Since January, 2003
            
 Sliding from Before to After

NBC4's Tom Sherwood did a piece today on CSX's plans to expand the Virginia Avenue Tunnel, and he focused on a to-be owner of a Capitol Quarter townhouse on Virginia Avenue (in the block between Third and Fourth, where foundation pouring is currently underway). There wasn't any real news in the piece for people who've been following the story recently, but it does highlight that that one block could really become a problem for CSX, and is perhaps an issue that no one had given much thought to. (But, in their defense, it's not like there was a five-year window when Virginia Avenue was completely deserted. Oh, wait....) I also wonder how the city agencies that will be new tenants at 225 Virginia will handle the impact of three years of construction outside their front door.
There still aren't any details posted online by CSX or the District about exactly how the Virginia Avenue Tunnel project will work (though we do have notes from their various recent public outreach sessions), but at a cost of about $140 million, it's not a small piece of the $842 million "National Gateway" project. In the documents that were part of the National Capital Region Transportation Planning Board vote on the project back in September, CSX described the Virginia Avenue Tunnel as a "bottleneck that when unlocked improves the freight efficiency and mitigates the expected freight growth in the region."
Comments (7)
   
 
 More About Capper

JDLand.com Home

Comments

I ST says: (11/17/09 9:04 PM)
I posted the below msg two weeks ago:

I ST says: (Nov 6, 2009 12:36 PM)
How will people living at Capitol Quarter in the northern most block along VA ave get into their homes? Both entrances to the block are off of VA Ave.

The CQ owners living on the northern block only have two car entrances and both are off VA Ave.

Glad it's getting some attention.


Mike McEleney says: (11/17/09 9:43 PM)
Capitol Riverfront BID announced tonight at the Lower 8th Street Visioning that CSX will brief the board on the Virginia Avenue project. Oddly they dont mention it on the agenda. At the visioning the host and facilitator seemed quite supportive of the CSX trench, but denied having a view.
link



Rob Lee says: (11/18/09 7:45 AM)
What is surprising is that not many people seem to know about this. I spoke with Phil at EYA and they had a meeting on Monday and will be meeting with CSX officials discussing options. This clearly could be a huge challenge for EYA. EYA said they just found out about the project last week. It seems that DC did not forward any of the proposals that have been in existence for 18 months according to CSX officials. As a result, I have started a public Google Group to help foster discussion related to this project and its impact on SE DC. The group home page can be found here: link


goober says: (11/18/09 8:17 AM)
Good job by Tommy Wells letting his constituents know what's going on. Maybe we're such new members in his ward he forgets we're here. But I'll bet he'll remember come election time.


MJM says: (11/18/09 8:37 AM)
I really hope a few people can hold this up and keep lots of traffic/trucks on the road and prevent more freight from moving through the area/East coast when the Panama Canal is expanded.

This will go through just like the metro did. Some people will have to adjust their lives a bit just like they did in the 70/80s with the metro dig and cover. I'm sure CSX will find a way to keep roads open while they do the construction near major intersections.

BTW, I think the construction was listed as 2-3 years not 3-4 years??


G St says: (11/18/09 10:36 AM)
Going to hard to sell those units I would think, unless you're a train nut. (OTOH, I have zero sympathy for DC government workers.)

Oh, well, that's the price we pay for the double-decker trains bringing more cheap goods from China to the Wally Worlds.


James says: (11/19/09 9:18 PM)
This is very unfortunate news. The only way I would support this is if they put all of 695 underground (from 2nd to 11th street) along with the second railroad track.

Any chance of this happening? Are the same agencies involved? I feel the community would be much more willing to deal with the construction if the underground highway was part of the deal.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

conngs0 on Tidbit Roundup: I second your motion, CJ!
CJBabyDaddy on Tidbit Roundup: As a pedestrian, I say we give sidewalk scooter jockeys a taste of their own med...
conngs0 on Tidbit Roundup: Walt, I like where your head is at. Before the folks currently living on Virgin...
walt on Tidbit Roundup: Is there any possibility that the SE/SW freeway will be removed in my lifetime? ...
walt on Tidbit Roundup: I was wondering if I was just old...I am still waiting for the 75 cent beers to ...
202_cyclist on Tidbit Roundup: Bom dia! We recently returned from a vacation in Portugal where the beers were ...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/15/19
100 B/O H ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/14/19
300 B/O TINGEY ST SE   ASSAULT WITH A DANGEROUS WEAPON  07/14/19
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 07/09/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/09/19
1100 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 07/08/19
300 B/O K ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/05/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/03/19
1200 B/O VAN ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/02/19
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/02/19
54 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/28/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/24/19
300 B/O K ST SE   HOMICIDE
Murder I
 06/22/19
50 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/21/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/21/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/20/19
100 B/O H ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 06/19/19
400 B/O M ST SE   THEFT
Shoplifting
 06/19/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 06/18/19
400 B/O M ST SE   THEFT
Shoplifting
 06/17/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 06/16/19
50 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/16/19

