Since January, 2003
            
 Sliding from Before to After

Rounding up some new and Tweeted tidbits, now that I've recovered from cranking out the State of the Hood:
* (h/t "reader X") The second foreclosure sale held yesterday for the boarded-up apartment building and surrounding lots at Potomac, Ninth and L brought no bids above the $2 million starting point, so the properties will now return to the lender. An earlier auction back in October had brought a $2.461 million winning bid, but that deal fell through. The properties were originally bought by ICP Partners in 2006, along with the gray building at Eighth and Potomac, for $9 million.
* Via ANC 6B03 commissioner Norm Metzger, the Marines have created a web site for their "Community Integrated Master Plan." The site describes this planning process as evaluating "community-military development partnering options" because "[t]here are unmet facility needs and security requirements at Marine Barracks Washington and a potential to meet common community and military needs through the process" and that their goal is "to use a coordinated planning process to create a win-win in meeting the development needs of the local community and Marine Corps." Now that that's cleared up, you can go to the open house they're having on Jan. 27 from 5 to 8 pm in the North Hall of Eastern Market, to "assist the planning team in identifying issues, concerns, and potential opportunities for military-community development partnering."
* One of many service reductions proposed by WMATA to help close their FY2010 budget gap is to shut down one of the two entrances to the Navy Yard metro station on weekends. (They don't say which one.) The public hearing on their various proposals is Jan. 27 at 5:30 pm. UPDATE: From Michael Perkins, in the comments, it would be the west entrance, at Half and M. I wonder if this would only be when there are no stadium events?
* Via the Capitol Hill Chamber of Commerce's Twitter feed, there will apparently be one more Lower 8th Street visioning session, on February 22. After this final session, the group will forward its recommendations to the Office of Planning on what sort of development should be emphasized for these blocks south of the freeway.
* In Sunday's Post, Dr. Gridlock took a look at the 11th Street Bridges project, telling drivers what to expect as the construction unfolds, and that the "new bridges will forge a link between Maryland, the District and Virginia that has been missing since the original highway plan for the District was abandoned decades ago. And it will create a new link between neighborhoods on both sides of the Anacostia while relieving them of some of the commuter traffic that spills onto local streets."
* As part of the start of work on the bridges, a raze permit application has been filed to demolish the old red brick buildings between the current bridges that housed the Anacostia Community Boathouse, whose operations are now moving up-river to a temporary (maybe permanent) home at the Anacostia Marina.
* A little time spent trolling through public records shows that within the past month a bunch of the liens brought against Opus East when they liquidated and stopped work on 1015 Half Street have been settled. No indications from the new owner (Douglas Wilson Companies) as to when construction might restart, despite their statements back in October that it would be happening soon.
Comments (6)
   
 
 More Recent News

JDLand.com Home

Comments

Michael Perkins says: (1/21/10 3:55 PM)
Docket says the proposed entrance to be closed is the west one.

link


Ray-N-Rockville says: (1/21/10 11:47 PM)
Closing the west entrance on weekends is absolutely foolish if they think it will save money. So all the people entering the stadium for events are now gonna be walkng up First Street after they leave Metro to walk to the stadium? The police are gonna have a pretty good size force in use to handle the crowds crossing M Street twice. This makes no sense from a logistical stand point and is going to cost the City thousands of dollars to implement on weekends there is any event at the stadium.


ScottKC says: (1/22/10 3:50 PM)
One would hope they would make an exception for Saturday events at the stadium. Kinds like how the Navy Yard/Capitol Hill Circulator runs on game day weekends, but otherwise not.


MJM says: (1/22/10 4:24 PM)
I seriously doubt they would keep the entrance closed during games - metro doesn't make sense a lot of times but they aren't that dumb.


Michael says: (1/25/10 10:06 AM)
it's only for non-event days... same as last year


Dan says: (1/25/10 3:40 PM)
Hey JD,

The blog documenting the boathouse's move upriver has changed names to reflect a broader scope. It's now called "Along the Anacostia - East of 11th Street." link There's more detail on the change in the blog's headline post.

Thanks for the shout-out! We're excited to see some exciting development along the river between the new bridges, the Anacostia National Park renovations, and (of course) the new boathouse.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts

jdc on June Construction Update: Sigh. If only, as shown in that photo, that segment of Half Street would be clos...
202_cyclist on June Construction Update: JD-- thank you for posting the article. I'm impressed by the engineering requir...
JD on June Construction Update: And since I skipped writing about the new Douglass Bridge, here's a good piece a...
malatesta on June Construction Update: That's, uh, not a very good article. It's correct in that I know there's plenty ...
202_cyclist on June Construction Update: Well, One Hill South looks a lot more comfortable than a baby prison.
202_cyclist on June Construction Update: @RMP— BARF! BARF! and BARF!
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O VIRGINIA AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/18/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/16/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/11/18
1100 B/O 8TH ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/10/18
UNIT B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/09/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/06/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/29/18
1000 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/28/18
1100 B/O 10TH ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/26/18
1100 B/O 9TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/25/18
UNIT B/O I ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/25/18

Recent Issued Building Permits Archive  
1100 2ND PL SE   
06/19/18 
CAPPER CARROLLSBURG VENTURE LLC / null
E1807795 / SUPPLEMENTAL
1018 3RD ST SE   
06/06/18 
DAVID A LEINER / SCOTT STERL
F1800474 / CONSTRUCTION
REPLACEMENT OF AN EXISTING CHAIN LINK FENCE TO A WOODEN FENCE 6FT. TALL.
1212 4TH ST SE   
06/06/18 
null / THAIS NA PEACHER
EHOP18924304 / HOME OCCUPATION
100 H ST SE   
06/19/18 
DISTRICT OF COLUMBIA / RUSSELL COX
FD1800083 / CONSTRUCTION
Construction of foundation only
101 H ST SE   
06/05/18 
SQUARE 737 LLC / JOHN SONNER 4438727277
E1807389 / SUPPLEMENTAL
   
