Since January, 2003
            
 Page Through from Before to After

Thanks to one of the National Capital Planning Commission's fabulous documents, we're starting to get first hints of plans by the Cohen Companies for what they are describing as a three-building, 815,000-square-foot office, hotel, retail project on the very eastern end of M Street, nestled between Boathouse Row and the CSX tracks east of Maritime Plaza. It's so early in the process that it's not even on Cohen's New Projects page, but City Paper's Housing Complex blog has learned that the company will be putting together a planned unit development application to the Zoning Commission "over the next six to nine months." (No financing is lined up, though, so don't look for digging to start anytime soon.) See the NCPC document for some early drawings and some basic information on how they envision the offerings of the three buildings.
(Cohen Companies, by the way, is the developer of Velocity.)
Back in 2003-ish, there were plans for this site to be a townhouse development (see page 15), but those never got off the ground partly because of zoning issues, which then begat an attempted rezoning of the area in 2004 that failed. But rezoning of the site will have to be back in the forefront when this project's PUD application hits the zoning committee, since the space is still zoned "M" (industrial).
The project is in front of NCPC because of Cohen's request to close "paper street" segments of Virginia Avenue, M, and 14th streets. This is a part of a settlement between 1333 M Street, SE, LLC and the city from a lawsuit over waterfront development in South*west*, where the Cohen Companies are agreeing to release their claims in exchange for three small pieces of government land at 1333 M SE as well as the city's support in requesting the street closures. (The street closures themselves have been approved by the city council as bill B18-0572, and are expected to become law later this month.)
The NCPC is objecting to the street closures; and thankfully Greater Greater Washington has been writing in detail on the case, so I'm just going to throw it over to them for all the nitty gritty, because it's way out of my league. (Read also this GGW entry about connecting this area to the neighborhoods to its north if/when the remnants of the freeway to Barney Circle are removed.) But, again, the NCPC staff recommendation report is also a great read for not only the NCPC's concerns but also for the history of the area under review and other details. The NCPC board is meeting this afternoon, and we'll see what comes out of the session (I assume GGW will be hot on the trail).
If you've never ventured down that way, my East M page has a few not-particularly-current photos of the location (I don't get there very often myself), along with more images of Boathouse Row. When the project begins to wind its way through the zoning process, I'll get more on the ball. The city's 2009 Boathouse Row Planning Study is also a good spot to learn more about the area.
UPDATE: Thanks to commenter Evan, I'm reminded that I should have included the additional information that, because this is part of the old Washington Gas (and I think Steuart Petroleum) site, there are some serious remediation issues to be addressed, which are mentioned both by Ron Cohen on page 25 of this 2003 ZC transcript and on page 19 of this 2004 ZC transcript (saying that the contaminated soil is 11 feet down). Remediation is also mentioned in the 2009 Boathouse Row Planning Study and in this EPA document (under "Washington Gas and Light"). Oh, and the EPA's 1999 record of decision on what cleanup remedies would be needed. It should be noted that both Maritime Plaza buildings were completed after this document. (This is all before my time, so I'm researching on the fly.)
UPDATE II: Here's a WBJ article (subscribers only for 7 days) on the NCPC angle; it also reminds that, outside the monumental core of the city, NCPC's rulings are purely advisory.
Comments (4)
   
 
 More About 1333 M

JDLand.com Home

Comments

evan says: (5/6/10 1:24 PM)
Isn't that the old Washington Gas site?? If so, then it's HEAVILY polluted. They did coal gasification on that site for a really long time, and the pollution is incredibly extensive. It should be an EPA superfund site.

The District has been fighting with Washington Gas for years to get Washington Gas to pay for the remediation--and it won't be cheap!

I CANNOT believe that anyone would get the green light to develop on that site or would want to...


