Since January, 2003

Ad by HillAds
 (a random before-and-after moment)
January 22, 2006
June 10, 2012
3rd Place at K, Looking West (see more)

The Usual Suspects gathered today at Second and M streets, SE, for Canal Park's ceremonial groundbreaking (at last). Mayor Fenty, Ward 6 council member Tommy Wells, Deputy Mayor Valerie Santos, Christopher Smith of W.C. Smith, and Chris Vanarsdale of the Canal Park Development Association each said a few words, with the words "school buses" being uttered a number of times as speakers talked about the previous life of these three blocks in the middle of Near Southeast. [The mayor even went off-script during his remarks to ask a startled neighborhood blogger how many photos of school buses are in the blog's archive; "about a thousand," came the response, which sounded flip but which is probably true.]
Here is a quick assemblage of photos from the event; if you want to know more about the park (or see old photos of school buses), my Canal Park project page is worth peeking at, as is the official Canal Park web site. Construction is expected to take 12-14 months, so look for the park to open in Fall of 2011.
For those who haven't been following along, Canal Park will stretch from I to M streets SE along the two parts of Second Street--some people may know this location as the open field across from Subway and Five Guys, about three blocks northeast of Nationals Park. The park has been designed to be a showcase of low-impact design and "green" features, including a sizeable stormwater management component. The southern block, across from the US Department of Transportation headquarters, will have a large plaza, a "significant water feature" that will transform into an ice skating rink in winter, and a large two-level pavilion that will be home to a cafe and observation area. The middle block has a rain garden, a children's play area, a small performance stage, and an open lawn. The northern block, the "most pastoral of the three," will have an open lawn, and the slight grade of the block as it slopes upward toward I Street has allowed the designers to envision this as an informal amphitheater, for events like summer movie nights and whatnot. There is also a "linear rain garden" that runs along the eastern edge of the park's three blocks. (Note that K and L streets will still be open to traffic, though there will be well-marked crosswalks.)
[PS: And, yes, I absconded with one of the shovels. But it was donated, not stolen!]
UPDATE: Here is the press release from the mayor's office on the project.
Comments (0)
 
 More About Canal Park
 All posts: Canal Park

JDLand.com Home

Comments

GW says: (8/31/10 12:36 PM)
"...so look for the park to open in Fall of..." *2011*


JD says: (8/31/10 12:37 PM)
Oops, thanks.


Richard says: (8/31/10 1:46 PM)
How about that shout out to the Blogger by
Mayor Fenty...and his use of Near Southeast in
his remarks!


JD says: (8/31/10 1:54 PM)
It will be a long, lonely, and ultimately fruitless crusade of mine to convince people that this neighborhood's name truly is Near Southeast. And yes, I did notice that the Mayor said it. :-)


Hillad says: (8/31/10 2:53 PM)
And what are all those poor dogs going to do in the evenings now?


MJM says: (8/31/10 4:56 PM)
Got an e-mail this morning - not too sure if it is true or not - on the VA Ave dog park. The was being planned for a while but if the e-mail is true, there is a fence up. Will check it out around 6 to see if it is true.


MJM says: (8/31/10 7:50 PM)
Yup, its a dog park, just waiting on the gates to be put in - supposedly by the end of the week. Its a good size area near the spay/neuter clinic.


Sophia Monster says: (9/1/10 3:01 PM)
Isn't this the 10th groundbreaking they've had for this park? Maybe I'm just thinking of other Near Southeast projects. In either case, they might want to start thinking about reusing some of those shovels.


JD says: (9/1/10 3:30 PM)
Nope, this is the only groundbreaking Canal Park has had. Back in 2007 they had a ceremony to honor a big check the city received from JBG Cos. to help fund both it and Diamond Teague Park.

Actual shovels-in-the-ground groundbreakings since I've been watching have been Nationals Park, Capper, Onyx/100 M, Yards Park, Diamond Teague Park, and now Canal Park.


JoeNDC says: (9/2/10 8:10 AM)
Why yes Sophia Monster, you are correct. They should reuse those shovels. In fact they were looking for an extra that was earmarked for their next groundbreaking. Alas, it disappeared. Rumor on the street from those in attendance said they saw a woman with a camera around her neck slowing, ever so quietly slinking away, stage right with what appeared to be a shovel. Strange, very strange indeed. Hmmmmm.:)

