Since January, 2003
            
 (a random before-and-after moment)
May 4, 2003
June 16, 2018
Cushing at N, Looking East-Southeast (see more)

City Paper's Housing Complex blog has some new details on the plans for the Miles Glass site at 8th and Virginia by the new owners, the National Community Church (aka the Ebenezer's Coffeehouse folks). Pastor Mark Batterson says that he's envisioning "two performance spaces, one at about 500 seat capacity and another at a thousand, with at least one level of underground parking to handle the crowds. To keep the kids busy while adults are worshiping–or drinking coffee, or going to a play–there will be a large childcare center so special that they've retained the architects who created downtown Disney to design it."
They are also negotiating with adjacent parcels (which Batterson alluded to a few weeks ago, which by his description seems to include the empty lot on 7th), to make the "campus" somewhere between 50,000 and 75,000 square feet of developed space when completed. Batterson hopes to break ground within a year, with construction taking 12 to 18 months (so, probably 2013).
With a coffee house/performance space/church at the north end of the block and a beer garden at the south end, I may have to dub this spot the Saints and Sinners Stretch of 8th Street.
UPDATE, 11/18: If you've got ideas or notions for what you'd like to NCC do on this site, leave them in the comments--Mark Batterson has posted there this morning that everything's still really "up in the air" at this point, and they'd love to hear feedback.
Comments (13)
   
 
 More About 8th Street

JDLand.com Home

Comments

BillP says: (11/17/10 3:54 PM)
does anybody know if they are definitely purchasing that adjacent lot on 7th facing the main entrance of the marine BEQ (as i thought was reported previously) or is that still under consideration, not yet under contract, etc.?


JD says: (11/17/10 3:57 PM)
I assume that's the one they're talking about being in negotiations in, that I mentioned above. Hasn't shown up in the property sales database yet. I'm watching.


mikescorpio says: (11/17/10 4:03 PM)
Saints & Sinners. I like it!


Mark says: (11/17/10 6:10 PM)
Awesome, fantastic news JD! Thanks for passing it along!!


Mark Batterson says: (11/18/10 9:58 AM)
Our plans are SO FLUID right now. We're meeting with community leaders, community groups. We're trying to assess community needs or gaps that we can help meet with this property.

We're pretty locked into a coffeehouse on the corner of 8th and Virginia. We'll take our Ebenezers concept at 2nd and F, NE to the next level (I think the parking + seating will make it a draw to lower barracks). We probably will do some sort of performance theater/event space like the Atlas but larger. And we're exploring daycare or early ed possibilities given the growth of Navy Yard and the needs of young families on the Hill and Riverfront. But everything is really "up in the air" right now. We don't want to put too many ideas out there because we're still in our due diligence phase.

It'll take 4-6 months to really assess needs and consider options. We are working with architects in the meantime!

We'd love to hear feedback, ideas, etc.

Thanks for this forum!


Interested Party says: (11/18/10 10:55 AM)
Have you talked with the immediate neighbors at all to get their input?


Kelsey says: (11/18/10 11:05 AM)
I am an immediate neighbor and we have not had a chance to submit any input yet. However, I know the announcement/news are still in the early stages.

We currently live next to the empty lot on 7th St. that looks out to the barracks. I would be very interested in learning more about what Mark's plans are for both empty lots as any construction will greatly impact our house.

What are your plans for parking? Due to the navy yard and department of transportation, parking during the week street parking is already at it's max.

Should we be concerned about noise levels during church activities?

Thanks for answering our questions.


Mark Batterson says: (11/18/10 12:43 PM)
Great questions!

We've met quite a few neighbors, but not everyone yet.

We'll do a subterranean parking garage that I think will actually help parking situation during the week. I've lived on the hill for 14 years so I know the hassle of finding a parking spot by your home :)

When we built Ebenezers Coffeehouse our objective was to make sure the neighbors loved it first and foremost. And I think we've accomplished that. In fact, i think we've added significant value to adjacent properties given the fact that we took a nuisance property and turned it into a first-class coffeehouse. Hope this project has the same effect.

In terms of noise, we'll be very conscientious of making sure there is great sound-proofing in the performance theater so noise doesn't travel beyond our building.

Keep the questions/concerns/ideas coming!

Mark


C says: (11/18/10 4:43 PM)
One vote for a daycare, right between the coffeehouse and beer garden, perfect!


BillP says: (11/18/10 10:24 PM)
I lived on F St NE during and after the time that Ebenezer's coffeehouse and the Church offices were being constructed in a partial rehab / partial new construction project.