JD says: (5/6/10 1:36 PM)
You're right, and the remediation is mentioned in some of the zoning documenst from 2005 (when they were talking about rezoning the area).


c says: (5/7/10 9:08 AM)
today's post express, page 21 profiles our hood


JD says: (5/7/10 2:46 PM)
That Express article was originally published in March, don't know why they printed it again:

link


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Jscott280 on Roundup of Some: Looks like the Hilton brothers are partnering with solace brewing for the retail...
JD on Roundup of Some: And these tidbits from Martin Austermuhle on Twitter: Yikes: Per data from D....
JD on Roundup of Some: This is why I remain extremely reticent to speak much of expected openings. h...
tmich93 on Roundup of Some: Just tried La Famosa yesterday and it was terrific. Their menu has terrific valu...
tmich93 on Roundup of Some: Sorry to hear that JD! Best wishes to your father during his recovery.
jdc on Roundup of Some: We miss JD, but family comes first. Best wishes on a speedy recovery for your da...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 09/16/20
100 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/16/20
200 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/20
1000 B/O 3RD PLACE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/20
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/12/20
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/10/20
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/07/20
UNIT B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/04/20
1100 B/O 8TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/30/20
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/27/20
UNIT B/O K ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/23/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 130   
09/08/20 
ASANA PARTNERS / KEE HAN KIM; W. SAKIE - BHAR; NA
SG2000328 / CONSTRUCTION
Install one set of building sign and one set of double side blade sign
1331 4TH ST SE CU   
08/28/20 
FC 1331 LLC / null
P2008455 / SUPPLEMENTAL
   
08/31/20 
FC 1331 LLC / null
E2010801 / SUPPLEMENTAL
   
09/01/20 
FC 1331 LLC / null
P2008520 / SUPPLEMENTAL
150 I ST SE   
09/10/20 
SQUARE 737 LLC / SHON THOMAS
AH2001871 / CONSTRUCTION
Placing mobile crane on 2nd Street SE for hoisting materials to 150 I Street SE and closing sidewalk for pedestrian safety
300 M ST SE   
09/11/20 
FEDERAL CENTER LP / HOSSEIN HAMED; WILLIAM G ROSENBERG; NA
SG2000379 / CONSTRUCTION
INSTALL TWO BUILDING MOUNTED LED-ILLUMINATED SIGNS W / FACE LIT CHANNEL LETTERS ON BACKER.
861 NEW JERSEY AVE SE   
08/26/20 
GREYSTAR GP LLC / CHARLES C. BAKER; CHARLES C. BAKER
M2003573 / SUPPLEMENTAL
   
08/26/20 
GREYSTAR GP LLC / CHARLES C. BAKER; CHARLES C. BAKER
P2008383 / SUPPLEMENTAL
   
08/26/20 
GREYSTAR GP LLC / CHARLES C. BAKER; CHARLES C. BAKER
P2008384 / SUPPLEMENTAL
   
09/08/20 
0861 NEW JERSEY AVE / null
M2003711 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 20590   
08/26/20 
UNITED STATES OF AMERICA / null
M2003570 / SUPPLEMENTAL
1299 NEW JERSEY AVE SE   
09/08/20 
BROOKFIELD PROPERTIES / TIM GOOD
BP2004497 / POST CARD
1013 O ST SE 20374   
08/25/20 
UNITED STATES OF AMERICA / JOHN P RUTTER; JOHN P RUTTER; KYLE ERICKSON
BCIV2000052 / CONSTRUCTION
This project is for the interior renovation of the historic buildings 46 and 67 in the Washington Navy Yard. New utilities will be installed to serve the building. NO NEW BUILDING WILL BE CONSTRUCTED AS PART OF THIS PROJECT. A parking lot south of the building will be used to provide stormwater management, as there is no ample open space within the buildings for stormwater BMPs.
   
09/14/20 
UNITED STATES OF AMERICA / JOHN BROWNING
SB2000494 / CONSTRUCTION
Install three temporary 1" groundwater monitoring wells down to 4' bsg in the basement of buildings 46 and 67 in the Washington Navy Yard for groundwater sampling. Wells will be removed less than 1 week following installation, and the voids will be filled with grout.
71 POTOMAC AVE SE   
09/03/20 
MRP REALTY / JUSTIN BELLOW
TL2000041 / CONSTRUCTION
1st time tenant fit out in new building
   
09/04/20 
RIVERFRONT HOLDINGS II, LLC / JUSTIN BELLOW
B2007457 / CONSTRUCTION
Revision to B1804337 to revise the location of IZ units.
520 TINGEY ST SE   
08/31/20 
U. S. GENERAL SERVICES ADMINISTRATION / JOHN WICKLIFFE
TN2000086 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed on Aug 4, 2020 - Jan 29, 2021 Events Daily 8:00 am - 10:00 pm
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.