Since January, 2003
            
 Sliding from Before to After

From the world of ANC 6D:
* The commission voted 7-0 to support the historic designation application of St. Paul's AUMP Church at 401 I St., SE, thanks in no small part to Pastor Karen Mills, who charmed the pants off the assembled commissioners and audience with a display of good humor sorely needed after some earlier rancorous exchanges discussing Southwest Waterfront issues.
The church was built in 1924, and apparently the years of having a congregation that didn't have a lot of money ended up being a good thing: because there have been few renovations, the church's facade and bricks are still from the original construction, making it a far better candidate for a historic designation than other churches which have had work done. The church is also notable for being the first church designed by R.C. Archer Jr., who was only the second licensed African American architect in DC. Once the church receives its historic designation, it will then be eligible for some grants to allow for historically accurate and preservation-approved renovations. (The photo above shows the church in 2007, when it stood alone after the demolition of the Cappers and before the start of Capitol Quarter construction.)
The church was approached for this application by the DC Preservation League, and the hearing before the city's Historic Preservation Review Board is scheduled for Nov. 18 at 9 am. You can see the information forwarded to the ANC about the application here (shot with my phone's camera, so not of particularly high quality, but it made me feel like a secret agent!). One other educational tidbit: "AUMP" stands for "African Union Methodist Protestant."
Pastor Mills also said that anyone who wants to come see St. Paul's is more than welcome to visit. And so it is with great shame that I admit that I have never been inside of the little church I've photographed so many times --I've always been worried that I would burst into the flames of eternal hellfire the second I stepped inside the doors, and I didn't want the poor little church to get singed as a result of my sins. But I'm now determined to give it a shot anyway.
* CSX/Virginia Avenue Tunnel: Stephen Flippin of CSX gave a(nother) update on the status of the Virginia Avenue Tunnel project. While CSX had applied for a $3 million grant under USDOT's TIGER II program to help pay for the NEPA process for the project, they didn't get that funding, so the process got delayed by a couple of months. They are now looking to have the first "public scoping meeting" in January, which would include information booths, audience comments and questions, etc. There would then be a 30-day comment period, followed by an "alternatives" meeting probably in March, then another comment period followed by probably five or six months of work with their design/build team before coming back to another public meeting for a full update on the project. After that, they would need a few months with their designers before construction could begin, which puts the earliest possible starting time for the project somewhere around the spring of 2012. (Definitely not a date written in stone.)
There's also the issue that funding for the tunnel project itself hasn't been secured, and so CSX is looking at various public financing possibilities (transportation reauthorization act, funding from other states in the National Gateway) as well as -- gasp! -- using some of their own money, or at least money they received for other parts of the Gateway that they haven't spent.
Beyond this update on the process, there's no new information on the construction itself, and there pretty much won't be until after the NEPA process is done.
* 11th Street Bridges: There was also an overview and status report on the 11th Street Bridges project; I'm hoping to get the slides that were shown, so I'll hold off on writing about that. If in the meantime you have 9 or 10 free hours and want to delve into all the environmental impact studies that were done for the bridge project (which include traffic estimations among many other things), here's the Environmental Impact Statement and other associated documents. UPDATE: Here's my writeup of the slides.
* Near SE/SW Combined Traffic Study: During a discussion about pedestrian safety issues at 4th and M, SW, commissioner Andy Litsky reiterated his long-standing complaint that no traffic study has been undertaken to look at Near SE and SW together, and that it continues to be sorely needed. Naomi Mitchell of Tommy Wells's office then spoke up that Tommy is ready to help the ANC finally get this study done. (And there was much rejoicing.)
* Half Street Closures: Apparently the city is planning to move legislation that would allow for the closing of Half Street, SE, between M and N during all events at Nationals Park with more than 5,000 attendees, instead of the current set-up where it's only closed during Nationals games. This would include recent events like the Susan G. Komen Race for the Cure opening ceremonies and last Saturday's Greater Washington Region Start! Heart Walk.
Comments (5)
   
 
 More About 11th Street Bridges

JDLand.com Home

Comments

Axiom says: (11/9/10 10:05 AM)
"which puts the earliest possible starting time for the project somewhere around the spring of 2011. (Definitely not a date written in stone.)"

