Hasn't been much swirling around lately worthy of a full blog post, but here are a couple items so that people don't think I've shut down (though most of them have already been seen on my Twitter feed, aka the "I'm Too Lazy to Blog" feed): * The light tower at the Yards Park is being installed today, about four weeks in advance of the scheduled grand opening on Sept. 10. I hope to have pictures at some point. * Greater Greater Washington reports that MPD fanned out around Nationals Park on Wednesday night, ticketing drivers and pedestrians and handing out flyers on safety. GGW also brings up the public meeting held by Tommy Wells back in March about the notion of reworking M Street under the " Complete Streets" principles of creating road networks that work for pedestrians young and old, cyclists, public transportation users, and drivers. by doing things such as adding dedicated bike lanes, creating safer crosswalks, etc. At that meeting, residents of Southwest were unimpressed with the possibilities, but the few Southeast residents in attendance seemed more open to it. * While my griping about the bad signage on the SW Freeway ( highlighted again by the Post on Thursday) is technically out-of-boundaries, it is on topic to also mention to DDOT that the various blue "services" signs for the South Capitol Street exits on I-395 probably need to get rid of the gas station icons, since the days of having three gas stations right on South Capitol and two within a few blocks to the east are long gone. (But @DDOTDC has put me in a time out after Thursday's flurry of transit-related tweets, which also included this good suggestion from a reader about the need for a left-turn signal on northbound Third Street, SE at Virginia Avenue, for people needing to get onto I-395 southbound.) * And I stumbled across this study by the New America Foundation about "online-only" news outlets in DC. It counted 61 of them, noting that the "city's oldest local blogs that still command an audience began to spring up in 2003," with JDLand being one of the "original few," thanks to my January 2003 vintage. The piece looks at DCist, GGW, Prince of Petworth, And Now Anacostia, and TBD (though it hadn't yet launched), along with a few nice words about this site. But I have been thinking a lot lately about how I'm an old lady compared to the rest of the DC neighborhood blogosphere, and this article (coming on the heels of my [redacted] birthday) certainly reminded me of it. :-)
See All Current News Items
JC says: (8/13/10 8:19 PM)
A left turn arrow from 3rd onto 395 SB would be such an amazing improvement. I can't even begin to describe how much that one simple light would improve traffic flow through the neighborhood. It couldn't be easier as a daily user of this intersection to see this is needed. But DDOT will surely want to spend 6 months recording data and 6 months writing a report before any conclusion is formulated. I predict it will be installed one week before the road closures for the railroad tunnel construction.
AKR says: (8/14/10 8:48 AM)
RE: Left turn light. Aye! Start the study now and maybe CSX can pay for it. With redevelopment at 225 Virginia, I can only imagine it will be needed more. Plus they should allow street parking on only 1 side of 3rd street. It is far too narrow for 2way traffic AND 2way parking. With the tunnel there, the 2way traffic needs to continue.
MJM says: (8/14/10 6:22 PM)
The tower is up
Sophia Monster says: (8/15/10 9:28 AM)
I got curious about the other bloggers you mentioned to I went to take a look... it looks like the blogger from Anacostia actually just moved to JDLand - link
Kinda funny.
JW says: (8/15/10 10:28 AM)
Is there any new info on Van Ness School? I chatted with Tomy Wells recently and he said they are going to reopen the school.
JD says: (8/15/10 11:22 PM)
I haven't heard anything one way or the other on Van Ness, other than there's lots of talking going on about it, as there has been for a long time. Residents talking to DCPS, the Marines talking to DCPS about the school site (in terms of the Marines looking for a new barracks location), the DC Housing Authority talking to DCPS about co-locating the school and the long-delayed community center.... But there's been no public pronouncements.
Will says: (8/16/10 1:16 PM)
What's the deal with the closed gas stations? I apologize if this subject has been covered already. Thanks for the informative post.
JD says: (8/16/10 1:22 PM)
Hi Will--
Back before all the development started, there were four gas stations in Near Southeast, at South Capitol and I, South Capitol and N, Half and M, and 11th and M. (There was also a fifth one, across the street, on the west side of South Capitol and K, in Southwest.)
The Half and M and South Capitol and N station sites were bought by Monument Realty, and the stations closed. (They're now parking lots.) The other three--all Exxon stations--stopped operating, but they haven't been sold. Exxon has done some sleight of hand to move the ownership of the properties to their Exxon Foundation, maybe so that the foundation makes the money if and when the sites are sold.
