Since January, 2003

Advertise on JDLand
 (a random before-and-after moment)
December 29, 2008
July 12, 2015
2nd (Mid) at Tingey, Looking East (see more)

The Bullpen, the outdoor bar and festivities spot that has operated just across the street from Nationals Park during stadium events since 2009, is making plans to open a "Beer Garden" at the northern end of their current block, at Half and M streets, SE, facing the western entrance to the Navy Yard Metro station. (See my high-quality graphic at right.) With 79 picnic tables holding eight people each, it would have a seating capacity of 632 people, and would offer draft German beers (and perhaps other European beers) along with German sausages, kielbasa, and other light (ahem) fare.
"Das Bullpen" [copyright JD] is being envisioned as having a very different atmosphere from the current Bullpen, with the beer garden not having game areas with lots of kids running around. There would be no amplified music, and it would operate during the same hours as Bullpen 1.0 (which will be remaining open this year as well). It would have its own entrance, right across from the Metro station's entrance, and would be fenced in and partially covered/tented in the same way as the existing Bullpen.
At an ANC 6D ABC subcommittee meeting tonight, a Bullpen rep explained that Akridge, the owners of the entire block bounded by M, N, Half, and Van, has informed the Bullpen owners of plans to begin construction perhaps as early as October of this year on the southern end of the block, where Bullpen 1.0 is located. (There seems to have been some sort of "hint" that if the Bullpen wants to have a shot at a permanent home in the new ground-floor retail spaces that will be available when the block is completed, they need to expand to this additional area this year.) If Akridge's plans are unchanged from what went through the zoning process a few years ago, the southern end of the block would be a 300-unit residential building with ground-floor retail. You can see renderings on my Akridge Half Street page.
As you can see on my cruddy map, there will still be substantial parking available between the two locations. (For old-timers, this new site is where WMATA's old Southeastern Bus Garage entrance was located.)
The Bullpen's lawyers are trying to determine whether this constitutes an expansion of the current operation, to allow Das Bullpen to open under their existing liquor license, or whether a new license (and then a new voluntary agreement with the ANC) will be needed. More to come, I'm sure.
UPDATE: And it should be noted that this is a completely separate venture from the Bavarian Beer Garden plans at 8th and L, SE. Beer gardens to the left! Beer gardens to the right!
UPDATE II: To clear up any confusion, they are intending to have Das Bullpen open this spring, with Bullpen 1.0 open as well through the end of the 2011 baseball season.
UPDATE III: Another clarification: The new site has no official name yet. "Das Bullpen" is purely my invention, because I wanted something catchy to describe it.
Comments (8)
   
 
 More About JBG/Akridge Half St.

JDLand.com Home

Comments

E. Carlin says: (2/2/11 10:25 PM)
I understand the German theme has the backing of the team's Internet fan club, the Nats E-Party.


Jay Roberts says: (2/3/11 9:21 AM)
From buses to buzzes, he, he...


Alan says: (2/3/11 1:32 PM)
Slightly confused; is the goal to open this secondary watering hole by opening day this year and have two places for the 2011 season and then just the Beer Garden for 2012 and beyond or will it be just the bullpen this year and then just the beer garden next year?


JD says: (2/3/11 1:34 PM)
The goal is to have both for this year and just the beer garden next year.


Tom says: (2/3/11 5:07 PM)
I'm slightly disappointed that the folks who operate the Bullpen and Das Bullpen don't seem to have any desire in opening a permanent facility in the neighborhood.

To me, they want our money, but only during baseball games. What about when the team is in Chicago and I still want a beer on a Saturday afternoon?

There's plenty of ground floor retail that would be perfect for a restaurant (even one above the Metro!).

Very disappointed.


JD says: (2/3/11 6:00 PM)
"Tom", I think in this case what they're doing is trying to (p)reserve a permanent spot in Akridge's Half Street project, which will be a prime place to be when it is ever finished. The Bullpen rep basically said last night that they were told that if they didn't add Das Bullpen this year, they would lose the chance at one of the permanent retail spaces when that side of Half Street is built out.

I'm guessing there will be at least one new sit-down restaurant option announced in the area before 2011 is out.