Mark's church was a great neighbor during the process, they came up with a great design that maximized the adaptive reuse possibility at the site as well as making the new construction minimally (if at all) intrusive onto the brick 1890s era rowhouses that abutted Mark's site on all sides. Their development continues to be a fantastic asset to F Street NE and the surrounding neighborhood.

I would expect nothing less with their new development here in Barracks Row. I am hopeful that, although this project will be much larger and present far greater challenges, it will also provide more opportunities for an iconic design and a very positive contribution to the entire neighborhood.


Mark Batterson says: (11/19/10 7:16 AM)
Thanks Bill.

And I daresay that it will be a little easier doing construction on a lot that is larger than the Ebenezers lot.

Mark


Mark says: (11/19/10 9:46 AM)
Mark - my family and I could not be happier to welcome you and your church community into our neighborhood. We are pleased with all of your plans - the coffee house, the theater space - and, with two small children in our home, the child care and early education opportunities. While my wife currently stays at home with the children we would be interested in pre-school for our children, particularly if there will be some Christian foundation to the child care/ early childhood education.

Bottom line, we are excited about visits to the coffee shop and everything else your community and building will bring to our neighborhood. Welcome!

Cheers,
Mark


Sarah says: (11/20/10 7:39 AM)
I second the excitement for the possibility of a nursery school/day care. Our options are so limited in the area, and the idea that the foundation may be Christian-based, (or at least in a positive space) is great!
Hope all works out!

Sarah

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

Alex B. on Transportation Study Meeting: That rendering of Walters seems a bit misleading, as it would imply a two story ...
caphillguy on Transportation Study Meeting: For everyone's information: the intersection at Virginia Ave and 7th Street was ...
JD on Transportation Study Meeting: Some details on Walters Sports Bar, still planning on coming to the space below ...
202_cyclist on Transportation Study Meeting: Exciting news folks! It looks like there was soil testing today for the former ...
CJBabyDaddy on Transportation Study Meeting: @RMP & @jdc: Sign on the front door says: “We are waiting on some officia...
conngs0 on Transportation Study Meeting: JD, thanks for passing along the update on the Capper Seniors building. I suppo...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 12/15/18
200 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/14/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/13/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/13/18
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 12/11/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 12/09/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/09/18
1100 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 12/08/18
900 B/O 1ST ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/06/18
UNIT B/O N ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/05/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/01/18
1200 B/O HALF ST SE   ROBBERY  11/30/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/28/18
700 B/O L ST SE   THEFT
Shoplifting
 11/26/18
1255 1ST ST SE   ASSAULT WITH A DANGEROUS WEAPON  11/25/18
1200 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/23/18

Recent Issued Building Permits Archive  
1300 4TH ST SE 1ST FL   
12/12/18 
null / WAYNE DAUGHERTY 7035247911
E1902414 / SUPPLEMENTAL
1300 4TH ST SE   
12/11/18 
PARCEL O 1-LLC / N/A
B1900015 / CONSTRUCTION
Yards Parcel O1 - Revision to Base Building Permit B1609947 to incorporate minor design changes including converting a residential unit to a fitness center. TPR
1300 4TH ST SE B1   
12/12/18 
null / WAYNE DAUGHERTY 7035247911
E1902413 / SUPPLEMENTAL
1331 4TH ST SE CU   
12/10/18 
FC 1331 LLC / null
P1902045 / SUPPLEMENTAL
1300 4TH ST SE PENTHOUSE   
12/12/18 
null / WAYNE DAUGHERTY 7035247911
E1902412 / SUPPLEMENTAL
1300 4TH ST SE   
12/10/18 
PARCEL O-1 LLC / RICHARD V CAREY 301-424-8899
FB1900032 / SUPPLEMENTAL
(2) NEW INSTALL Gross 1,840,000 BTU / HR Natural Gas HW
1346 4TH ST SE   
12/07/18 
FC 1346 LLC / null
FB1900031 / SUPPLEMENTAL
1000 5TH ST SE   
12/11/18 
UNITED STATES OF AMERICA / null
E1902394 / SUPPLEMENTAL
   
12/11/18 
UNITED STATES OF AMERICA / BRANDON WILSON; BRANDON M WILSON
B1902777 / CONSTRUCTION
Kitchen Area: -Interior only Frame about 7lf around one column as per 2 / A030 -Add 260 SQF bulkhead as per 1 / A030 None Load bearing wall on first floor and second floor.. M,E,P, will be provided on another permit. IT Lounge -Add 194 SQF bulkhead as per 3 / A030
2 I ST SE   
12/10/18 
MCDONALDS CORPORATION / KIM MITCHELL
B1814290 / CONSTRUCTION
The submitted drawings are a revision to those approved under building permit #B1703907, and include the incorporation of a new corridor connection at the roof level between phase 1 and phase 2 buildings, and corresponding revisions. Revised Mechanical / Plumbing / Electrical drawings are included to reflect the change of Engineers of Record. Interior Design Drawings are also included. Various...
   