06/06/18 
SQUARE 737 LLC / null
P1806501 / SUPPLEMENTAL
2 I ST SE   
05/31/18 
CRESCENT CAPITOL VIEW / null
E1807278 / SUPPLEMENTAL
4 I ST SE   
06/18/18 
CRESCENT COMMUNITIES / KIM MITCHELL
B1804349 / CONSTRUCTION
VELOCITY - 4 I ST SE- IS THE PHASE II OF A MIXED-USE RESIDENTIAL PROJECT LOCATED AT 2 I ST SE. IT SITS AT TE CORNER OF I ST & SOUTH CAPITOL ST SE. PHASE II CONSIST OF 184 RESIDENTIAL UNITS AND ROUGHLY 3,800 SF OF RETAIL ON 1ST FLOOR FACING I STREET. TWO LEVELS OF UNDERGROUND PARKING GARAGE SERVES BOTH PHASES OF THE PROJECT. BUILDING HEIGHT IS 130 FEET. INCLUDING 3 ELEVATORS.
202 M ST SE   
05/29/18 
null
E1807211 / SUPPLEMENTAL
   
05/29/18 
null
P1806323 / SUPPLEMENTAL
100 M ST SE   
06/05/18 
SQUARE 743 INC / ROBERT L HUNTER 703-404-0303
M1802631 / SUPPLEMENTAL
202 M ST SE   
05/31/18 
UNITED STATES OF AMERICA / null
P1806387 / SUPPLEMENTAL
300 M ST SE   
06/01/18 
FEDERAL CENTER LP / SAM HOLLEN
B1809520 / CONSTRUCTION
INTERIOR RENOVATION TO 8TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING OR STRUCTURAL. 860 SQUARE FEET. STRATEGIC INSIGHT
410 M ST SE   
05/30/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / SCOTT NICHOLS
AN1800023 / CONSTRUCTION
AT&T proposes to add three new antennas to an existing rooftop telecommunications facility.
1115 NEW JERSEY AVE SE   
06/07/18 
DONOHOE REAS ESTATE SERVICES / null
E1807467 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE 20003   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807687 / SUPPLEMENTAL
   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807698 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE 20001   
06/21/18 
GALLERY CAPITOL RIVERFRON PROPERTY / null
P1806901 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
06/12/18 
GALLERY CAPITOL WATERFRONT PROPERTY LLC / null
P1806653 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
06/12/18 
SQUARE 742 LLC / CLIFFORD DIXON
B1807730 / CONSTRUCTION
REVISION: REVISE B1804348 5TH FLOOR OFFICE SPACE TO EXTEND THE OFFICE INTO ADDITIONAL SPACE TO CREATE A LARGER OPEN OFFICE
1200 NEW JERSEY AVE SE 20590   
06/20/18 
JBG/FEDERAL CENTER LLC / ALFRED F JORDAN 202-437-5067
E1807865 / SUPPLEMENTAL
71 POTOMAC AVE SE   
05/30/18 
FORIDA ROCK PROPERTIES INC / ANKIT K SINGH
UT1800044 / CONSTRUCTION
Removal of an Underground storage Tank (UST) 7 feet in diameter and approximately 16 feet long (approximately 6,000 gallons). Suspected Fuel Tank. Tank is filled with water and soil. Tank will be cleaned, removed and disposed off as per the appropriate standards and requirements.
221 TINGEY ST SE   
06/05/18 
GONE YARD HOTEL OWNER LLC / MITCH PERMUY 7272100491
E1807017 / SUPPLEMENTAL
227 TINGEY ST SE   
05/31/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806388 / SUPPLEMENTAL
(2) Backwater valve
   
06/07/18 
UNITED STATES OF AMERICA / MICHAEL ERIC CAMPBELL 571-229-1360
M1802664 / SUPPLEMENTAL
Equipment Manufacturer Equipment Model AAON DOAS, RTU and AHU DAIKIN VRF and split systems DESERT AIRE LC06R7NFDDMLAERD
   
06/07/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806553 / SUPPLEMENTAL
REVISION TO P1806388. IN LIEU OF 753 SINKS SHOULD READ 264 SINKS, 489 BASINS
   
06/18/18 
UNITED STATES OF AMERICA / MITCH PERMUY 7272100492
E1807256 / SUPPLEMENTAL
300 TINGEY ST SE   
06/04/18 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS 443-532-0991
M1802615 / SUPPLEMENTAL
   
06/04/18 
FC BOILERMAKER LLC / null
P1806437 / SUPPLEMENTAL
   
06/05/18 
FC BOILERMAKER LLC / CARLOS E. MONTES
P1806464 / SUPPLEMENTAL
355 WATER ST SE   
06/14/18 
UNITED STATES OF AMERICA / EDUARDO LOPEZ 2023884000
E1807680 / SUPPLEMENTAL
355 WATER ST ST SE   
06/13/18 
UNITED STATES OF AMERICA / KIMBERLY SPEED
TN1800127 / CONSTRUCTION
The Great Lawn at Yards Park will be the site of the California State Society Annual Summer Picnic. The contract specifies the licensee to obtain permits for tents and generators on the lawn. The large tent is 100 x 40 - which I have the Certificate of Flame Resistance), as well as a generator. I have the generator specifications from the distributor.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.