The timeline seems to match up with an earliest possible starting date of spring 2012, unless my reading comprehension is totally off.


JD says: (11/9/10 10:08 AM)
Thanks, "Axiom", that was a late-night fat-finger.


V says: (11/9/10 2:31 PM)
here's an unrelated FYI in case anyone is interested--- translation: I'm not going to watch, but wouldn't mind a recap ;)

----------------
link
-----------------
News Release

Forest City to Webcast Investor Day Event From Washington, D.C.

CLEVELAND, Nov. 8, 2010 /PRNewswire via COMTEX/ --

Forest City Enterprises, Inc., (NYSE: FCEA and FCEB) today announced the Company will webcast its upcoming Investor Day event beginning at 9:00 a.m. Eastern time on Wednesday, November 10, 2010. The event is being held at the Arena Stage's Kreeger Theater in Washington, D.C.


The event will be hosted by Charles A. Ratner, chief executive officer of Forest City Enterprises, Inc., and include updates on the business from Chief Financial Officer Robert G. O'Brien and Chief Operating Officer David J. LaRue. They will be joined by leadership from Forest City's Washington office, who will provide an update on projects in Washington and the Mid-Atlantic region, as well as on the Company's military family housing business.

The webcast of the event will be accessible through the investor relations page of Forest City's website, link A webcast replay will also be available on the website.

About Forest City

Forest City Enterprises, Inc. is an NYSE-listed national real estate company with $11.8 billion in total assets. The Company is principally engaged in the ownership, development, management and acquisition of commercial and residential real estate and land throughout the United States. For more information, visit link

SOURCE Forest City Enterprises, Inc.



BillP says: (11/9/10 9:11 PM)
i wish somebody would ask Pastor Mills about why the church is seemingly always empty, including on Sunday mornings? i've lived a block away for five months now, i work from home and have still yet to see one person going into or coming out of that church. my gut tells me to never trust a church that is empty on sunday mornings (kidding!) but i would love to know a little more about their situation and their plans for the future.


Landon says: (11/11/10 10:35 AM)
Last week, a commission of ANC and DDOT officials were out observing the traffic patterns at 4th and M, SW. While they were there, they observed 7 illegal U-turns, one made by a woman who has an email listserve in the neighborhood and has recently railed against unsafe driving at that intersection! Silver-haired African Amer. woman with green eyebrows. Residents know who that is...

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

ColoradoCane on Slider-Palooza 2019: Does anyone know what the work going on at the intersection of NJ & I St. al...
CJBabyDaddy on Slider-Palooza 2019: @Walt: Start here — https://www.bluedrop.co/services/facility-rental/
willinrm on Taking a Look/Tingey: interestingly enough Chief Marcelle from BlueJacket will be leaving bluejacket t...
walt on Slider-Palooza 2019: Great info on DC Water -- thanks everyone. I'm going to see if I can get an es...
CJBabyDaddy on Slider-Palooza 2019: The lobby, roof, and 4th floor meeting space are available for rental.
conngs0 on Slider-Palooza 2019: I totally agree that the first floor of the DC Water HQ looks fantastic. I hope...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 3RD ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/19
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 11/01/19
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/19
400 B/O M ST SE   THEFT
Shoplifting
 10/30/19
200 B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/19
100 B/O H ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/28/19
900 B/O NEW JERSEY AVE SE   ROBBERY  10/28/19
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/27/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/24/19
100 B/O H ST SE   ROBBERY  10/23/19
1400 B/O SOUTH CAPITOL ST   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/22/19
100 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/21/19
70 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/21/19
300 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 10/20/19