Tom says: (2/4/11 9:22 AM)
While I understand that, even if ground were broken tomorrow, it would still be at least two years before the structure is complete. The key words are "when it is ever finished".

Obviously they see a need for increased space during the baseball season, it's just a shame that they don't see the need for ANY space during the rest of the year, as it stands right now.


rj says: (2/6/11 2:37 PM)
Maybe the bullpen guys are opening up das bullpen to make money. its called business.

I want more permanent businesses in the neighborhood too, but to be disappointed by an entrepreneur who sees an opportunity to make a profit is pretty childish.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2015!
 Top News
  
willinrm on Due South Opening: does anyone have a navy yard/eastern market/capitol hill happy hour website? dat...
Section314 on Due South Opening: First thing back, you can go take pictures of the construction starting at 99 M....
JD on Due South Opening: Me too! :-) I'll be back in the saddle next week, and well refreshed too, wit...
willinrm on Due South Opening: This comment section has become my new source of news!! lol



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O POTOMAC AVE SE   THEFT F/AUTO
 08/17/15
500 B/O L ST SE   THEFT F/AUTO
 08/17/15
UNIT B/O K ST SE   THEFT F/AUTO
 08/16/15
500 B/O L ST SE   THEFT
 08/08/15
UNIT B/O I ST SE   BURGLARY
 08/07/15
300 B/O WATER ST SE   THEFT
 08/05/15
UNIT B/O I ST SE   THEFT
 08/04/15
50 B/O M ST SE   THEFT
 08/04/15
400 B/O M ST SE   THEFT
 08/03/15
1100 B/O NEW JERSEY AVE SE   THEFT
 07/29/15

Recent Issued Building Permits Archive  
1277 1ST ST SE   
08/11/15 
BALLPARK RESIDENTIAL LLC / RICHARD V CAREY
P1508164 / SUPPLEMENTAL
   
08/21/15 
BALLPARK RESIDENTIAL LLC BALLPARK RESIDENTIAL LLC / CLINT HOLMES; BALLPARK RESIDE BALLPARK RESIDENTIAL LLC; MITCH PERMUY
E20139177 / SUPPLEMENTAL
1000 5TH ST SE   
08/18/15 
UNITED STATES OF AMERICA / JOSEPH M MAGNOLIA
P1508371 / SUPPLEMENTAL
1150 5TH ST SE   
08/10/15 
DEPARTMENT OF GENERAL SERVICES DC PUBLIC SCHOOL / DEPARTMENT OF G DC PUBLIC SCHOOL
B1511234 / CONSTRUCTION
REVISION TO B1511107 TO CORRECT QUADANT ON ADDRESS FROM 1150 5TH STREET N.E. TO 1150 5TH STREET S.E. TO UPGRADE THE ELECTRICAL SERVICES OF A DISTRICT OF COLUMBIA PUBLIC SCHOOL FROM 1200AMP TO 3 000 AMP.
   
08/11/15 
PEPCO PEPCO
AH1500668 / CONSTRUCTION
INSTALLATION OF CABLE AND METERS
1220 12TH ST SE   
08/13/15 
WASHINGTON GAS LIGHT CO / JOHN GIUSEPPE-RAMCO
B1509350 / CONSTRUCTION
RENOVATIONS TO EXISTING 3RD FLOOR OFFICE SPACE EXELIS AS SHOWN ON THE ATTACHED MECH. PLUMB. ELECT. FIRE PROTECTION DEMOLITION AND ARCH. DWGS. INTERIOR WORK ONLY. NO CHANGE IN US. NO STRUCT. WORK.
909 HALF ST SE   
08/13/15 
BAKER DC LLC / CHRISTINE LONG
AH1500677 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 11:00PM FRIDAY THRU 11:00PM SATURDAY
   
08/18/15 
BAKER DC
AH1500686 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 12:01AM WEDNESDAY THRU 11:59PM THURSDAY. 1-49 BLOCK OF K ST SE
   
08/21/15 
BAKER DC / CHRISTINE LONG
AH1500695 / CONSTRUCTION
AN AFTER HOURS PERMIT IS FROM 12:01AM THRU 11:59PM FROM 08 / 25 / 2015 TO 08 / 29 / 2015
1015 HALF ST SE   
08/13/15 
HALF ST SE LLC / GREGORY E LIGON
E1508399 / SUPPLEMENTAL
   
