Since January, 2003
            
 (a random before-and-after moment)
June 27, 2005
June 4, 2017
1st at O, Looking South-Southwest (see more)

I've been chroncling over the past few months the Marine Corps' search for a spot for a new barracks, which has focused on a number of sites in Near Southeast, including the block bounded by Fifth, Seventh, L and M just south of their newest barracks that used to be home to the old Capper Seniors apartment building. It's been clear in public meetings and various other rumblings that both city planning officials and the DC Housing Authority are very much against the Marines using this site, with plans having been in place for a number of years for this now-empty/parking-lot block to become home to both a 600,000-square-foot office building and a 189-unit mixed-income apartment building (shown above) as part of the Capper/Carrollsburg redevelopment.
Clearly feeling that the Marines haven't given up on the site as an option despite these plans, DCHA has now sent the Marines a letter officially requesting that the Corps "not continue to propose redevelopment options on the DCHA-owned Square 882 as a future site for its facility needs." The letter explains that DCHA has already secured funds to improve the infrastructure around the square, has spent "substantial predevelopment funds" on design and engineering drawings, and is anticipating beginning work on the residential portion of the site in October. (There's currently no timetable for the office portion.) Further, DCHA says it "recently received an invitation from HUD to submit an application for a FHA loan guarantee to support the planned residential construction on the site," and that this construction is expected to start "this winter."
Nothing in the letter is necessarily a surprise--I've written fairly extensively about DCHA's plans and about the zoning travails they went through before getting a second-stage PUD approval for Square 882 last year, which even included many discussions and agreements with both the Marines and the Navy about security requirements for the new buildings on this block. But clearly DCHA is hoping to be completely removed from the Marines' list of potential sites in the same way that the DC Public Schools (and parents) got Tyler Elementary removed from consideration. But it's also clear from the public workshops that the Marines very much like what Square 882 has to offer them in terms of space and proximity to the other USMC operations in the area.
The Marines are hoping to make a decision on a site by September. You can see all the sites under consideration and the various options on the "Community Integrated Master Plan" web site.
Comments (14)
   
 
 More About The Bixby

JDLand.com Home

Comments

MJM says: (5/28/10 8:33 AM)
That's great news for a Friday! Hopefully the community garden, Dog-Ma and the residences/businesses (jobs/homes) in that lower 8th St area will be saved too.


NavyYard says: (5/28/10 9:00 AM)
So, we wait another 10 years for DCHA to maybe come up with the money or we allow someone with ample resources who is ready to develop this sorely underdeveloped neighborhood immediately. Hmmm, I choose the Marines.


JD says: (5/28/10 9:07 AM)
MJM--I think you;re thinking of the area over around 9th Street and the Virginia Avenue Park. This area that DCHA owns is where the Nats parking lot W currently is, at 7th and M.

NavyYard--planning to start vertical construction "this winter" isn't quite 10 years. (I'm not a big fan of hyperbole--all opinions are fine around here as long as they are fact-based)


MJM says: (5/28/10 9:20 AM)
JD - exactly - two sep areas but they are looking at that area too (9th St) - that area needs to be saved too but don't think they haev the help/support of DC to protect that area. There are homes, jobs and a sense of community (garden) that would be lost in that 9th St area that would never be replaced if the barracks are moved into that area (because the only jobs created there would be temp construction jobs).


JD says: (5/28/10 9:24 AM)
MJM, oh I see, in my morning haze I missed the sentence construction. :-)


JD2 says: (5/28/10 9:51 AM)
So do we really need more office space over there? And the Marines would be just awful tenants too, huh? (rhetorical question) With what seems like a spike in crime lately in our neighborhood, I'd love to see them move over there. And frankly, I'll believe that the DC govt. will start construction when I see it. They are not what I would call a reliable entity.


Scott says: (5/28/10 10:05 AM)
At least a parking lot offers the POSSIBILITY of bringing something in the future that integrates the community and injects spending capital that will attract restaurants and businesses.

Filling up a huge block of space with a walled-off, somewhat insulated structure, filled with residents who probably spend a lot of the little spending money they get on base, isn't seen as the ideal long-term solution for a lot of us.

Mark me down for full-time residents and office workers who can support sit-down restaurants, coffeeshops, florists, pet shops, salons and all the other various types of businesses that would not be attracted by another enlisted barracks.


Scott says: (5/28/10 10:17 AM)
Why is the response to people not wanting a barracks always "what, you don't like Marines?"

Look, I like the Marines and I'm extremely appreciative of what they do for our country. That has nothing to do with this issue.

This neighborhood is growing regardless, the full-time population has doubled in the last 18 months and will continue to grow. The number of officeworkers will continue to grow with all the new leases being signed.

