Since January, 2003

Ad by HillAds
 (a random before-and-after moment)
May 10, 2007
May 2, 2013
2nd (Mid) at I, Looking East (see more)

Tuesday morning at 10:30 am is the grand opening ceremony for the 5.5-acre Yards Park along the Anacostia River, and if you're planning on getting down there for Tuesday's event, or for some of the many weekend offerings, or just for a visit on your own (or if you've already sneaked a peek, like some people), take a moment to appreciate just what a change has come to this formerly barren spot by checking out the photos I took in August 2005 along Third and Fourth streets during a visit to what was at that time still the Southeast Federal Center.
You may be so new to the area that you don't even remember the days of the Lumber Shed's salmon-colored tin exterior, or Building 160 before the work started to turn it into the Foundry Lofts. But what I remember most about that quick visit five years ago (other than how hot and hazy and dusty it was) was thinking about how great it would be to be able to have such a big portion of riverfront available for people to visit and use, instead of having it hidden far behind a red brick wall and lots of cyclone fences. And, even though the site had been tidied up a bit (as shown in the photo below) by the time of the park's groundbreaking ceremony in May 2009, there's also a few photos in that bunch that you'll appreciate even more after you see what this stretch of waterfront has become.
(Don't worry, I'll be putting together a real before-and-after set, but I'm waiting until the park is officially opened, and mostly clear of construction workers and debris, before I create that gallery.)
Comments (0)
 
 More About Yards Park
 All posts: The Yards, Yards Park

JDLand.com Home

Comments

Misplaced says: (9/7/10 1:27 PM)
I know you weren't sure about this in your previous posts as well, but I figured I'd throw it out there:

Does this mean the Park will be officially open after 10:30am today? I'm going miss the opening weekend since I'll be out of town on vacation and was hoping to check it out before I left.



JD says: (9/7/10 1:44 PM)
I asked, and they're going to be closing the fences until Friday, because there is still some work going on.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Tell readers about your apartment/house/item
for two weeks for $5.
Someone's looking for
what you're selling!
List it here.
Recent Comments:  
JES on Homewood Suites/50 M: The trellises are kind of boring, but they're not deal-breaker ugly. The Zoning ...
JD on Homewood Suites/50 M: Thanks--an error left over from the days when I called it the L Hotel. I thin...
Edna on Homewood Suites/50 M: You mean the Hampton Inn is at 1st and N. I have to agree with the Zoning Commi...
JD on Homewood Suites/50 M: I think you've labeled it Forest City's development before, but that's incorrect...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
200 B/O L ST SE   THEFT F/AUTO /  07/30/14
L ST SE AND 2ND ST SE   THEFT F/AUTO /  07/30/14
70 B/O I ST SE   MOTOR VEHICLE THEFT /  07/29/14
70 B/O I ST SE   THEFT /  07/29/14
1100 B/O NEW JERSEY AVE SE   THEFT /  07/28/14
400 B/O K ST SE   THEFT /  07/24/14
1000 B/O 1ST ST SE   THEFT /  07/23/14
1600 B/O SOUTH CAPITOL ST   THEFT F/AUTO /  07/20/14
400 B/O M ST SE   BURGLARY /  07/20/14
70 B/O I ST SE   THEFT /  07/18/14
1300 B/O BOWYER ST SE   THEFT /  07/17/14
1500 B/O SOUTH CAPITOL ST   THEFT /  07/17/14
1100 B/O CUSHING PLACE SE   THEFT F/AUTO /  07/17/14
1400 B/O 1ST ST SE   THEFT /  07/16/14
1000 B/O 7TH ST SE   THEFT F/AUTO /  07/16/14
70 B/O I ST SE   THEFT /  07/15/14
16 B/O M ST SE   THEFT /  07/14/14
1000 B/O NEW JERSEY AVE SE   THEFT /  07/14/14
900 B/O NEW JERSEY AVE SE   THEFT F/AUTO /  07/13/14
400 B/O M ST SE   THEFT F/AUTO /  07/12/14
200 B/O VIRGINIA AVE SE   MOTOR VEHICLE THEFT /  07/10/14
900 B/O HALF ST SE   THEFT F/AUTO /  07/10/14
100 B/O M ST SE   THEFT /  07/09/14
4TH ST SE AND L ST SE   ROBBERY /  07/08/14
800 B/O POTOMAC AVE SE   THEFT /  07/07/14
300 B/O K ST SE   THEFT F/AUTO /  07/07/14
1100 B/O NEW JERSEY AVE SE   THEFT /  07/05/14
100 B/O L ST SE   THEFT F/AUTO /  07/04/14
1100 B/O 2ND PLACE SE   THEFT F/AUTO /  07/03/14
2ND PLACE SE AND I ST SE   THEFT F/AUTO /  07/02/14
70 B/O I ST SE   ROBBERY / GUN  07/02/14
200 B/O I ST SE   THEFT F/AUTO /  07/02/14