08/17/15 
HALF ST SE LLC / ANTHONY G SAMBURG
E1508502 / SUPPLEMENTAL
   
08/20/15 
WSP PARSONS BRINCKERHOFF / STEVE AUD; WSP PARSONS BRINCKERHOFF; STEVE AUD
E95740122 / SUPPLEMENTAL
1220 HALF ST SE   
08/12/15 
BUFFALO WILD WINGS / NICOLE WHITE; BUFFALO WILD WINGS; GREG CONCANNON
AR49901357 / SUPPLEMENTAL
   
08/13/15 
BUFFALO WILD WINGS / BELA X-PEDITERS PLUS INC.
AH1500681 / CONSTRUCTION
WORK AFTER HOURS 7PM-7AM. 8 / 13 / 2015 TO 9 / 13 / 2015
601 L ST SE   
08/17/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KRISSY GER LISA LJ PERMIT
B1510955 / CONSTRUCTION
REVISION TO B1101058 MINOR GRADING REVISION
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502944 / SHOP DRAWING
TYPE OF ELEVATOR ONE (1) HYDRO / STEEL / CENTRALLY / PASSENGER TO PROVIDE ACCESS BETWEEN G AND G2 FLOORS AS PER PLANS.
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502945 / SHOP DRAWING
TYPE OF ELEVATOR: TWO (2) TRACTION / STEEL / CENTRALLY / PASSENGER (5TH FLOOR).
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502970 / SHOP DRAWING
TYPE OF ELEVATOR ONE (1) TRACTION / STEEL / CENTRALLY / PASSENGER (6TH FLOOR).
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502971 / SHOP DRAWING
TYPE OF ELEVATOR ONE (1) TRACTION / STEEL / CENTRALLY / PASSENGER (6TH FLOOR).
80 M ST SE   
08/24/15 
COLUMBIA PROPERTY TRUST / KRISTINA DELGADO
B1510944 / CONSTRUCTION
PARTIAL 4TH FLOOR RENOVATIONS INCLUDING MECHANICAL PLUMBING ELECTRICAL AS WELL AS FURNITURE INSTALLATION.
20 M ST SE   
08/19/15 
SOUTHEAST REALTY LLC / ELEANOR FARID; SOUTHEAST REALTY LLC; RODNEY CANNON
E69278004 / SUPPLEMENTAL
50 M ST SE   
08/11/15 
MILLER?LONG
TC1500036 / CONSTRUCTION
TOWER CRANE FOR JOB SITE USE
   
08/13/15 
MILLER?LONG MILLER?LONG
AH1500674 / CONSTRUCTION
AFTERHOURS TO PUT UP TOWERCRANE WITH 200 TON MOBILE CRANE SATURDAY 8 / 15 / 2015 AND 8 / 16 / 2015 FROM 5AM TO 9PM
   
08/14/15 
KCG 50 M LLC / JOSEPH E RICHARDS
E1508432 / SUPPLEMENTAL
   
08/21/15 
KCG 50 M LLC / DANIEL R. RUDE
P1508460 / SUPPLEMENTAL
55 M ST SE   
08/19/15 
DOUG OLSON / DOUG OLSON; NONE
SG1500414 / CONSTRUCTION
NEW SIGNS INSTALLATION AS PER PLANS
1100 NEW JERSEY AVE SE   
08/11/15 
CHRISTOPHER CONDON
PC69159304 / POST CARD
INTERIOR DEMOLITION OF NON-BEARING ELEMENTS IN A SPACE UP TO 5 000 SQUARE FEET (464.5 SQUARE METERS)
1500 SOUTH CAPITOL ST SE   
08/14/15 
P1508259 / SUPPLEMENTAL
301 WATER ST SE   
08/12/15 
LUMBER SHED LIC / ROBERT WATTS; LUMBER SHED LIC; ROBERT WATTS
E99575145 / SUPPLEMENTAL
355 WATER ST SE   
08/14/15 
TIAN LUU / TIAN LUU; TIAN LUU; JAMES BORROR
E95497821 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




     © Copyright 2015 JD.