Since January, 2003
            
 Sliding from Before to After

With the launch a few weeks back of a bike lane on 15th Street NW, attention is beginning to focus on other locations in the city where there is a desire to place new dedicated bike lanes, and one of those spots is M Street SE/SW, running from Sixth Street, SW to 11th Street, SE, which is a route that Tommy Wells has been interested in for quite a while.
Back in early October, WashCycle reported that DDOT's Bicycle Advisory Facility Committee discussed the M Street concept, and in mid-November the members of the Capitol Riverfront BID were briefed on a feasibility analysis done by the Toole Design Group, with the assembled BIDders told that FY10 funds are available and that there's a desire by Wells and DDOT to get the lanes built before the start of the 2010 baseball season, which apparently caught a number of the briefing attendees by surprise.
In the analysis that was presented to the BID (which you can see here, although appendices A and B were left blank in the handouts), the main recommendations are:
* Configure the two curb lanes on M Street as "cycle tracks" with flexible posts, a temporary measure suggested because of the "unknowns" of any future streetcar implementations along M Street. There would also be a widening of the sidewalks between Half streets SE and SW, moving the cycle track onto the widened sidewalk, because this area is where the "most intense traffic on the corridor occurs."
* Eliminate all parking along M Street at all hours, though "after a period of evaluation it may be appropriate to allow parking adjacent to the cycle track if it is desired."
* Move all transit stops to the far sides of intersections, where buses and bikes can more easily cross and where buses can still pick up and drop off passengers at a curb rather than on street level.
* Reconfigure all traffic signals to allow bikes time to get through intersections before vehicle traffic gets a green light (the bikes and the pedestrian "walk" signals would go green first, followed then by the vehicular greens).
The "very preliminary" cost estimates for the options developed by the study come in around the $450,000 range according to the document, but it must be remembered that this is a study, and not the final plans, and the numbers could go up or down.
There apparently were some business owners at the BID meeting who were displeased with the plans, centering mainly around the traffic implications of the loss of one lane in each direction, which during rush hour and ballpark events are travel lanes and which are parking for customers/workers/residents/etc. the rest of the time.
This could especially be an issue during events at Nationals Park, a scenario which isn't mentioned at all in the feasibility study and which has the Nationals particularly concerned (as apparently voiced by the Nats' Gregory McCarthy at the briefing), since it's not out of the realm of possibility (my words, not theirs) that attendance at the ballpark could rise substantially if the team's fortunes improve, making the backups that are seen when the stadium is sold out--such as during the Red Sox series this summer--considerably worse.
There's been no meeting with ANC 6D commissioners yet about this, though reportedly one is coming soon. I've got a request in to Tommy Wells's office for more information (and what better time to ask a question like that than right around Thanksgiving), so no doubt there is much more to come.
Comments (8)
   
 
 More About M Street

JDLand.com Home

Comments

w says: (11/30/09 4:55 PM)
DC is a real city and many many people here do not drive and are NOT auto-oriented-use transit, walk, bicycle- and we desperately need better bicycle infrastructure .There is no reason to fight this excellent idea.


JM says: (12/2/09 2:28 PM)
JD-

Does the news that there will be no "groundbreakings" in DC regarding new properties refer also to any projects such as the Yards, where there are existing buildings that are having additions built on to them or re-done in the inside, etc? Or does it only refer to buildings that have yet to have any ground broken on them? I'm just wondering if there has been any word on any of the commercial projects in Near Southeast as of late? When I attended the Capitol Riverfront BID picnic and neighborhood tour over the summer, the gal giving the tour said that some of the buildings that make up the Yards will begin heavy construction in early 2010.


JD says: (12/2/09 3:55 PM)
I went to Forest City at the time to ask about what the BID folks were telling people at that picnic/tour, and Forest City wouldn't confirm any plans for the start of construction on any projects. They told me they were hoping to be able to have an announcement soon, but that was back in late September.

So, as of now, I don't know of any projects that would get underway any time soon, except perhaps Phase 2 of Capitol Quarter and maybe the mixed-income apartment building to be built by the Housing Authority at 7th and L, if the bond sale happens. The only commercial project that looked like a possibility in 2010--Akridge Half Street--has made no moves that I've seen toward any groundbreakings. Maybe the second half of 2010 will see some movement, but nothing that can really be foreseen right now.


E says: (12/3/09 2:20 PM)
Apparently, SWNA meeting on November 23 (reported on page 3 in the Southwester link mention was made of the Yards, although it isn't in Southwest.


JM says: (12/4/09 12:52 PM)
Hey E Street, your link didn't work.


Andy says: (12/4/09 3:26 PM)
JM, take the parenthesis off the end of E's link in the address bar after you click on it. That's how I got it to work for me.


Andy says: (12/5/09 8:24 AM)
Hurray! It's a good thing to city's leadership is pushing for this - long over due improvements to ensure cyclist's safety and still allow flow of traffic.


JM says: (12/7/09 9:55 AM)
Thanks, Andy. E Street, good stuff in that newsletter. Thanks for posting the link. Sounds like a representative from Forest City is saying similar things that the BID did a few months ago. Construction is going to start back up after the New Year and also there will be some announcements in the next few months on restaurants that will be going into a restaurant pavillion (can't remember which building, maybe the Boilermaker Shop).

