Since January, 2003
            
 Sliding from Before to After

Tonight DDOT held a public meeting to update residents on the Ward 6 Performance Parking Pilot program, which was instituted in March 2008 to attempt to get out in front of expected curbside parking problems in the ballpark area, in Southwest, and along Pennsylvania Avenue and Barracks Row.
There were a lot of numbers passed along, but the biggest one is that, in 19 months of operation, the 138 multispace meters in these areas have collected $1.4 million in fees. And, since the legislation that created the program specifies that, until the meters are paid for, 20 percent of the meters' proceeds will be returned to the PILOT area to pay for "non-automobile improvements", there's now $288,809.34 ready to be spent on signage, bike racks, and other amenities. (And in another three months, the initial capital investment for the meters will be paid off, at which point the neighborhoods will receive 75 percent of the meter proceeds.) But, as it's always emphasized, Performance Parking is not about revenue generation! (It's just a very nice side benefit.)
This first phase of improvements, to be completed by next spring, will include these new additions across the three zones, which were determined in consulation with the program's advisory committee members from various neighborhood organizations (UPDATE: here's the map showing the planned locations of these items):
* 25 new bike racks, branded with neighborhood names;
* Eight "wayfaring" map kiosks and 15 pedestrian wayfaring signs to help folks navigate the areas;
* 10-12 digital signs (with 19" screens) to be installed near the ballpark along M Street and at Barracks Row that will display information useful to ballpark goers (times of next buses, offstreet parking options, pedestrian info, PSAs, ads, etc), along with perhaps one 60" screen at the Half Street Navy Yard Metro station entrance ;
* A new to-be-named pedestrian "trail" connecting the Heritage Trails along Eighth Street, SE, and the trail whose name escapes me in Southwest, running along North Carolina from Ninth Street, SE to New Jersey Avenue to M Street to Fourth Street, SW. Benches (with arms, to prevent snoozers) will be placed along the trails, along with specialized large trash cans with compactors run by solar power (in a one-year pilot test);
* One large kiosk in Southeast and one in Southwest (perhaps to be built by students from Catholic University), where neighborhoods can put information for visitors; and
* Grants to the Capitol Hill Restoration Society and the Capitol Riverfront BID, with the BID receiving $50,000 for improved lighting(!) and other upgrades to the New Jersey Avenue underpass.
Other highlights of the meeting beyond the improvements:
* A Near Southeast resident brought up the issue of street parking for residents at Onyx, Velocity, and the other new buildings--because those streets are all [going to someday be] mixed-use residential, office, and retail areas, there will be no Residential Parking Permits given to residents. But Tommy Wells, who attended part of the meeting, committed to working with DDOT to look at other possibilities, such as allowing residents to park overnight at the meters for a very low price.
* Gregory McCarthy of the Nationals was also there, and mentioned how successful the city has been in encouraging "multimodal transportation" to the ballpark, so much so that Nationals Park is now considered a "best practice" that other teams are looking to emulate. But for those of you who have been enjoying parking for free down on the streets of Buzzard Point during ballgames, your salad days may be over, as DDOT is now looking at signing the streets there.
* There was also discussion of the most-used meters (the 1000-1100 blocks of New Jersey Avenue making the list), the issue of raising or lowering the meter prices at the most-used or least-used spaces, and the average turnover time in the spaces, but having seen David Alpert at the meeting, I'm betting I get to leave discussion of these items to Greater Greater Washington. (I think the numbers will also be on the DDOT web site soon.) It's also likely that the multispace meters are going to be removed from Virginia Avenue and moved to Water Street, SW, because the meters just aren't being used on Virginia. (Besides, Virginia is going to be a big huge trench within a few years, anyway!)
If you have ideas for future non-automobile improvements that can be made, or have any other questions or concerns, you can contact Damon Harvey of DDOT at damon.harvey@dc.gov.
{This post was written while watching Top Chef, so apologies if it's a little disjointed.}
UPDATE, 11/19: Here's the improvements map; and both the existing pedestrian trails are called "Heritage Trails," so I fixed my self-diss above.
Comments (3)
   
 
 More About parking
 All posts: parking, Nationals Park

JDLand.com Home

Comments

F says: (11/19/09 9:15 AM)
Justins cafe (at Velocity) was putting up their sign along First ST SE this morning.

Welcome to the neighborhood Justin.


G St says: (11/19/09 10:43 AM)
You take good notes. Who won Top Chef btw?


JD says: (11/19/09 2:05 PM)
Top Chef isn't over yet--they're now down to the Final 4. (I don't want to post any spoilers here!)