You can't just shout down detractors. So please tell me what a new Marines barracks will actually ADD to the community?

All I can see at this moment is that it will subtracts 189 housing units and 600,000 feet of office space filled with people who will inject far more money into neighborhood businesses that enlisted marines will.


JD2 says: (5/28/10 10:29 AM)
I'll take public safety and fewer bureaucrats over congestion and commuters speeding through the neighborhood any day.


MJM says: (5/28/10 10:50 AM)
Security? Marines do not equal police offices - some law or something that goes back to the civil war time or so I've heard.

This giant monstrosity ringed by a 9ft fence will only block off roads and does not make an open community and only takes away.

When you stroll down Barracks Row from the Eastern Market metro look at how businesses change (or lack of except those that cater to the Marines) as you get into the heart of the barracks. Granted it is further away from the metro but after 200 years of being in that area it hasn't done much for the community. I'd rather take office workers, private jobs (Port City Cafe, Dog-Ma, etc), and homes/families over barracks.

I've said my piece more than enough but I will state again that my free beer for a year offer stands to the first person who can point out the last time they saw a non-Navy Exchange shop (something like Justins) on the ground level of a military barrack. Because that is what you won't get with the barrack but will get with the apartment/Square 882 if zoned for that type of business.


patrick says: (5/28/10 10:53 AM)
Yet we all know what the best answer would be and DCHA won't permit that either. The marines like Potomac Gardens, but they were told by DCHA not to consider it. Initially, DCHA says that the marines didn't want it, but when pressed they DCHA said that they weren't offered enough money by the marines.


CAPT Hill says: (6/1/10 8:33 AM)
DCHA made a mistake here as far as the future of our community is concerned. The track record of DCHA's tenants v. the Marines is clear. Moreover, I would like to see L Street closed to traffic - we have far, far too many suburbanite commuters who speed down L Street in order to avoid the lights on M.


Sophia Monster says: (6/1/10 1:38 PM)
I love those renderings, but are those palm trees?


BBC says: (6/2/10 6:07 PM)
How can "I don't want more Marines living near me" be interpreted as anything other than anti-Marine? These are sad days for the community. Marines are not a police force, but just their presence makes this area more safe than it would have been. But greater than that, I am sick and tired of each community basically giving them the middle finger. These young men and women sacrifice so much for us. It is shameful when they come to us for living quarters and these communities say "go live someplace else, not near me." At least I was able to show up at a couple of the meeting to let them know that I support their search and I would have been proud to call more of these marines my neighbor!!!

...Also, the current barracks is more beautiful than any office building around here. The black iron fence also looks very nice ...despite many repeated attempts to portray it otherwise. Their opening of their soccer field to community children (and cheering parents) makes it more open and accessible than private residences/offices.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts
  

Brich on Recent-Tidbit Roundup, And: I pray to God that Willie's closes. It is the biggest waste of prime real estate...
RMP on Watching the Neighborhood: Election Day got off to a rocky start at the community center. They didn't start...
JES on Watching the Neighborhood: This is awesome. I wonder what a similar post looking up Half from the CF gate w...
RMP on Watching the Neighborhood: This is amazing. Thank you for all the hard work over the years to make this pos...
conngs0 on Watching the Neighborhood: Remarkable! It's been a pretty amazing transformation over the years even from ...
Gamble Rogers on Watching the Neighborhood: This is amazing work, JD.
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O VIRGINIA AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/18/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/16/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/11/18
1100 B/O 8TH ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/10/18
UNIT B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/09/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/06/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/29/18
1000 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/28/18
1100 B/O 10TH ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/26/18
1100 B/O 9TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/25/18
UNIT B/O I ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/25/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/22/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/21/18

Recent Issued Building Permits Archive  
1018 3RD ST SE   
06/06/18 
DAVID A LEINER / SCOTT STERL
F1800474 / CONSTRUCTION
REPLACEMENT OF AN EXISTING CHAIN LINK FENCE TO A WOODEN FENCE 6FT. TALL.
1212 4TH ST SE   
06/06/18 
null / THAIS NA PEACHER
EHOP18924304 / HOME OCCUPATION
101 H ST SE   
05/23/18 
SQUARE 737 LLC / null
P1806213 / SUPPLEMENTAL
   
06/05/18 
SQUARE 737 LLC / JOHN SONNER 4438727277
E1807389 / SUPPLEMENTAL
   
06/06/18 
SQUARE 737 LLC / null
P1806501 / SUPPLEMENTAL
2 I ST SE   
05/31/18 
CRESCENT CAPITOL VIEW / null
E1807278 / SUPPLEMENTAL
   