Recent Issued Building Permits Archive  
1331 2ND ST SE   
11/08/19 
DC WATER / CRAIG M COOK
B1907684 / CONSTRUCTION
Flood mitigation, seal openings, install brackets for stop logs, replace elevator shaft with concrete slab.
1300 4TH ST SE   
11/15/19 
ASANA PARTNERS / DEBRA MARSHALL; THE DONOHOE COMPANIES INC
B2001773 / CONSTRUCTION
ADD EXTERIOR DOOR, ADD INTERIOR DOOR , ANY RELAYED,ELECTRICAL,PLUMBING, RELOCATING UNBUILT APPROVED NON LOAD BEARING FIRE RATED PARTITIONS @ FIRST FLOOR APPROVED UNDER PERMIT #B1711970. ATTACHED
1346 4TH ST SE   
10/23/19 
FC 1346 HOLDCO I LLC / GARY BRENT; NA NNA; NA
SG2000046 / CONSTRUCTION
Install 1 illuminated wall sign & 2 non-illuminated wall sign - ALBI
300 M ST SE SPACE B   
11/06/19 
FEDERAL CENTER LP / null
M2000403 / SUPPLEMENTAL
100 M ST SE SUITE 200 20003   
10/25/19 
MONUMENT REALTY LLC / null
E2001081 / SUPPLEMENTAL
100 M ST SE STE# 200   
10/25/19 
SQUARE 743 INC / MIGUEL A. MOROTE; MIGUEL A. MOROTE
E2001078 / SUPPLEMENTAL
300 M ST SE   
11/06/19 
FEDERAL CENTER LP / RUBEN MOVSISYAN; RUBEN MOVSISYAN
E2001472 / SUPPLEMENTAL
   
11/11/19 
FEDERAL CENTER LP / null
P2001215 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
11/05/19 
809-853 NEW JERSEY AVENUE ACQUISITION, LLC / JAVIER A GRACIA; NA NA
SB2000011 / CONSTRUCTION
Drilling and installation of 3 inclinometers which will be extended to a depth of 25 below existing site grade as well as the installation of 4 settlement optical monitoring points which will be extended to depths ranging between 5 feet to 30 feet below existing site grades.
   
11/15/19 
CSX TRANSPORTATION INC / ERICKA CLARK; DGS CONSTRUCTION
TC2000008 / CONSTRUCTION
(2) tower cranes
1100 NEW JERSEY AVE SE 1ST   
11/04/19 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2001381 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 410 20003   
10/24/19 
WILLIAM SNOODT / null
P2000729 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
10/23/19 
SQUARE 742 LLC / TRACIE TRACIE; TRACIE TRACIE; KALI A. SHELTON
SG2000051 / CONSTRUCTION
One wall mounted sign illuminated.
   
11/01/19 
SQUARE 742 LLC / ;
P2000952 / SUPPLEMENTAL
   
11/05/19 
SQUARE 742 LLC / BETSY H MARINO; RICHARD PEPPER; BETSY H MARINO
SG2000062 / CONSTRUCTION
Remove Alion sign and replace with illuminated wall sign reading SERCO
1111 NEW JERSEY AVE SE   
11/15/19 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / TANYA HILL; THYSSENKRUPP
ER2000366 / SHOP DRAWING
REPLACE EXISTING 8MM WORN HOIST CABLES WITH LIKE IN KIND ON ELEVATOR #4. WORK TO ALLOW UNIT TO BE RETURNED TO SERVICE.
1299 NEW JERSEY AVE SE   
11/12/19 
BROOKFIELD DEVELOPMENT / JUSTIN BELLOW
BP2000489 / POST CARD
71 POTOMAC AVE SE   
11/08/19 
RIVERFRONT HOLDINGS II, LLC / JAMES VANEGAS
AH2000075 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
201 TINGEY ST SE   
11/14/19 
BROOKFIELD PROPERTIES / DFM DEVELOPMENT SERVICES, LLC
AH2000197 / CONSTRUCTION
Afterhours work at Tingey Square Project. The work performed will be forming, prepping and paving at Tingey Square park. Friday and Saturday the 15th & 16th, from 7PM to midnight. If required, Sunday the 17th from 7AM to 3PM. ANC Support provided. Associated Permit Include PA328164-R1 and PA10760162.
520 TINGEY ST SE   
10/30/19 
UNITED STATES OF AMERICA / JOHN WICKLIFFE; TBD
TN2000020 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed Feb 9, 2020 - Aug 4, 2020 Events Daily 8:00 am - 10:00 pm
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.