I had fun back in the day with my Tracking Gas Prices at Half and M page, from 2003 to mid-2006:
link
Will says: (8/16/10 2:40 PM)
Thanks for the quick reply. It's too bad about all the gas stations closing. The hood sure could use one now. You are the BEST!
Add a Comment:
Comments are closed for this post.
JDLand Comments RSS Feed
See All Current News Items |
Full Blog Archive
|
|
|
Now updated for 2013!
JDLand.com's Official Unofficial Guide
Full Neighborhood Development Map
There's a lot more than just the projects listed here. See the complete map of completed, underway, and proposed projects all across the neighborhood.
Food Options, Now and Coming Soon
There's finally starting to be some new food options in the neighborhood. Click to see what's here, and what's coming.
What's New This Year A quick look at what's arrived or been announced since the end of the '12 baseball season.
Canal Park
Three-block park on the site of the old Washington Canal. Construction begun in spring 2011, opened Nov. 16, 2012. Park Tavern restaurant opened April 8, 2013.
Nationals Park
21-acre site, 41,000-seat ballpark, construction begun May 2006, Opening Day March 30, 2008.
Arthur Capper/Carrollsburg Mixed-Income Redevelopment
Hope VI-funded redevelopment of old public housing complex. 1,700 rental & ownership units, including 700 public housing units.
Capper Mixed-Income Apartment Building (Square 769)
171-unit apartment building along L Street between Second and Third. No timeline.
Capper Mixed-Income Apartment Building (Squares 768/767)
Two mixed-income buildings with more than 450 units planned for the blocks between 2nd and 3rd and I and L. No timeline.
Washington Navy Yard
Headquarters of the Naval District Washington, established in 1799.
US Department of Transportation Headquarters
11-acre site, 2 buildings, housing 7,000 Department of Transportation workers; construction begun early 2004, opened in April 2007.
Capitol Quarter
121 market-rate and 91 workforce-rate townhomes sold in phases; construction started June 2008, completed fall 2012. Project also includes 111 subsidized rental units and Section 8 ownership units.
11th Street Bridges
The three-year replacement of two new spans to replace the existing bridges across the Anacostia River began in 2009.
The Yards
44-acre mixed-use redevelopment of the old Southeast Federal Center. Expected to be completed in phases over 20 years.
The Yards
44-acre mixed-use redevelopment of the old Southeast Federal Center. Expected to be completed in phases over 20 years.
Yards Park
5.5-acre park on the banks of the Anacostia. First phase completed September 2010.
Yards Parcel N
325ish-unit residential building in planning stages on SW corner of 4th and Tingey. Could get underway in 2013.
Lumber Shed at the Yards Park
Transformation of old Lumber Shed in Yards Park into a retail space, including Osteria Morini. Expected completion fall 2013.
Foundry Lofts (The Yards)
Renovation of Historic Pattern Joiner Shop into 170 units, with ground-floor retail; rehab begun in 2008, first move-ins Nov. 2011.
Boilermaker Shops (The Yards)
Historic Boiler Maker's Shop being renovated into 46,000-sq-ft of retail space; first restaurants expected to open in early 2013.
Twelve12 (The Yards)
220ish-unit apartment building, with a ground-floor Harris Teeter, three-story Vida Fitness center/spa, and Sweetgreen. Construction started Dec. 2011, to be completed mid 2014.
Factory 202 (The Yards)
The old Broadside Mount Shop will be renovated as a 270-unit condo building. No current timeline.
Marine Bachelor Enlisted Quarters
Completed 2004.
600 M Street
Longtime site of Capper Seniors building until its demolition in November 2007, this site is now a temporary parking lot. Eventual plans call for a 500,000-sq-ft office project.
601 L Street
New apartment building planned for the northern portion of the old Capper Seniors lot along L Street. No timelime for the start of construction.
Maritime Plaza
Two office buildings, totaling 345,000 sq ft, completed in 2001 and 2003. Additional future plans could include 350,000 sq ft additional office space and a hotel (no timeline).
Community Center
A new building replacing the old center, with day care, a rec center, gym, computer lab, and more. Could start in 2014.
Capper Seniors #1
New 160-unit building for low-income seniors; construction begun March 2005, completed December 2006.
