Since January, 2003
            
 Sliding from Before to After

Catching up from last week.... On Monday (Nov. 9), the Zoning Commission voted 5-0 to approve Florida Rock Properties' request for a two-year time extension on the 2008 zoning order for its RiverFront project at First and Potomac, across from Nationals Park. Citing the current Economic Difficulties, the developers requested the extension so that their deadline for securing building permits for the project's first phase (an office building on the east side of the site, near Diamond Teague Park) is now mid-2012, with a construction start date deadline of mid-2013. My RiverFront page gives all sorts of additional details on the project, if you need a refresher.
The Office of Planning supported the extension request (you can read their report for details), and zoning commissioners Hood and Turnbull both called the project a "good effort," mentioning how much work by the developers, the architect (Davis Buckley) and the commission had gone into the zoning order. (Those of you who haven't been around quite so long may not be aware that Florida Rock first began its long and winding road through the DC zoning process in the late 1990s.) This extension was supported by ANC 6D at its October meeting.
If you want to see the zoning hearing, you can go to the Office of Zoning's wonderful fabulous incredible Video on Demand section, where not only can you pick the meeting you wish to see but can then use their index to skip to the portion of the meeting you're interested in. I may never watch an entire public meeting live ever again!
Comments (0)
   
 
 More About Florida Rock
 All posts: Florida Rock, meetings, zoning

JDLand.com Home

Comments

No comments posted.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

202_cyclist on Hallo, Douglass Bridge: @JDC-- "If you don't know, now you know." -Notorious BIG/Rep. Hakeem ...
JNB on Hallo, Douglass Bridge: https://www.bizjournals.com/washington/news/2020/01/22/tenant-preleases-navy-yar...
jdc on Hallo, Douglass Bridge: A large construction trailer has appeared on the old GSA warehouse site. Not cle...
Jscott280 on Wednesday Tidbits: @sasq that is a bummer. I heard a tidbit on the retail coming to N Street, but w...
Sasq on Wednesday Tidbits: @Jscott280 and @AGH....went by Envy.... was told that closings will more likely ...
JD on Hallo, Douglass Bridge: Yes, he's working pretty hard these days.
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1255 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 01/19/20
400 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/17/20
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/14/20
1100 B/O 1ST ST SE   BURGLARY
Burglary One
 01/12/20
100 B/O L ST SE   ROBBERY  01/08/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/08/20
1100 B/O 2ND PLACE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/06/20
40 N ST SE   ROBBERY  01/05/20
1100 B/O 9TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/03/20
139 N ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 01/02/20
100 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/02/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/31/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/30/19
UNIT B/O M ST SE   BURGLARY
Burglary Two
 12/30/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/29/19
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/28/19
500 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/28/19
700 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 12/28/19
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/27/19
300 B/O VIRGINIA AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/27/19
1220 HALF ST SE   BURGLARY
Burglary Two
 12/27/19
300 B/O WATER ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/26/19
900 B/O NEW JERSEY AVE SE   BURGLARY
Burglary Two
 12/25/19
2 I ST SE   THEFT
Theft 2nd Degree (all Other Larceny) - Highway/ Road/ Alley/ Street/ Sidewalk
 12/24/19
2 I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle) - Highway/ Road/ Alley/ Street/ Sidewalk
 12/23/19
UNIT B/O POTOMAC AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle) - Highway/ Road/ Alley/ Street/ Sidewalk
 12/22/19

Recent Issued Building Permits Archive  
909 4TH ST SE   
12/30/19 
MEREDITH FASCETT / KYLE YOST
SOL2000550 / CONSTRUCTION
rooftop solar pv system, less than 4' above roof
1300 4TH ST SE 912   
01/07/20 
DEBORAH J ISRAEL / DORIS A MINOR; DORIS A MINOR
B2003615 / CONSTRUCTION
REPLACE KITCHEN CABINETS
900 5TH ST SE   
01/10/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / WILLIAM ANDERSON; WILLIAM ANDERSON
P2002846 / SUPPLEMENTAL
   
01/17/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / WILLIAM B. CRIST; WILLIAM B. CRIST
E2003759 / SUPPLEMENTAL
82 I ST SE   
01/15/20 
GDVC EYE ST LLC / MARK G. MILLS; MARK G. MILLS
E2003664 / SUPPLEMENTAL
150 I ST SE   
01/16/20 
SQUARE 737 LLC / JASON D DORRIS
AH2000499 / CONSTRUCTION
Construction of a new 13 story apartment building with three below grade parking levels, 1st floor retail and amenity areas; 375 units and 181 parking spaces. To include mechanical, electrical, plumbing, elevators and structural work.
415 I ST SE   
01/10/20 
MEGHAN E RILEY / DAEHO PARK; DAEHO PARK
P2002836 / SUPPLEMENTAL
300 M ST SE   
01/03/20 
FEDERAL CENTER LP / null
E2003217 / SUPPLEMENTAL
111 N ST SE   
01/17/20 
ALAN OWINGS / CRAIG KUBICZ
BCIV1900068 / CONSTRUCTION
The proposed construction on Parcel H consists of a new curb cut off of N Place, a guard house, and resurfacing of the eastern portion of the parking lot. The two existing storm inlets in the parking lot will be removed and replaced by a bioretention facility. DOEE SWMP No. 6343: N Place and First Street SE
861 NEW JERSEY AVE SE   
12/31/19 
CONSOLIDATED RAIL CORPQ / null
E2003162 / SUPPLEMENTAL
   
12/31/19 
DISTRICT OF COLUMBIA / JANE MCCRAY
AH2000399 / CONSTRUCTION
Pepco will be splicing cable at 861 New Jersey Avenue, SE, from 9PM to 7AM, Monday thru Friday.
   
01/03/20 
CSX TRANSPORTATION INC / SUSANA VAZQUEZ; JOHN MORIARTY & ASSOCIATES OF VIRGINIA LLC
TC2000014 / CONSTRUCTION
Tower Crane
1100 NEW JERSEY AVE SE 1ST FL   
01/06/20 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2003296 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
12/30/19 
SQUARE 742 LLC / RYAN FITZGERALD; NEXIUS SOLUTIONS, INC.
AN2000023 / CONSTRUCTION
AT&T proposes to replace (3) existing antennas with (3) new antennas and install (3) new antennas.
   
01/02/20 
SQUARE 742 LLC C/O WCSMITH / PATRICIA J STAUB; CDH CONSTRUCTION INC
B2001972 / CONSTRUCTION
Provide Landlord Work (warm white shell) for Tenant buildout of 1827 SF.
   
01/07/20 
SQUARE 742 LLC / ;
P2002715 / SUPPLEMENTAL
   
01/08/20 
SQUARE 742 LLC / null
P2002765 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
01/03/20 
MILLER AND LONG / WILLIAM MOORE; MILLER LONG
TC2000016 / CONSTRUCTION
towercrane for jobsite use 1 / 25 / 2020 to 1 / 25 / 2021
71 POTOMAC AVE SE   
01/15/20 
RIVERFRONT HOLDINGS I, LLC / null
E2003671 / SUPPLEMENTAL
   
01/17/20 
MRP REALTY / JAMES VANEGAS
AH2000410 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building. **No loud equipment is to be used until 9am on this day.
355 WATER ST SE   
12/30/19 
UNITED STATES OF AMERICA / KELSI EVANS
TN2000035 / CONSTRUCTION
1 40' x 80 tent
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.