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
Chococar on Tidbits: I see the obstructionists are still trying to block the CSX tunnel. The narrow o...
Edna on Tidbits: Well said, JD, on Jair Lynch. What a bunch of developer nonsense-talk!
JES on Tidbits: Well, last time, we made a bit of a hasty exit..... who knows how the latter rou...
JD on Tidbits: I think that's how it ended up working out last time, that despite all the sturm...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O 10TH ST SE   THEFT F/AUTO /  09/08/14
400 B/O K ST SE   THEFT F/AUTO /  09/08/14
1000 B/O 4TH ST SE   THEFT F/AUTO /  09/05/14
300 B/O M ST SE   ROBBERY /  09/03/14
900 B/O 1ST ST SE   THEFT F/AUTO /  09/03/14
1000 B/O 1ST ST SE   THEFT /  09/03/14
1200 B/O 4TH ST SE   THEFT F/AUTO /  09/02/14
200 B/O M ST SE   THEFT /  09/02/14
300 B/O M ST SE   THEFT /  09/02/14
1100 B/O NEW JERSEY AVE SE   THEFT /  09/01/14
300 B/O K ST SE   THEFT F/AUTO /  08/31/14
1100 B/O 10TH ST SE   THEFT F/AUTO /  08/31/14
300 B/O I ST SE   MOTOR VEHICLE THEFT /  08/30/14
1400 B/O 1ST ST SE   THEFT /  08/29/14
300 B/O WATER ST SE   MOTOR VEHICLE THEFT /  08/27/14
3RD ST SE AND WATER ST SE   THEFT F/AUTO /  08/26/14
100 B/O K ST SE   THEFT F/AUTO /  08/25/14
400 B/O M ST SE   MOTOR VEHICLE THEFT /  08/23/14
1000 B/O NEW JERSEY AVE SE   THEFT /  08/22/14
200 B/O I ST SE   THEFT /  08/22/14
900 B/O HALF ST SE   MOTOR VEHICLE THEFT /  08/22/14

Active Public Space Permits Archive  
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
908 3RD ST SE    Rachel Frankel 
Issued
streetfixture; new  
 07/24/14
to
09/21/14
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15
880 NEW JERSEY AVE SE    WASHINGTON GAS 
Issued
excavation; new  
 07/28/14
to
09/26/14
301 TINGEY ST SE    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1011 1ST ST SE   
09/03/14 
TOLL DC LP / MILLENNIUM POOL
SP1400019 / CONSTRUCTION
INSTALL STAINLESS STEEL POOL ON ROOFTOP OF THE 13-FLOOR APARTMENT BUILDING.
1200 1ST ST SE   
09/05/14 
UNITED STATES OF AMERICA / FVI2020
EX1400033 / CONSTRUCTION
EXCAVATION SITE GRADING ONLY
1020 3RD ST SE   
09/03/14 
MAYIAK LLC / SMK AND ASSOCIATES LLC
B1411577 / CONSTRUCTION
REPAIR OR REPLACE IN KIND KITCHEN CABINETS TILE ON KITCHEN FLOORS. REPLACE FLOORS THROUGHOUT REPLACE BATHROOM VANITY TOILET TUB . PAINT EXTERIOR WINDOW LEDGES AND FRONT PORCH
1212 4TH ST SE   
09/09/14 
FC 1212 LLC /
FB1400131 / SUPPLEMENTAL
   
09/09/14 
FC 1212 LLC / WENDELL D. NIXON
M1403160 / SUPPLEMENTAL
1331 4TH ST SE   
09/09/14 
UNITED STATES OF AMERICA /
P1407907 / SUPPLEMENTAL
1103 9TH ST SE   
09/16/14 
ICP PARTNERS POTOMAC 810 LLC / FRANKLIN T GAINES
P1408621 / SUPPLEMENTAL
1220 12TH ST SE   
09/18/14 
WASHINGTON GAS LIGHT CO / GREGORY E LIGON
E1409179 / SUPPLEMENTAL
1200 13TH ST SE   
09/03/14 
WASHINGTON GAS LIGHT COMPANY / CHRIS WILLETT URS CORPORATION
SB1400412 / CONSTRUCTION
DCCR PROPOSES TO DRILL TWO GEOTECHNICAL BOARINGS MS-MW-02D & MS-MW-02S LOCATED AT 1200 13TH ST SE. BOTH BOARINGS WILL BE 6 INCHES IN DIAMETER 02D WILL BE 36 FEET DEEP WIOTH A 10 FOOT SCREENED INTERVAL STARTING AT 25 FEET DEEP AND 02S WILL BE 23 FEET DEEP WITH A 10 FOOT SCREENED INTERVAL STARTING AT 13 FEET DEEP. BOTH WILL BE DIRLLED WITH HOLLOW STEM AUGER. NO PERMANENT CASING WILL BE INSTALLED. SE...
   