400 M Street
New 138-unit building with units for both low-income seniors and workforce-level earners; construction begun December 2005, opened November 2007. Wrapped around existing 410 M seniors building.
Van Ness Elementary School
DC Public School, closed in 2006, but with the possibility of reopening for the 2015 school year.
250 M Street
Proposed 190,000 sq ft office building by William C. Smith with ground-floor retail; no timeline. Part of Capper/Carrollsburg PUD.
225 Virginia/200 I
Once a printing plant for the Star and the Post, the building was rehabbed by the DC Government and Stonebridge Carras to house four DC agencies. Reopened in fall 2012.
Park Chelsea 880 New Jersey
430-unit apartment building called Park Chelsea, 1st phase of four building, 1 million-sq-ft residential project by William C. Smith. Started fall 2012, delivery expected late 2014.
Trash Transfer Station (Capper)
Longtime home to trash and public works operations, this will eventually be a 400-unit mixed-income apartment building as part of the Capper/Carrollsburg redevelopment. No timeline.
Jefferson and Axiom Apts. 70/100 I Street
Two buildings totalling 700 residential units; construction begun Sept. 2006, first move-ins began summer 2008. Developed by JPI, sold in 2012.
909 New Jersey
237-unit residential tower with 6,000 sq ft retail on the site of the old Nexus Gold Club; construction underway June 2007, delivered 2009. Developed by JPI, sold in 2012.
Congressional Square Square 696
Block purchased for $69.4 million in April 2007; 825,000-sq-ft office/retail project planned in three phases. No recent announcement on start date.
909 Half Street
Planned 400-unit residential building by Ruben Cos. No timeline.
1015 Half Street
The old Nation nightclub site, now a 411,000-sq-ft office building with ground floor detail; begun January 2008 by Opus East, halted July 2009, completed by Douglas Wilson Cos. spring 2011.
Velocity Condos 1025 1st Street
200-unit condo building developed by Cohen Companies. Construction begun July 2007, delivered late 2009. Justin's Cafe in ground floor.
Toll Brothers Site
Toll Brothers purchased lot just north of Velocity in 2012 for 250-unit residential building. No timeline.
Toll Brothers Site 2
Second site purchased by Toll Brothers in 2012 for a residential building. No details, no timeline.
Courtyard by Marriott 140 L Street
200-room Courtyard by Marriott Hotel, completed in 2006.
Capitol Hill Tower 1000 New Jersey Ave.
340-unit residential coop tower, completed in 2006.
1111 New Jersey Avenue
Plans by Donohoe Companies for 200,000 sq ft office building could switch to residential. No timeline. Site footprint to include St. Matthew's Baptist Church.
Onyx on First 1100 1st Street
14-story, 260-unit apartment building by Faison/Canyon-Johnson. construction begun Sept. 2006, first move-ins started October 2009. Sold to ERP in 2012.
100 M Street
240,000-sq-ft office building, with ground-floor retail; construction begun Sept. 2006, delivery late 2008. Developed by Opus East. Retail tenants: Gordon Biersch (opened April 2013), SunTrust.
20 M Street
190,000-sq-ft office building from Lerner Enterprises, construction begun Aug. 2005, completed spring 2007. Retail tenant: Wells Fargo.
SC1100 1100 South Capitol Street
A 350,000-sq-ft office by Ruben Cos. project planned for 1100 South Capitol Street. No timeline for the start of construction.
1000 South Capitol Street
Proposed 320,000-sq-ft office building by Lerner Enterprises; no timeline. A surface parking lot was built on this site in early 2008.
Akridge Half Street
Old WMATA bus garage bought by Akridge in Aug. 2008 for $46.5 million. Plans for 700,000-sq-ft of mixed use; currently home to Fairgrounds.
Monument Half Street Residential/Hotel
The southern half of Monument's block on Half Street has long had plans for a hotel and two residential buildings. No timeline.
55 M Street
275,000-sq-ft office building on top of Navy Yard Metro west station entrance; construction begun in early 2007, completed spring 2009. Retail tenant: Bank of America.
Monument South Capitol Residential
Monument Realty may be starting to move forward on plans for a 185-unit residential building on the northeast corner of South Capitol and N, but no timeline is announced.
One M Street
328,000-sq-ft office building proposed by Monument Realty for southeast corner of South Capitol and M. No timeline.
