Since January, 2003
            
 Page Through from Before to After

With the opening of the 2010 season at the ballpark and lots of other interesting news of late, my blogging time and focus has been geared toward these bigger items. But there's a fair amount of little stuff that I point to every day on my Twitter feed (also available on Facebook), mainly news stories that might be of interest but that aren't really important or newsy enough to devote much more than 140 characters to. I may eventually transition to leaving those completely to Twitter, but I still feel guilty enough for now to round them up here on the blog every so often. But if you're wanting all news items at warp speed, best to start reading the Tweets.
* EYA has passed the news to me that all Capitol Quarter Phase I townhouse units are now sold. They are gearing up to begin sales of the Phase II houses, which will start "soon." (Though I wouldn't take your tent down to their sales office just yet.) I imagine they will do the releases of these next houses in groups based on location, as they did with phase I. It's still expected that the entire townhouse development will be built out by the end of 2012.
* Last weekend Bisnow took a walk around the neighborhood with a camera (a novel idea!), and gave their readers an update on some of the projects. The only section that I've not seen reported before is Akridge now saying that construction for their 700,000-sq-ft mixed-use Half Street project is now pegged at "hopefully before next baseball season," likely meaning 2011. But, "once shovels hit the dirt, the one residential and two office buildings will likely go up at once," Bisnow quotes an Akridge rep as saying. It also says that Forest City is "hoping" to get started on the Boilermaker Shops retail renovation at the Yards before the end of this year. (Lots of "hoping" going on!) There's even a picture of the Pillsbury Doughboy that gazes out over the neighborhood from Capitol Hill Tower.
* Voice of the Hill says there's a possibility of a temporary dog park being installed at the Virginia Avenue Park (Ninth and Potomac, SE), at least until CSX starts on its tunnel construction project (more on CSX coming in another post later today). This is coming to the forefront because the principal of Tyler Elementary has now banned dogs from the school's playing field.
* Some neat overhead photos from DDOT showing the progress on the 11th Street Bridges construction. I'm hoping to get some ground-level images myself before too much longer.
* CNN reports on how Nationals Park has become a very hot venue for political fundraising, actively pursued and encouraged by the team. "[F]ederal candidates, major political parties, and political action committees have spent at least $432,000 on fundraising events either at Nationals games or at their facility, according to campaign finance documents filed with the Federal Election Commission."
Comments (0)
   
 
 More Recent News

JDLand.com Home

Comments

No comments posted.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

RMP on Super Tuesday Tidbits: The Willow space is cleared out :(
MarkinDC on Super Tuesday Tidbits: This article has some great info for helping out our neighborhood restaurants an...
CJBabyDaddy on Super Tuesday Tidbits: @RMP: I’m stacking up gift cards so I can celebrate by binging at a couple of m...
AGH on Super Tuesday Tidbits: Just got notice that the new retail on N street will be: Kilwins (Chocolate, Fud...
Jscott280 on Super Tuesday Tidbits: Kilwins(ice cream), chicken + whiskey and taphouse 99 coming to N street.
RMP on Super Tuesday Tidbits: Does anyone else feel like they are spending more money on restaurants right now...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/23/20
1500 B/O SOUTH CAPITOL ST SE   THEFT
Shoplifting
 03/11/20
200 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/09/20
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/08/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 03/06/20
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/05/20
1200 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/01/20
1100 B/O 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/27/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 1001   
03/16/20 
LA FAMOSA LLC / null
P2004796 / SUPPLEMENTAL
   
03/20/20 
LA FAMOSA LLC / null
E2005975 / SUPPLEMENTAL
1300 4TH ST SE 1006   
03/16/20 
LA FAMOSA LLC / null
M2001859 / SUPPLEMENTAL
1300 4TH ST SE RU-1   
03/04/20 
AP BOWER RETAIL LLC / DAVID T FONTANA; BACON CONSTRUCTION COMPANY BACON CONSTRUCTION COM
TL2000065 / CONSTRUCTION
First time tenant layout on 1,196 SF of 1st floor retail shell for restaurant, Jeni Ice Cream, with 10 seats
   
03/06/20 
AP BOWER RETAIL LLC / null
E2005415 / SUPPLEMENTAL
   
03/11/20 
AP BOWER RETAIL LLC / DOMINIC E TOTARO; DOMINIC E TOTARO
M2001793 / SUPPLEMENTAL
1300 4TH ST SE   
03/13/20 
LA FAMOSA LLC / KIMOY LALLEMENT; POTOMAC CONSTRUCTION SERVICES
TL2000028 / CONSTRUCTION
New tenant layout for commercial kitchen, two restrooms, point of sale bar, and dining seating, new lighting and mechanical zones. 2,338 sf INDOOR OCCUPANCY: 84 PERSONS WITH 59 SEATS OUTDOOR OCCUPANCY: 38 PERSONS WITH 38 SEATS TOTAL MAX OCCUPANCY: 122
900 5TH ST SE   
03/03/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / CHRISTOPHER LAKATOSH; CHRISTOPHER LAKATOSH
E2005256 / SUPPLEMENTAL
   
03/24/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KAYLA TRICE; DELAWARE
EN2001608 / SHOP DRAWING
Install 3 new hydraulic passenger elevators
2 I ST SE   
03/09/20 
CRESCENT CAPITOL VIEW MF LLC / BOB BIROONAK; BOB BIROONAK; BOB BIROONAK
SG2000223 / CONSTRUCTION
one non illuminated sign
200 I ST SE   
03/17/20 
DISTRICT OF COLUMBIA / LEIA TERRELL
B2006382 / CONSTRUCTION
Tenant Alterations of existing office doors and wall. Including relocation of existing electrical, and mechanical terminals. NO CHANGE OF EGRESS, USE OF OCCUPANCY, NO EXTERIOR LAND DISTURBANCE, NO BASE BUILDING STRUCTURAL WORK.
139 N ST SE   
03/16/20 
PARCEL I FC ROWAN / MIGUEL RIOS; GRIFFIN DEWATERING, LLC
SB2000152 / CONSTRUCTION
Type of proposed System: Deep well dewatering system consisting of 16 wells around the perimeter of the shored excavation and 2 wells within the excavation in a mutually agreed layout. • Installation Method: Wells will be drilled up to 70’ deep, utilizing Griffin’s hollow stem auger drilling rig to drill up to a 10.25” I.D. borehole. Deep wells come complete with screen, casing, riser pipe and a s...
861 NEW JERSEY AVE SE   
03/03/20 
809-853 NEW JERSEY AVENUE ACQUISITION LLC / ERICKA CLARK
AH2000987 / CONSTRUCTION
Tower crane erection must be performed in 1 day due to weather constraints. All work performed onsite. Noise reduction procedure in place.
1275 NEW JERSEY AVE SE   
03/06/20 
MILLER AND LONG / WILLIAM MOORE
AH2001001 / CONSTRUCTION
After hours to pour concrete with pump truck saturday 3 / 7 and sunday 3 / 8 from 9PM-4AM.
1299 NEW JERSEY AVE SE   
03/13/20 
FOREST CITY SEFC LLC / SARAH J. NAPIER
BCIV2000067 / CONSTRUCTION
Revisions to BCIV1800153. This submission is for approval stamps only. No change in work.
71 POTOMAC AVE SE   
03/27/20 
MRP RESIDENTIAL / KAYLA SHATTUCK; KAYLA SHATTUCK; PARADIGM CONTRACTORS LLC
BCIV2000036 / CONSTRUCTION
This permit is for site civil work at 71 Potomac Avenue SE including stormwater management and erosion & sediment control. See plans for more details.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.