12/14/18 
CRESCENT CAPITAL VIEW, LLC / ERICKA CLARK
AH1900295 / CONSTRUCTION
Dismantle of tower crane. Minimal noise impact and required for reduction on impact to traffic.
250 M ST SE   
11/28/18 
SQUARE 769 LLC. / CONOR LAW
BCIV1800147 / CONSTRUCTION
New construction of erosion and sediment controls, domestic water service, fire service, sanitary sewer service, storm sewer service, curb & gutter, street trees, misc. landscaping, sidewalk, storm water management.
   
12/05/18 
null
E1902214 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE STE# 420   
11/27/18 
SQUARE 742 LLC / JAMES W LASHER
E1901850 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
11/20/18 
SQUARE 742 LLC / null
E1901715 / SUPPLEMENTAL
   
11/26/18 
SQUARE 742 LLC / null
P1901600 / SUPPLEMENTAL
   
11/26/18 
SQUARE 742 LLC / null
M1900652 / SUPPLEMENTAL
   
11/29/18 
SQUARE 742 LLC / JOE SAFFER
P1901753 / SUPPLEMENTAL
   
12/04/18 
SQUARE 742 LLC / PAUL WHITLEY
AN1900004 / CONSTRUCTION
This project consists on installing (9)proposed antennas , RRU's, and hybrid cables on an existing building, and removing (9) existing antennas, RRU's, TMA's, and hybrid cables.
   
12/05/18 
SQUARE 742 LLC / JOHN M. GIUSEPPE
B1900960 / CONSTRUCTION
renovations to 3rd floor office space SUITE 300 NATIONAL ASSOCIATION OF AREA AGENCIES ON AGING as shown on the electronically submitted mech., plumb., elect., fire protection, demolition, and architectural dwgs. Interior work only. No change in use. NO structural work involved. 7000 sf. **LEVEL 2 ALTERATION, DEMOLITION
125 O ST SE 2-6FL   
11/28/18 
DISTRICT OF COLUMBIA / ANDREW KLEIN 2408991526
E1901923 / SUPPLEMENTAL
125 O ST SE   
11/27/18 
DISTRICT OF COLUMBIA / MICHAEL P. LYONS
E1901853 / SUPPLEMENTAL
   
11/27/18 
DISTRICT OF COLUMBIA / WILLIAM H. JONES
E1901854 / SUPPLEMENTAL
   
11/29/18 
DISTRICT OF COLUMBIA / WESLEY R. DAVIS
E1901951 / SUPPLEMENTAL
   
11/29/18 
DISTRICT OF COLUMBIA / null
P1901748 / SUPPLEMENTAL
79 POTOMAC AVE SE   
11/27/18 
RIVERFRONT HOLDINGS LLC / null
AH1900270 / CONSTRUCTION
AFTER HOURS 7PM TO 7AM FINAL CONNECTION OF RELOCATED 8” SANITARY LINE
71 POTOMAC AVE SE   
11/26/18 
RIVERFRONT HOLDINGS I LLC / JUSTIN BELLOW
B1804337 / CONSTRUCTION
New 264-Unit 13-Stories Apartment House
   
12/03/18 
RIVERFRONT PROPERTIES LLC / null
P1901813 / SUPPLEMENTAL
   
12/13/18 
RIVERFRONT HOLDINGS LL, LLC / PARKER HARRELL
SB1900071 / CONSTRUCTION
Abandoning 20 temporary wellpoints and 3 gravel packed wells originally installed for dewatering during construction.
79 POTOMAC AVE SE   
12/13/18 
RIVERFRONT HOLDINGS I LLC / null
E1902479 / SUPPLEMENTAL
227 TINGEY ST SE   
11/30/18 
FOREST CITY WASHINGTON / DFM DEVELOPMENT SERVICES, LLC
AH1900285 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of installing precast concrete façade panels. Work to take place 7PM to 7AM, 12 / 5 / 2018 to 1 / 5 / 2019.
300 TINGEY ST SE   
12/04/18 
FC BOILERMAKER LLC / STEPHEN ADAMS 2403042373
E1902120 / SUPPLEMENTAL
   
12/06/18 
FC BOILERMAKER LLC / GARY BRENT; N/A
SG1900027 / CONSTRUCTION
Install 1 illuminated edge-lit wall logo sign, 1 illuminated halo-lit letter sign, 1 double-sided push thru edge-lit blade sign - LULULEMON
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.