Square 701
Planning started by Grosvenor and Skanska in 2012 for separate office/hotel/residential buildings with ground-floor retail. No timeline.
DC Water
Still a functioning water-treatment facility, and includes the historically designated Main Pumping Station building.
Diamond Teague Park and Piers
39,000-sq-ft public plaza and water taxi dock on the banks of the Anacostia, next to the old pumphouse occupied by the Earth Conservation Corps; first phase completed 2009.
RiverFront on the Anacostia (Florida Rock)
5.8-acre site, 1.1 million sq ft project, 4 buildings: 2 residential, 1 office, 1 hotel, retail. First phase could begin in 2013.
RiverFront on the Anacostia (Florida Rock)
5.8-acre site, 1.1 million sq ft project, 4 buildings: 2 residential, 1 office, 1 hotel, retail. First phase could begin in 2013.
WMATA Navy Yard Chiller Site
14,100-sq-ft lot, WMATA's development talks with Donatelli Development called off in Summer, 2010.
National Community Church Site
A series of small lots bought by the National Community Church in 2010 and 2011 with the intent of building a combination coffee-house/performance space/offices. No timeline.
New South Capitol Street Bridge
Planning is underway to replace the current Frederick Douglass Bridge. No timeline for construction.
Anacostia Riverwalk
A bridge between Teague and Yards Parks is part of the planned 20-mile Anacostia Riverwalk multi-use trail along the east and west banks of the Anacostia River.
Virginia Ave. Tunnel Expansion
Designs are pending to expand the 106-year-old tunnel to allow for a second track and double-height cars.
Rail and Bus Times
Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Rail and Bus Times
Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
50 M Street
130,000-sq-ft office building on the site of the old Sunoco station. In development by Monument Realty, no timeline for construction.
Blue Castle
Old trolley garage/car barn at 770 M Street, now home to charter schools. Eventually to be renovated as a retail space.
Washington Capital Area Spay and Neuter Clinic
Opened in October 2007, provides low-cost spay and neuter services to clinics and shelters around the metro area.
900 M Street
900 M Street, an old Hudson auto dealer, later a dialysis unit, renovated in 2008 for retail space. Domino's and Wagtime current occupants.
300 M Street
300,000-sq-ft office building, completed 2001. Sizzlin' Express deli on ground floor.
80 M Street
275,000-sq-ft office building on the site of the old Tracks nightclub. Completed 2001.
Federal Gateway 1100 New Jersey Avenue
297,000-sq-ft office building, completed 2004. Ground-floor retail includes Five Guys, Subway, CVS, and Capital One Bank.
50 M Street
130,000-sq-ft office building on the site of the old Sunoco station. In development by Monument Realty, no timeline for construction.
Southeast Blvd.
A 20-month project to convert the eastern part of the SE Freeway to a boulevard that intersects at-grade with 11th Street. Expected completion in 2015.
Apparently link just doesn't have the bandwidth to deal with everyone's interest. Literally. link (12:03 PM 6/11) Hey @wmata or Architect/Capitol, how about some hedge trimming by Capitol South? Even worse in rain. link (10:17 AM 6/11)
|
|
Recent Registered Reader Comments:
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.