Recent Issued Building Permits Archive  
1100 2ND PL SE   
06/25/19 
SQUARE 769N OWNER LLC / THANOS VOREAS
EG1903573 / POST CARD
1212 4TH ST SE   
06/27/19 
FC 1212 LLC / MARK J. RHOTON
E1908902 / SUPPLEMENTAL
1000 5TH ST SE   
07/10/19 
JW ELECTRIC SERVICE / null
E1909222 / SUPPLEMENTAL
   
07/03/19 
UNITED STATES OF AMERICA / TANYA HILL; ALI NAIM
B1911904 / CONSTRUCTION
INSTALL NEW PARTITION AND DOOR IN EXISTING CLASSROOM TO MAKE TWO CLASSROOMS.
100 M ST SE   
06/19/19 
PARSONS / KENNY MERINO; NA
B1908795 / CONSTRUCTION
Interior Demolition and Renovation to 684 Sq Ft of work in order to reduce suite space.
   
07/12/19 
SQUARE 743 INC / KIM MITCHELL
D1900787 / CONSTRUCTION
INTERIOR DEMOLITION WITHIN AN OFFICE SPACE ON THE 9TH FLOOR (MULTI-TENANT FLOOR) IN AN EXISTING OFFICE BUILDING
250 M ST SE   
06/26/19 
BAKER DC LLC / CHRISTINE LONG
AH1901008 / CONSTRUCTION
An after hours permit is respectfully requested from 3AM to 7AM daily
139 N ST SE 20024   
07/12/19 
UNITED STATES OF AMERICA / PAUL E WARREN; PAUL E WARREN
E1909292 / SUPPLEMENTAL
640 SOUTH CAPITOL ST SE   
07/12/19 
CONSOLIDATED RAIL CORPORATION / HARIF BALOGUN; GEOCAPITAL ENGINEERING LLC GEOCAPITAL ENGINEERING
SB1900354 / CONSTRUCTION
We propose drilling six (6), six-inch diameter geotechnical test borings (B-1 to B-6) using the hollow stem auger method to evaluate the subsurface conditions. The proposed test boring depths will be 85 feet below the existing ground surface. If a confining unit is encountered, outer casing will be installed which will extend 10 feet into the top of the confining unit or to the top of bedrock.
300 TINGEY ST SE 170   
07/09/19 
FC BOILERMAKER LLC / GERALD ROPER
B1814633 / CONSTRUCTION
INTERIOR DEMOLITION AND RENOVATION ONLY. DEMOLITION TO INCLUDE REMOVAL OF EXISTING PARTITIONS, KITCHEN EQUIPMENT, AND FINISHES. NEW WORK TO INCLUDE NEW PARTITIONS, MILLWORK, FINISHES, KITCHEN EQUIPMENT (INCLUDING 1 NEW HOOD), AS WELL AS MINOR INTERIOR-ONLY MECHANICAL AND ELECTRICAL MODIFICATIONS. HVAC EQUIPMENT ON EXISTING OUTDOOR MECHANICAL MEZZANINE TO REMAIN. NO MODIFICATIONS TO EXISTING HISTO...
300 TINGEY ST SE   
06/26/19 
FC BOILERMAKER LLC / ADAM C. MARSON
M1903231 / SUPPLEMENTAL
   
07/12/19 
FC BOILERMAKER LLC / DOMINIC E TOTARO; DOMINIC E TOTARO
M1903450 / SUPPLEMENTAL
355 WATER ST SE   
07/10/19 
UNITED STATES OF AMERICA / JOHANNA DELONY
TN1900122 / CONSTRUCTION
Sterne Kessler Crab Feast--1 40'x 100' tent, with 372' of white picket fencing; no generators.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.