09/03/14 
WASHINGTON GAS LIGHT COMPANY / CHRIS WILLETT URS CORPORATION
SB1400413 / CONSTRUCTION
DCCR PROPOSES TO DRILL ONE GEOTECHNICAL BORING MS-MW 01 LOCATED IN 1200 13TH ST SE. THE BORING WILL BE 6 INCHES IN DIAMETER AND 200 FEET BGS WITH A SCREENED INTERVAL FROM 135 TO 195 FEET BGS DRILLED BY MUD ROTARY. PERMANENT STELL CASING WILL INSTALLED AND BE SOCKETED 10 FEET INTO P / A AND GROUTED BEFORE DRILLING INTO THE PTX. MSDS FOR DRILLING MUD ADDITIVES ATTACHED. SEE IDW MANAGEMENT PLAN AND A...
1015 HALF ST SE   
09/04/14 
HALF ST SE LLC /
P1408319 / SUPPLEMENTAL
601 L ST SE   
09/02/14 
V ? V CONSTRUCTION / STEPHANIE DELCA TRAFFIC ENGINEERING SERVCIES LLC
TC1400023 / CONSTRUCTION
TO ERECT TOWER CRANE AS PER PLANS.
   
09/16/14 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / EDUARDO L. LOPEZ
E1409105 / SUPPLEMENTAL
   
09/18/14 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / RICHARD V CAREY
P1408678 / SUPPLEMENTAL
20 M ST SE   
09/08/14 
SOUTHEAST REALTY LLC / WESLEY R. DAVIS
E1408797 / SUPPLEMENTAL
55 M ST SE   
09/11/14 
HINES GLOBAL REIT 55 M STREET LLC / DANIEL O WHITE
E1408953 / SUPPLEMENTAL
100 M ST SE   
09/15/14 
SQUARE 743 INC. / SAM HOLLEN RAMCO OF DC INC.
TL1400150 / CONSTRUCTION
INTERIOR TENANT LAYOUT OF 6TH FLOOR OFFICE SPACE. PARTITIONS FURNITURE MEP AND LIFE SAFETY. REGUS 2429
901 M ST SE   
09/12/14 
CARLTON RAY
AH1400687 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1201 M ST SE   
09/12/14 
CARLTON RAY
AH1400686 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
0 N ST SE   
09/10/14 
SNALLYGASTER / ERIK BERGMAN
TN1400195 / CONSTRUCTION
SPECIAL EVENT SNALLYGASTER 1 10X40 TENT 1 20X90 TENT 2 20X160 TENT 1 30X15 STAGE TENT TEMPORARY GENERATOR
   
09/10/14 
DISTRICT OF COLUMBIA / JAMES A. WILLIAMS
E1408914 / SUPPLEMENTAL
800 NEW JERSEY AVE SE   
09/17/14 
NEW JERSEY AT H LLC / COLIN CLARK
B1408553 / CONSTRUCTION
CONSTRUCTION OF A 11 STORY 336 UNIT APARTMENT BUILDING WITH FIRST FLOOR RETAIL AND THREE BELOW GRADE LEVELS FOR PARKING GARAGE PER BZA # 18619 GRANTED ON 9 / 24 / 13 WITH CONDITION: SCREENING OF THE PARKING ADJACENT TO H ST.--- SPECIFICALLY SHEETS 6 AND 7 OF EXHIBIT 23 - PLANS TO INCLUDE MECHANICAL PLUMBING AND ELECTRICAL WORK.
25 POTOMAC AVE SE   
09/09/14 
GRIFFIN STEPHEN
PC60869040 / POST CARD
INSTALLATION OF 1 TEMPORARY CONSTRUCTION TRAILER ON PRIVATE PROPERTY.
1500 SOUTH CAPITOL ST SE   
09/09/14 
COMCAST CABLE / MICHAEL SONESEN
AH1400678 / CONSTRUCTION
PLACING INNERDUCT IN EXISITING VERIZON MANHOLES SEPTEMEBR 5TH 2014 - OCTOBER 5TH 2014 EVENINGS ? SATRUDAYS 7PM TO 2AM
300 TINGEY ST SE   
09/11/14 
FC BOILERMAKER LLC / CHRIS WING
B1407179 / CONSTRUCTION
INTERIOR ALTERATION FOR NEW UNLEASHED BY PETCO STORE.
   
09/05/14 
FC BOILERMAKER LLC
B1411671 / CONSTRUCTION
INSTALL FIRE SUPPRESSION SYSTEM TO EXHAUST HOOD.
   
09/13/14 
FC BOILERMAKER LIC FC BOILERMAKER LIC / DENNIS STUBBS; FC BOILERMAKER FC BOILERMAKER LIC; DENNIS STUBBS
P24303627 / SUPPLEMENTAL
   
09/18/14 
FC BOILERMAKER LLC /
P1408685 / SUPPLEMENTAL
   
09/18/14 
CHRIS WING / SHANDI COBB; CHRIS WING; CHARLES CLYNES
AR65033933 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.