|
|
|
| UNIT B/O N ST SE
|
| THEFT
/
| 06/04/13
|
| 1500 B/O SOUTH CAPITOL ST
|
| THEFT
/
| 06/04/13
|
| 70 B/O I ST SE
|
| THEFT F/AUTO
/
| 06/03/13
|
| 2ND ST SE AND K ST SE
|
| ROBBERY
/ GUN
| 06/02/13
|
| 700 B/O M ST SE
|
| THEFT
/
| 05/31/13
|
| 70 B/O I ST SE
|
| THEFT
/
| 05/31/13
|
| 1100 B/O 1ST ST SE
|
| THEFT
/
| 05/31/13
|
| 54 B/O M ST SE
|
| ROBBERY
/
| 05/30/13
|
| 1100 B/O NEW JERSEY AVE SE
|
| THEFT
/
| 05/30/13
|
| 4TH ST SE AND M ST SE
|
| THEFT F/AUTO
/
| 05/28/13
|
| 1300 B/O M ST SE
|
| THEFT
/
| 05/28/13
|
| 900 B/O 5TH ST SE
|
| THEFT
/
| 05/27/13
|
| 300 B/O WATER ST SE
|
| THEFT
/
| 05/25/13
|
| 1100 B/O 4TH ST SE
|
| THEFT F/AUTO
/
| 05/24/13
|
| UNIT B/O L ST SE
|
| THEFT F/AUTO
/
| 05/21/13
|
|
|
Active Public Space Permits
| Archive
|
|
|
1011 1ST ST SE
|
|
COLIN CLARK Pending
excavation; new
| 03/03/14 to 05/01/14
|
|
|
|
COLIN CLARK Approved (Pending Payment)
paving; landscaping; new
| 04/23/14 to 06/27/14
|
|
815 4TH ST SE
|
|
Comcast Cable Assigned
excavation
| 05/06/13 to 07/05/13
|
|
1101 4TH ST SE
|
|
Comcast Cable Assigned
excavation
| 05/06/13 to 07/05/13
|
|
1200 - 1299 BLOCK HALF ST SE
|
|
Washington Nationals Issued
streetfixture; new
| 08/24/12 to 08/15/13
|
|
200 - 299 BLOCK TINGEY ST SE
|
|
Northeast Remsco Construction Incorporated Pending
paving; excavation; new
| 01/01/13 to 12/31/13
|
|
200 - 299 BLOCK VIRGINIA AVE SE
|
|
Phil Sheridan Issued
excavation; new
| 05/20/13 to 07/18/13
|
|
909 HALF ST SE
|
|
Ruben Companies Ruben Companies Pending Document
excavation
| 03/01/13 to 09/01/13
|
|
23 I ST SE
|
|
23 I LLC c/o Ruben Companies Pending
paving; new
| 11/30/12 to 11/29/13
|
|
200 I ST SE
|
|
Todd Stone Pending
streetfixture; new
| 11/21/12 to 11/22/13
|
|
17 M ST SE
|
|
1015 HALF STREET SE LLC Pending
excavation; new
| 07/23/12 to 07/22/13
|
|
100 M ST SE
|
|
Gordon Biersch Restaurant And Brewery Pending
new
| 01/07/13 to 06/30/13
|
|
|
|
WASHINGTON GAS Issued
excavation; new
| 05/06/13 to 07/04/13
|
|
|
|
WASHINGTON GAS Assigned
excavation
| 04/23/13 to 04/22/14
|
|
401 M ST SE
|
|
cris FLACK Issued
excavation; new
| 04/22/13 to 06/20/13
|
|
900 M ST SE
|
|
Corman Construction Issued
excavation; new
| 09/11/12 to 09/10/13
|
|
922 M ST SE
|
|
Wash Gas & Light Co. Issued
excavation; new
| 04/30/13 to 06/28/13
|
|
1201 M ST SE
|
|
Michael Manoski Pending Document
excavation
| 05/06/13 to 05/05/14
|
|
1333 M ST SE
|
|
WASHINGTON GAS Assigned
excavation
| 05/01/13 to 04/30/14
|
|
1500 M ST SE
|
|
DC Water Pending
excavation; new
| 02/15/13 to 07/30/13
|
|
1111 NEW JERSEY AVE SE
|
|
NJA Associates LLC Assigned
paving; streetfixture; landscaping; excavation; new
| 06/03/13 to 06/02/14
|
|
125 O ST SE
|
|
TRAYLOR/SLANSKA/JAY DEE JOINT VENTURE(DAMIAN RUPPERT) Issued
paving; streetfixture; new
| 12/24/12 to 12/23/13
|
|
300 TINGEY ST SE
|
|
Northeast Remsco Construction Incorporated Pending
paving; excavation; new
| 12/14/12 to 12/13/13
|
|
301 TINGEY ST SE
|
|
Potbelly Sandwich Works LLC Issued
new
| 03/21/12 to 11/27/14
|
|
401 TINGEY ST SE
|
|
Northeast Remsco Construction Incorporated Pending
new
| 02/18/13 to 08/31/13
|
|
601 VIRGINIA AVE SE
|
|
Wash Gas & Light Co. Issued
excavation; new
| 04/30/13 to 06/28/13
|
|
301 WATER ST SE
|
|
Wash Gas & Light Co. Assigned
excavation
| 04/19/13 to 11/30/13
|
|
|
Recent Issued Building Permits
| Archive
|
|
|
926 3RD ST SE
|
|
06/06/13
WILLIAM SHIVELY / DAVID FONTANA MCKEEVER SERVICES CORP.
