
12/03/14 
RIVERFRONT HOLDINGS I LLC / WOODY WICKLIFFE
TN1500032 / CONSTRUCTION
INSTALL 40FT X 80FT TENT NO COOKING NO SMOKING NO PROPANE NO LIGHTING 40FT X 40FT TENT 2 GENERATORS 25KW EACH 20FT X 20FT TENT 8FT X 20FT PLATFORM 40FT X 40FT PLATFORM 20FT X 20FT PLATFORM INSTALLED DEC 8 -9 2014 EVENT DEC 9 2014 9AM - 4PM
   
12/05/14 
FLORIDA ROCK PROPERTIES INC / ROBERT S. WATTS
E1501658 / SUPPLEMENTAL
   
12/05/14 
RIVERFRONT INVESTMENT PARTNERS / JASON BENTLEY
B1408697 / CONSTRUCTION
CONSTRUCTION OF NEW 9 STORY BUILDING. THIRD PARTY REVIEW
1500 SOUTH CAPITOL ST SE   
12/18/14 
NATIONALS PARK / MARK W GIBSON
E1501975 / SUPPLEMENTAL
300 TINGEY ST SE   
12/15/14 
FC BOILERMAKER LLC / GREGORY BIRCKHEAD; FC BOILERMAKER LLC; MICHAEL BELL
E55526822 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.