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Jscott280 on Super Tuesday Tidbits: Construction fences up at 1299 first st, has anyone heard what might go here?
202_cyclist on Super Tuesday Tidbits: JD— your brother is doing good work. https://mobile.twitter.com/jamiedupree /st...
RMP on Super Tuesday Tidbits: The Willow space is cleared out :(
MarkinDC on Super Tuesday Tidbits: This article has some great info for helping out our neighborhood restaurants an...
CJBabyDaddy on Super Tuesday Tidbits: @RMP: I’m stacking up gift cards so I can celebrate by binging at a couple of m...
AGH on Super Tuesday Tidbits: Just got notice that the new retail on N street will be: Kilwins (Chocolate, Fud...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/28/20
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/23/20
1500 B/O SOUTH CAPITOL ST SE   THEFT
Shoplifting
 03/11/20
200 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/09/20
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/08/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 03/06/20
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/05/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 1001   
03/16/20 
LA FAMOSA LLC / null
P2004796 / SUPPLEMENTAL
   
03/20/20 
LA FAMOSA LLC / null
E2005975 / SUPPLEMENTAL
1300 4TH ST SE 1006   
03/16/20 
LA FAMOSA LLC / null
M2001859 / SUPPLEMENTAL
1300 4TH ST SE RU-1   
03/11/20 
AP BOWER RETAIL LLC / DOMINIC E TOTARO; DOMINIC E TOTARO
M2001793 / SUPPLEMENTAL
1300 4TH ST SE   
03/13/20 
LA FAMOSA LLC / KIMOY LALLEMENT; POTOMAC CONSTRUCTION SERVICES
TL2000028 / CONSTRUCTION
New tenant layout for commercial kitchen, two restrooms, point of sale bar, and dining seating, new lighting and mechanical zones. 2,338 sf INDOOR OCCUPANCY: 84 PERSONS WITH 59 SEATS OUTDOOR OCCUPANCY: 38 PERSONS WITH 38 SEATS TOTAL MAX OCCUPANCY: 122
900 5TH ST SE   
03/24/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KAYLA TRICE; DELAWARE
EN2001608 / SHOP DRAWING
Install 3 new hydraulic passenger elevators
2 I ST SE   
03/09/20 
CRESCENT CAPITOL VIEW MF LLC / BOB BIROONAK; BOB BIROONAK; BOB BIROONAK
SG2000223 / CONSTRUCTION
one non illuminated sign
200 I ST SE   
03/17/20 
DISTRICT OF COLUMBIA / LEIA TERRELL
B2006382 / CONSTRUCTION
Tenant Alterations of existing office doors and wall. Including relocation of existing electrical, and mechanical terminals. NO CHANGE OF EGRESS, USE OF OCCUPANCY, NO EXTERIOR LAND DISTURBANCE, NO BASE BUILDING STRUCTURAL WORK.
   
04/01/20 
DISTRICT OF COLUMBIA / null
E2006294 / SUPPLEMENTAL
300 M ST SE   
04/02/20 
FEDERAL CENTER LP / CENTER; EDGE CONSTRUCTION
B2004640 / CONSTRUCTION
INTERIOR RENOVATION TO 4TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL, LIFE SAFETY AND STRUCTURAL HANGING PARTITION. 3500 SQUARE FEET. AMENTUM
139 N ST SE   
03/16/20 
PARCEL I FC ROWAN / MIGUEL RIOS; GRIFFIN DEWATERING, LLC
SB2000152 / CONSTRUCTION
Type of proposed System: Deep well dewatering system consisting of 16 wells around the perimeter of the shored excavation and 2 wells within the excavation in a mutually agreed layout. • Installation Method: Wells will be drilled up to 70’ deep, utilizing Griffin’s hollow stem auger drilling rig to drill up to a 10.25” I.D. borehole. Deep wells come complete with screen, casing, riser pipe and a s...
1299 NEW JERSEY AVE SE   
03/13/20 
FOREST CITY SEFC LLC / SARAH J. NAPIER
BCIV2000067 / CONSTRUCTION
Revisions to BCIV1800153. This submission is for approval stamps only. No change in work.
71 POTOMAC AVE SE   
03/27/20 
MRP RESIDENTIAL / KAYLA SHATTUCK; KAYLA SHATTUCK; PARADIGM CONTRACTORS LLC
BCIV2000036 / CONSTRUCTION
This permit is for site civil work at 71 Potomac Avenue SE including stormwater management and erosion & sediment control. See plans for more details.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.