Since January, 2003
            
 Sliding from Before to After

I was recently successful in pestering David Cortiella, grand poobah of the Capper/Hope VI realm at the DC Housing Authority, into giving me an update on the various projects in Near Southeast that he's currently working on. Here's the latest, while always keeping in mind that dates, especially in These Uncertain Economic Times, are not written in stone:
* At Capitol Quarter, the public infrastructure work on Phase 2 has already started, as people can see by the earth that started being moved in late September on the block bounded by 3rd, 4th, I, and K. The financing for this block's construction is expected to close at the end of this week, which would allow for the completion of the first houses by the middle of next year. The entire Capitol Quarter development is expected to be finished by the middle of 2013.
* On Square 882 (the block bounded by 5th, 7th, L, and M), the Housing Authority continues to work toward the construction of an 189-unit mixed-income apartment building on the north side of the block (along L Street, seen below). Their application for an FHA mortgage loan guarantee was submitted earlier this month, and DCHA is expecting that financing for the project will be in place by the end of the year, with construction starting in late winter or early spring of 2011.
As part of 882's new construction, the existing parking lot (known to Nats fans as economy Lot W) will be downsized somewhat, but not eliminated altogether. DCHA is estimating that there will be 190 parking spaces in the new lot, and that the lot will continue to be available during the construction of the new apartment building. There will probably be some disruptions when the building construction gets underway, but DCHA expects them to be minor. There's no timeline for when the 600,000-square-foot office building that's also part of the Capper Hope VI plans would get built along the M Street portion of the block, so people who use the lot on a daily basis are probably safe to bet on having it for a while.
* Residents may not be aware that DCHA is also involved in the disposition of the current DPW operations at New Jersey and K, since that block is part of the Capper redevelopment and is slated to eventually have a 322-unit mixed-income apartment building on it. A new site for DPW's trucks has been identified (I don't know where), and once DPW drives off the lot for the last time, the environmental assessments and abatement of the site can get underway. And, as much as it pains me to imagine the neighborhood without that smokestack, it's anticipated that the building and the smokestack will be demolished by the end of 2012.
* Some of the money that DCHA recently obtained on the bond markets to pay for the second phase of Capitol Quarter is earmarked to go toward the infrastructure work around Canal Park, and DCHA is working with the Canal Park Development Association get this funded. [I'll note that not much seems to have happened along 2nd Street since the park's ceremonial groundbreaking, which would seem to jibe with the delicate "working with" phrasing here.]
Comments (11)
   
 
 More About The Bixby

JDLand.com Home

Comments

JW says: (10/12/10 3:36 PM)
Any mention of the Capper apartments between 3rd and 2nd PL? Thanks


JD says: (10/12/10 3:37 PM)
If there had been, I'd have mentioned it. :-) :-) But no, no update on those at this point. Definitely no money in the pipeline for them right now.


Glenn says: (10/13/10 10:47 AM)
I remember musing back on 8/31/10 about the Canal Park groundbreaking being a mere photo op with no sign of any real advance in the actual construction. Here we are nearly a month and a half later, and we only have a tiring round of ceremonies and a finalized primary election. A hearty boo-hiss to each and every "dignitary" present at such a farse.


Adam says: (10/13/10 2:28 PM)
Speaking of 'boo, hiss'...there's been no movement that I can tell at either the LRB site or Harrys...


Sophiamonster says: (10/13/10 3:15 PM)
I saw them pouring the foundation at the LRB site and then doing more foundation prep on Monday.


MJM says: (10/13/10 3:32 PM)
There is pre-work on Canal Park (notice the construction material in the middle section) as stated (so that means construction is underway) and Sophiamonster is right-on about the LRB site, there is a new foundation (about 4 feet off the sidewalk - a smaller building) and there are workers in the pit on most days.


JoeNdc says: (10/13/10 5:04 PM)
JD: Any idea if the DC gov't has any control over the triangular piece of land at 4th, VA Ave and I Street, SE. According to the National Park Service website, the Feds own it. However, DC's website says that they (DC) sometimes have an agreement with the FEDS which gives them control of some FED owned property. Was thinking that would be a great place for a large professionally designed, enclosed commuity dog park like the one at 17th Street, NW and New Hamshire Ave, NW in Dupont area. I realize that the CSX tunnel project will very likely affect about 10% of that parcel. Any info would be great. In the mean time, I'll keep snooping around. Thanks!


Glenn says: (10/13/10 5:23 PM)
Pre-work and a pile of rubble equals not construction.


JD says: (10/13/10 8:17 PM)
@Joe, I don't know anything about that triangle--you should probably contact Tommy Wells's office to see what they know, and if they could help.