Active Public Space Permits Archive  
1011 1ST ST SE    Pepco Holdings Inc 
Issued
excavation; new  
 06/26/14
to
08/26/14
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
804 3RD ST SE    Maximiliano Villagra 
Issued
streetfixture; new  
 08/05/14
to
08/06/14
904 3RD ST SE    Janel Fitzhugh 
Issued
streetfixture; new  
 07/01/14
to
08/14/14
908 3RD ST SE    Rachel Frankel 
Issued
streetfixture; new  
 07/24/14
to
09/21/14
1026 3RD ST SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/26/14
to
09/04/14
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15
913 5TH ST SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/26/14
to
08/28/14
1100 - 1199 BLOCK 1ST ST SE    tom cash 
Issued
excavation; new  
 06/27/14
to
08/25/14
410 M ST SE    Pepco Holdings Inc 
Issued
excavation; new  
 07/11/14
to
09/08/14
800 NEW JERSEY AVE SE    Pepco Holdings Inc 
Issued
excavation; new  
 06/20/14
to
08/22/14
880 NEW JERSEY AVE SE    WASHINGTON GAS 
Issued
excavation; new  
 06/17/14
to
08/17/14
    WASHINGTON GAS 
Issued
excavation; new  
 07/28/14
to
09/26/14
1105 NEW JERSEY AVE SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/13/14
to
08/11/14
301 TINGEY ST SE    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1025 1ST ST SE   
07/26/14 
NA NA NA
EHOP1490737 / HOME OCCUPATION
1100 1ST ST SE   
07/15/14 
NA NA NA
EHOP1490710 / HOME OCCUPATION
1265 1ST ST SE   
07/29/14 
CAPITAL RIVERFRONT HOTEL LLC / JOHN HOMICK
E1407634 / SUPPLEMENTAL
   
07/30/14 
CAPITOL RIVERFRONT HOTEL LLC /
P1407417 / SUPPLEMENTAL
921 4TH ST SE   
07/29/14 
RICHARD AND MARGIT TRACEY / RICHARD AND MAR TRACEY
F1400538 / CONSTRUCTION
CUSTOM FABRICATED ORNAMENTAL IRON FENCE WITH GATE TO BE PAINTED BLACK INSTALLED PRIMED.
1212 4TH ST SE   
07/11/14 
FC 1212 LLC /
P1406926 / SUPPLEMENTAL
   
07/14/14 
MIKE LENARD / BHAR; W. SAKIE BHAR
SG1400363 / CONSTRUCTION
INSTALL ONE SET OF BUILDING SIGN ON TO EXISTING BUILDING
1103 9TH ST SE   
07/25/14 
ICP PARTNERS POTOMAC 810 LLC / TALBERT DOWLING
E1407537 / SUPPLEMENTAL
1220 12TH ST SE   
07/16/14 
FAIRBANKS MORSE ENGINE / EVAN O'BRIEN/ D MCKEEVER SERVICES
B1409041 / CONSTRUCTION
INTERIOR ALTERATION TO EXISTING 2578 SF OFFICE SPACE. AFFECTED AREA LESS THAN 1000 SF TO CREATE DEMISING WALL AND MINOR ALTERATIONS TO PARTITION PLAN IN CONFERENCE AREA. MECHANICAL AND ELECTRICAL WORK INCLUDED.
326 L ST SE   
07/17/14 
NA NA NA
EHOP1490715 / HOME OCCUPATION
55 M ST SE   
07/16/14 
HINES GLOBAL REIT 55 M STREET LLC / TYRAN D. BRANNUM
E1407255 / SUPPLEMENTAL
20 M ST SE   
07/17/14 
SOUTHEAST REALTY LLC / JOHN GIUSEPPE-RAMCO
TL1400132 / CONSTRUCTION
FIRST TIME TENANT BUILDOUT FOR FAST FOOD ESTABLISHMENT - SUBWAY SANDWICH SHOP SEATING 41 AS SHOWN ON THE ATTACHED ARCH. MECH. PLUMB. ELECT AND FIRE PROTECTION DWGS. INTERIOR WORK ONLY.
   