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJBabyDaddy on Inching from Quarantining: @dcgent: That 7-11 is waaaaaay the heck over in Southwest. If NASA launched a p...
dcgent on Inching from Quarantining: Here's a few --proposal building to replace 7-11 on S. Cap https://dc.urbanturf....
JD on Inching from Quarantining: Okay Commentariat, I need to put up a new post, but obviously my brain remains e...
Jscott280 on Inching from Quarantining: This is kind of confusing: It seems that dacha beer is breaking away from dacha(...
Andres4Mayor on Inching from Quarantining: Toastique soft opening on Monday 7/13.
Westnorth on Inching from Quarantining: M St SE is getting rush-hour bus lanes from 1/2 St to 10th St. https://ddot.dc....
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/06/20
1200 B/O HALF ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/05/20
100 B/O H ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/03/20
100 B/O O ST SE   ROBBERY  07/03/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/28/20
1200 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/25/20
1200 B/O SOUTH CAPITOL ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 06/23/20
1200 B/O NEW JERSEY AVE SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 06/20/20
1000 B/O 3RD PLACE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/20
800 B/O SOUTH CAPITOL ST SE   ASSAULT WITH A DANGEROUS WEAPON  06/14/20
400 B/O M ST SE   THEFT
Shoplifting
 06/12/20
1000 B/O M ST SE   ROBBERY
Unarmed Carjacking
 06/09/20
UNIT B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  06/07/20

Recent Issued Building Permits Archive  
1300 4TH ST SE RU-2   
06/18/20 
AP BOWER RETAIL LLC / MELISSA BRENT
SG2000335 / CONSTRUCTION
Install 1 illuminated wall sign & 1 illuminated blade sign - JENIs ICE CREAM
150 I ST SE   
06/15/20 
SQUARE 737 LLC / BOB BIROONAK; NA; NA
SG2000323 / CONSTRUCTION
two illuminated building sign
151 M ST SE   
06/18/20 
BROOKFIELD PROPERTIES / CHRIS CRESCI; NA
SB2000292 / CONSTRUCTION
WSP will be advancing approximately 50 soil borings to 30 feet, and an additional 8 borings to 4 feet via direct push. A water sample will be collected from 3 of the deep borings. All borings will be abandoned via bentonite grout mix. Investigation derived waste will be stored in DOT 55-gallon steel drums. Private and public utility locating will take place prior to the work beginning
250 M ST SE   
06/19/20 
WILLIAM C SMITH / null
E2008622 / SUPPLEMENTAL
   
06/24/20 
SQUARE 769 LLC / null
M2002834 / SUPPLEMENTAL
   
06/24/20 
SQUARE 769 LLC / null
P2006931 / SUPPLEMENTAL
300 M ST SE   
06/16/20 
FEDERAL CENTER LP / null
E2008501 / SUPPLEMENTAL
   
06/18/20 
FEDERAL CENTER LP / null
E2008587 / SUPPLEMENTAL
111 N ST SE   
06/16/20 
BROOKFIELD PROPERTIES / NA; CHRIS CRESCI
SB2000293 / CONSTRUCTION
WSP will advance 22 soil borings to 25 feet and 8 soil borings to 4 feet via direst push. A groundwater sample will be collected from 2 of the deep borings by installing a temporary well to be in the ground for just a couple hours. Borings will be backfilled with bentonite / grout mix. IDW will be stored in DOT 55-gallon drums. A private and public utility mark out will be completed prior to b...
861 NEW JERSEY AVE SE   
06/10/20 
CXS TRANSPORTATION INC / ;
P2006604 / SUPPLEMENTAL
   
06/19/20 
CXS TRANSPORTATION INC / ;
P2006843 / SUPPLEMENTAL
   
06/22/20 
GREYSTAR GP LLC / KIM MITCHELL
B1903035 / CONSTRUCTION
The proposed project is three structures which are connected by a shared below-grade garage, which is one story deep on the east half of the site and two stories deep on the west half of the site. Two structures will be residential, with a total of 756 units, and the third will be a 225-key hotel. The west residential structure (Building 3) is planned to be 13 stories with ground and roof level am...
   
06/25/20 
CXS TRANSPORTATION INC / ;
P2006972 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
06/10/20 
SQUARE 742 LLC, C/O SPAULDING & SLYE/STE 100, / PAUL WHITLEY
AN1900284 / CONSTRUCTION
PROJECT CONSISTS OF: REMOVING: (2) EXISTING EQUIPMENT CABINETS, (3) EXISTING ANTENNA'S, (1) EXISTING RRU'S AND ANCILLARY EQUIPMENT / CABLE AND INSTALLING: (6) PROPOSED ANTENNA'S, (3) PROPOSED RRU'S, AND(2) PROPOSED EQUIPMENT CABINETS ON AN EXISTING TELECOM FACILITY
1111 NEW JERSEY AVE SE   
06/12/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / TRACIE CLAXTON; NA; NA
SG2000257 / CONSTRUCTION
One Wall Mounted Sign illuminated
   
06/24/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
P2006938 / SUPPLEMENTAL
401 WATER ST SE   
06/18/20 
BROOKFIELD PROPERTIES / CHRIS CRESCI
SB2000294 / CONSTRUCTION
WSP will advance 23 soil borings to 30 feet and 8 additional borings to 4 feet using direct push. A groundwater sample will be collected from 2 of the deep borings by installing a temporary well. Soil boirngs will be abandoned with bentonite / grout mix. IDW will be stored for disposal in DOT 55-gallon drums. A private and public utility mark out will be completed priot to starting intrusive w...
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.