MJM says: (10/13/10 10:58 PM)
What is your definition of construction? Just keep us posted on when it actually starts so I can avoid the street (2nd) that is under construction :)


Mark says: (10/14/10 8:40 AM)
As a CQ resident (even though I am not a dog owner) I love the idea of turning the triangle into a dog park!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

dcgent on I'm Dreaming of: Detroit-style pizza coming to undisclosed navy yard location https://dc.eater.c...
Westnorth on I'm Dreaming of: XO sauce is fish-based, as with many Cantonese sauces: https://en.wikipedia.org/...
NavyYardGuy on I'm Dreaming of: @hamburgular --I had the XO spaghetti last week too VERY fishy taste -- they sai...
Hamburglar on I'm Dreaming of: I took my wife over to try out ABC Pony for dinner. Be careful with the SPAGHET...
JD on I'm Dreaming of: And, has no one noticed the cool slideshows I've now added to the top of the hom...
RMP on Wednesday Tidbits: What's the deal with the makeshift front desk at Guild (a guy with a laptop at a...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1402 1ST ST SE   
11/25/19 
UNITED STATES OF AMERICA / DAVID C POSTLEWAITE
SB1900412 / CONSTRUCTION
Parcel G2:WSP will complete four borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). The proposed boring locations would be in the four quadrants of Parcel G2 to check for spatial variability in contaminant concentrations. WSP will collect and analyze three soil samples from each boring from depths corresponding to potential subgrade elevations (i.e. 10-12 ft. bgs, 20-22 ...
1212 4TH ST SE   
11/25/19 
FC 1212 LLC / TAMIKA STATON; OTIS
ER2000409 / SHOP DRAWING
Replace governor car #2 - Part #: TBA20641H6 Replace hoist belts #1 and #4 - Part #: SB0003119
1300 4TH ST SE   
11/15/19 
ASANA PARTNERS / DEBRA MARSHALL; THE DONOHOE COMPANIES INC
B2001773 / CONSTRUCTION
ADD EXTERIOR DOOR, ADD INTERIOR DOOR , ANY RELAYED,ELECTRICAL,PLUMBING, RELOCATING UNBUILT APPROVED NON LOAD BEARING FIRE RATED PARTITIONS @ FIRST FLOOR APPROVED UNDER PERMIT #B1711970. ATTACHED
300 M ST SE   
11/11/19 
FEDERAL CENTER LP / null
P2001215 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
11/15/19 
CSX TRANSPORTATION INC / ERICKA CLARK; DGS CONSTRUCTION
TC2000008 / CONSTRUCTION
(2) tower cranes
   
11/26/19 
GREYSTAR GP I I, LLC / KIM MITCHELL; KIM MITCHELL
FD1900040 / CONSTRUCTION
TWO BELOW GRADE PRKING LEVELS, CONCRETE FOUNDATION WALLS, SLAB ON GRADE, COLUMNS ELEVATED DECKS UP TO GRADE WITH UNDERGROUND UTILITIES (MECHANICAL, PLUMBING, ELECTRICAL)
   
12/05/19 
MIKE ALLEN / JANE MCCRAY
AH2000244 / CONSTRUCTION
WO# 1611441 - Mike Allen / P. Helgeson. Pepco to install network transformer
1111 NEW JERSEY AVE SE   
11/15/19 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / TANYA HILL; THYSSENKRUPP
ER2000366 / SHOP DRAWING
REPLACE EXISTING 8MM WORN HOIST CABLES WITH LIKE IN KIND ON ELEVATOR #4. WORK TO ALLOW UNIT TO BE RETURNED TO SERVICE.
1299 NEW JERSEY AVE SE   
11/12/19 
BROOKFIELD DEVELOPMENT / JUSTIN BELLOW
BP2000489 / POST CARD
125 O ST SE   
11/25/19 
DISTRICT OF COLUMBIA / DAVID C POSTLEWAITE
SB1900411 / CONSTRUCTION
WSP will complete three borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). WSP assumes that borings will not be installed inside the fleet maintenance facility due to access restrictions imposed by DC Water. The proposed boring locations form an ā€˜Lā€™ shape around the eastern and southern sides of the fleet maintenance facility. WSP will collect and analyze three soil samp...
201 TINGEY ST SE   
11/14/19 
BROOKFIELD PROPERTIES / DFM DEVELOPMENT SERVICES, LLC
AH2000197 / CONSTRUCTION
Afterhours work at Tingey Square Project. The work performed will be forming, prepping and paving at Tingey Square park. Friday and Saturday the 15th & 16th, from 7PM to midnight. If required, Sunday the 17th from 7AM to 3PM. ANC Support provided. Associated Permit Include PA328164-R1 and PA10760162.
227 TINGEY ST SE   
12/02/19 
FC 227 LLC / KAYLA SHATTUCK; BROOKFIELD PROPERTIES MANAGEMENT LLC.
RW1900122 / CONSTRUCTION
Construction of new retaining wall located between Canal Street St and Third Street, SE.
300 TINGEY ST SE   
12/04/19 
FC BOILERMAKER LLC / ROBERT S. WATTS; ROBERT S. WATTS
E2002289 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.