05/23/18 
CRESCENT CAPITAL VIEW, LLC / ERICKA CLARK
TC1800034 / CONSTRUCTION
Renewal of tower crane permit #TC1700022 EXTENSION WILL EXPIRE ON 11 / 23 / 2018
202 M ST SE   
05/29/18 
null
E1807211 / SUPPLEMENTAL
   
05/29/18 
null
P1806323 / SUPPLEMENTAL
100 M ST SE   
06/05/18 
SQUARE 743 INC / ROBERT L HUNTER 703-404-0303
M1802631 / SUPPLEMENTAL
202 M ST SE   
05/31/18 
UNITED STATES OF AMERICA / null
P1806387 / SUPPLEMENTAL
300 M ST SE   
05/25/18 
FEDERAL CENTER LP / GARY BRENT; CARLOS DIAZ
SG1800308 / CONSTRUCTION
Install 2 illuminated wall signs and 1 temporary Banner - Sprint
   
06/01/18 
FEDERAL CENTER LP / SAM HOLLEN
B1809520 / CONSTRUCTION
INTERIOR RENOVATION TO 8TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING OR STRUCTURAL. 860 SQUARE FEET. STRATEGIC INSIGHT
410 M ST SE   
05/30/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / SCOTT NICHOLS
AN1800023 / CONSTRUCTION
AT&T proposes to add three new antennas to an existing rooftop telecommunications facility.
800 NEW JERSEY AVE SE   
05/24/18 
SQUARE 737 LLC / null
P1806243 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
05/23/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION INC.
AH1800974 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities. **TO EXCLUDE LEGAL HOLIDAYS**
1115 NEW JERSEY AVE SE   
06/07/18 
DONOHOE REAS ESTATE SERVICES / null
E1807467 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE 20003   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807687 / SUPPLEMENTAL
   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807698 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
06/12/18 
GALLERY CAPITOL WATERFRONT PROPERTY LLC / null
P1806653 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
06/12/18 
SQUARE 742 LLC / CLIFFORD DIXON
B1807730 / CONSTRUCTION
REVISION: REVISE B1804348 5TH FLOOR OFFICE SPACE TO EXTEND THE OFFICE INTO ADDITIONAL SPACE TO CREATE A LARGER OPEN OFFICE
71 POTOMAC AVE SE   
05/30/18 
FORIDA ROCK PROPERTIES INC / ANKIT K SINGH
UT1800044 / CONSTRUCTION
Removal of an Underground storage Tank (UST) 7 feet in diameter and approximately 16 feet long (approximately 6,000 gallons). Suspected Fuel Tank. Tank is filled with water and soil. Tank will be cleaned, removed and disposed off as per the appropriate standards and requirements.
221 TINGEY ST SE   
06/05/18 
GONE YARD HOTEL OWNER LLC / MITCH PERMUY 7272100491
E1807017 / SUPPLEMENTAL
227 TINGEY ST SE   
05/25/18 
FOREST CITY WASHINGTON / MELISSA DIAZ
B1801871 / CONSTRUCTION
Yards Parcel L-2. New 11-story mixed use building with residential, retail on ground level, and underground parking garage. TPR
   
05/31/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806388 / SUPPLEMENTAL
(2) Backwater valve
   
06/07/18 
UNITED STATES OF AMERICA / MICHAEL ERIC CAMPBELL 571-229-1360
M1802664 / SUPPLEMENTAL
Equipment Manufacturer Equipment Model AAON DOAS, RTU and AHU DAIKIN VRF and split systems DESERT AIRE LC06R7NFDDMLAERD
   
06/07/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806553 / SUPPLEMENTAL
REVISION TO P1806388. IN LIEU OF 753 SINKS SHOULD READ 264 SINKS, 489 BASINS
300 TINGEY ST SE   
06/04/18 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS 443-532-0991
M1802615 / SUPPLEMENTAL
   
06/04/18 
FC BOILERMAKER LLC / null
P1806437 / SUPPLEMENTAL
   
06/05/18 
FC BOILERMAKER LLC / CARLOS E. MONTES
P1806464 / SUPPLEMENTAL
355 WATER ST SE   
06/14/18 
UNITED STATES OF AMERICA / EDUARDO LOPEZ 2023884000
E1807680 / SUPPLEMENTAL
355 WATER ST ST SE   
06/13/18 
UNITED STATES OF AMERICA / KIMBERLY SPEED
TN1800127 / CONSTRUCTION
The Great Lawn at Yards Park will be the site of the California State Society Annual Summer Picnic. The contract specifies the licensee to obtain permits for tents and generators on the lawn. The large tent is 100 x 40 - which I have the Certificate of Flame Resistance), as well as a generator. I have the generator specifications from the distributor.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.