07/30/14 
JOHN GIUSEPPE-RAMCO / ALEXANDER KIM; JOHN GIUSEPPE-RAMCO; UWE NEUMANN
AR45710386 / SUPPLEMENTAL
55 M ST SE   
07/15/14 
HINES
B1409693 / CONSTRUCTION
INSTALL 6 AUTOMATIC DOOR OPERATORS LOCATED AT THE ELEVATOR LOBBIES BETWEEN THE 4TH-7TH FLOORS
100 M ST SE   
07/29/14 
SQUARE 743 INC. / SAM HOLLEN RAMCO OF DC INC.
TL1400149 / CONSTRUCTION
INTERIOR TENANT LAYOUT OF 4TH FLOOR OFFICE SPACE. PARTITIONS MEP AND LIFE SAFETY. 3 283 OF OFFICE SPACE ON 4TH FLOOR ONLY. NORTHWOOD SPEC SUITE
901 M ST SE   
07/15/14 
CARLTON RAY
AH1400584 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1201 M ST SE   
07/15/14 
CARLTON RAY
AH1400585 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
800 NEW JERSEY AVE SE   
07/14/14 
NEW JERSEY AT H LLC / COLIN CLARK
B1409654 / CONSTRUCTION
REVISION TO PERMIT #SH1400039 FOR A OWNERSHIP CHANGE
   
07/28/14 
WC SMITH CO. / COLIN CLARK
FD1400040 / CONSTRUCTION
FOOTINGS AND FOUNDATIONS TO GRADE FOR A FUTURE APARTMENT BUILDING
1000 NEW JERSEY AVE SE   
07/11/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / RICHARD G. FINFROCK
P1406902 / SUPPLEMENTAL
   
07/11/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / BRANDON K VIERNES
M1402531 / SUPPLEMENTAL
   
07/22/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / DONALD R. MCGLYNN
E1407426 / SUPPLEMENTAL
   
07/29/14 
JENNIFER MAY /
B1410235 / CONSTRUCTION
REPLACE EXISTING KITCHEN CABINETS WITH NEW CABINETS. CREATE A HALF WALL ON A NON LOAD BARING WALL. NEW LIGHTING.
   
07/29/14 
KOROUSH CHARKHABI
PC79044251 / POST CARD
REPLACEMENT OF NOT MORE THAN 1 PLUMBING FIXTURE ON A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
25 POTOMAC AVE SE   
07/29/14 
FLORIDA ROCK PROPERTIES INC / MITCH A. PERMUY
E1407629 / SUPPLEMENTAL
1236 SOUTH CAPITOL ST SE   
07/11/14 
1244 SOUTH CAPITOL RESIDENTIAL LLC / GEOCAPITOL ENGINEERING LLC
SB1400340 / CONSTRUCTION
WE PROPOSE DRILLING THREE SIX-INCH DIAMETER GEOTECHNICAL TEST BORINGS USING THE HOLLOW STEM AUGER METHOD TO EVALUATE THE SUBSURFACE CONDITIONS. THE PROPOSED TEST BORING DEPTHS WILL BE 80 FEET BELOW THE EXISTING GROUND SURFACE. DRILLING EQUIPMENT WILL BE DECONTAMINATED BETWEEN EACH HOLE TO AVOID CROSS CONTAMINATION THROUGHOUT THE SITE. UPON COMPLETION THE GEOTECHNICAL TEST BORINGS WILL BE BACKFILLE...
1244 SOUTH CAPITOL ST SE   
07/11/14 
1244 SOUTH CAPITOL RESIDENTIAL LLC / GEOCAPITOL ENGINEERING LLC
SB1400341 / CONSTRUCTION
WE PROPOSE DRILLING TWO SIX-INCH DIAMETER GEOTECHNICAL TEST BORINGS USING THE HOLLOW STEM AUGER METHOD TO EVALUATE THE SUBSURFACE CONDITIONS. THE PROPOSED TEST BORING DEPTHS WILL BE 80 FEET BELOW THE EXISTING GROUND SURFACE. DRILLING EQUIPMENT WILL BE DECONTAMINATED BETWEEN EACH HOLE TO AVOID CROSS CONTAMINATION THROUGHOUT THE SITE. UPON COMPLETION THE GEOTECHNICAL TEST BORINGS WILL BE BACKFILLED ...
300 TINGEY ST SE   
07/23/14 
CM-YARDS LLC / DWIGHT SMITH
B1408815 / CONSTRUCTION
INSTALL OUTSIDE SEATING SUMMER GARDEN.
   
07/30/14 
FC BOILERMAKER LLC / SHELBY FIGAROORE
P1407430 / SUPPLEMENTAL
201 TINGEY ST SE   
07/11/14 
JBG COMPANIES / GEORGE DELGADO
B1409541 / CONSTRUCTION
ONE DAY SPECIAL EVENT FOR BMW SHOW--150 OCCUPANTS EXTERNAL GENERATOR RESTROOMS AND LIGHTING BAY DOORS TO REMAIN OPEN DURING FUNCTION
   
07/22/14 
JBG/SEFC 170 LLC / MICHAEL B. BELL
E1407422 / SUPPLEMENTAL
300 TINGEY ST SE   
07/30/14 
FC BOILERMAKER LLC / NABIL MUKHAR
E1407660 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.