NON STRUCTURAL FRAMING MODIFICATIONS AND FOOR VENT MODIFICATION.
|
|
1015 3RD PL SE
|
|
05/30/13
CHEN / ASTRUM SOLAR
INSTALLATION OF A GRID-TIED 12-PANEL SOLAR SYSTEM ON ROOF OF HOUSE.
|
|
|
|
05/30/13
KEITH C CHEN / JOHN A. TETI
|
|
1112 3RD ST SE
|
|
INSTALL A WROUGHT IRON FENCE IDENTICAL TO THE NEIGHBORS FENCE WITH A GATE. THIS WORK HAS BEEN APPROVED BY THE ARCHITECTURE REVIEW BOARD OF THE HOMEOWNERS ASSOCIATION
|
|
770 M ST SE
|
|
06/11/13
MADISON 770 M STREET LLC / JOHN W. HYRE
|
|
|
|
06/12/13
MADISON 770 M STREET LLC / RALPH THREATT
|
|
1201 M ST SE
|
|
05/30/13
WASHINGTON GAS LIGHT CO / CARLOS MONTES
|
|
|
|
06/08/13
JEFFREY KNIGHT / JEFFREY KNIGHT; JEFFREY KNIGHT; JOHN WEEKS
|
|
|
|
06/12/13
CARLTON RAY / MICHAEL MANOSKI
PERFORM TEMPORARY LANE CLOSURES
|
|
880 NEW JERSEY AVE SE
|
|
06/07/13
880 NEW JERSEY AVENUE LLC / WILLIAM C SMITH + CO
WORK FROM 7PM TO 7AM TO INSTALL NEW SEWER UTILITY THIS PERMIT IS ONLY GOOD FOR THE DATES OF 6 / 11 / 2013 & 6 / 12 / 2012
|
|
|
|
06/13/13
880 NEW JERSEY AVENUE LLC / JOHN H THOMSON
|
|
1100 NEW JERSEY AVE SE
|
|
06/07/13
SQUARE 742 LIC / JIM CALABRESE
THIRD AND FINAL EXTENSION TO AN1100087 TO EXPIRE 9 / 03 / 2013.
|
|
300 TINGEY ST SE
|
|
06/05/13
FC BOILERMAKER LLC / FRANK V CANTWELL
|
|
|
|
05/31/13
FC BOILERMAKER LLC /
|
|
|
|
06/06/13
JOE SPINNELL / GEORGE HOCKADAY-BEY; JOE SPINNELL; GEORGE HOCKADAY-BEY
|
|
|
|
06/10/13
FOREST CITY / MG PERMITS GARY BRENT
NEW TENANT ALTERATION FOR GNC TO INCLUDE M.E.P.
|
|
|
|
06/10/13
FOREST CITY WASHINGTON / FOREST CITY WASHINGTON; MG PERMITS GARY BRENT
INSTALL 3 WALL SIGNS
|
|
301 WATER ST SE
|
|
06/05/13
THE DISTRICT OF COLUMBIA / AMANDA GANGINIS / WILL TEASS
INTERIOR ALTERATIONS OF EXISTING CORE AND SHELL SPACE INCLUDING NEW INTERIOR DOORS INTERIOR PARTITIONS EXTERIOR LOUVERS AND TOILET ROOMS. MECHANICAL ELECTRICAL AND PLUMBING WORK IS LIMITED TO COMMON AREAS AND TEMPORARY HEATING AND LIGHTING FOR TENANT SPACES. WORK IN TENANT SPACES SHALL BE PERFORMED UNDER A SEPARATE PERMIT.
THIRD PARTY PLAN REVIEW: TPR13-0002-13-21
|
|
|
|
06/07/13
FOREST CITY / FVI 2020
RESTAURANT WITH 156 SEATS AND 196 OCCUPANTS ON THE FIRST FLOOR INTERIOR WORK ONLY
|
|
|
|
06/10/13
FC LUMBER SHED LLC / DOMINIC E TOTARO
|
|
|
|
06/13/13
FC LUMBER SHED LLC / RICHARD V CAREY
|
|
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;
|
|
|
|
| No commercial transaction records added or modified in the past two weeks. |
Top of Page | Contact JD | Advertise on JDLand
Near Southeast RSS Feed
© Copyright 2013 JD.
All photos © Copyright JD - See information on photo uses, licensing and purchasing.
|
| |