Since January, 2003
            
 (a random before-and-after moment)
May 20, 2006
August 5, 2017
South Capitol at M, Looking South (see more)

* Tomorrow (Thursday, May 28) at 10:30 am is the groundbreaking ceremony for the Park at the Yards, the first phase of which is scheduled to be completed next spring. The mayor is supposed to be in attendance--I may have to create a Shovel-Wielding Fenty photo gallery, since I now have quite a few of those shots.
* Friday (May 29) at noon is the opening of Artomatic at 55 M Street. I'm giving everyone advance warning that I am hopelessly left-brained, so I won't really even be trying to cover it much beyond wandering through to get the flavor. It runs until July 5, so everyone has plenty of time to get there and check it out. (You can see some of the installations already through the windows.) See my calendar for the specific days and hours (it's closed Mondays and Tuesdays).
* An extremely helpful commenter in this thread has explained why some of the flyovers and ramps are missing from the new Skanska/Facchina schematic of the new 11th Street Bridges design that I linked to: "[It] does not show all the ramp connections in the FEIS design because the District could only find $260 million to fund the project, and the FEIS design is estimated to cost $360 million. The District asked for proposals to build as much of the project as possible for the availible $260 mill, and the schematic shows how much the winning bidder Skanska/Facchina proposed to build. It is a lane-mile more than the next best proposal. The District's plan is to build the rest when they can secure funding (maybe sooner than later.)"
* While not mentioning Near Southeast specifically, this Post article from yesterday talks about the very tough office-space market in DC and surroundings: "'Unless they're already in the ground, they're not starting,' said Steven A. Levin, managing director at Spaulding & Slye. 'Any development project needing a loan over $25 million requires multiple lenders, and the guarantees are onerous. The amount of money you can borrow is also reduced.' [...] Dennis K. Moyer, a commercial real estate lawyer with Goulston & Storrs, said some of his clients are reviewing their existing loans and wondering whether they'll be paid, even on properties that are doing well. 'The next wave that comes is likely the workouts, foreclosures and restructurings,' he said."
Comments (1)
   
 
 More Recent News

JDLand.com Home

Comments

G St says: (5/28/09 9:00 AM)
"Shovel-Wielding Fenty photo gallery"? It's good to be king! (-:

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

202_cyclist on Tidbits: SWneighbor— here is the company that provides the balloons for construction phot...
202_cyclist on Tidbits: https://gizmodo.com/up-in-the-air-using-tethered-balloons-to-photograph-th-15688...
SWneighbor on Tidbits: What is a construction blimp?
GarfieldPark on Tidbits: UPS store is a great addition to the hood, one that I wouldn't even have thought...
walt on Tidbits: Anybody have any hints/advice for going to watch the Apollo 50 display tonight o...
walt on Tidbits: Tried El Bebe last night and I was FLOORED by how good the cauliflower taco was....
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/18/19
1000 B/O 5TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/17/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/17/19
1400 B/O SOUTH CAPITOL ST   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/16/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/15/19
100 B/O H ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/14/19
300 B/O TINGEY ST SE   ASSAULT WITH A DANGEROUS WEAPON  07/14/19
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 07/09/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/09/19
1100 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 07/08/19
300 B/O K ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/05/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/03/19
1200 B/O VAN ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/02/19
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/02/19
54 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/28/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/24/19
300 B/O K ST SE   HOMICIDE
Murder I
 06/22/19
50 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/21/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/21/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/20/19
100 B/O H ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 06/19/19
400 B/O M ST SE   THEFT
Shoplifting
 06/19/19

Recent Issued Building Permits Archive  
1100 2ND PL SE   
06/25/19 
SQUARE 769N OWNER LLC / THANOS VOREAS
EG1903573 / POST CARD
1212 4TH ST SE   
06/27/19 
FC 1212 LLC / MARK J. RHOTON
E1908902 / SUPPLEMENTAL
1000 5TH ST SE   
07/10/19 
JW ELECTRIC SERVICE / null
E1909222 / SUPPLEMENTAL
   
07/03/19 
UNITED STATES OF AMERICA / TANYA HILL; ALI NAIM
B1911904 / CONSTRUCTION
INSTALL NEW PARTITION AND DOOR IN EXISTING CLASSROOM TO MAKE TWO CLASSROOMS.
100 M ST SE   
07/12/19 
SQUARE 743 INC / KIM MITCHELL
D1900787 / CONSTRUCTION
INTERIOR DEMOLITION WITHIN AN OFFICE SPACE ON THE 9TH FLOOR (MULTI-TENANT FLOOR) IN AN EXISTING OFFICE BUILDING
250 M ST SE   
06/26/19 
BAKER DC LLC / CHRISTINE LONG
AH1901008 / CONSTRUCTION
An after hours permit is respectfully requested from 3AM to 7AM daily
   
07/17/19 
BAKER DC LLC / CHRISTINE LONG
AH1901077 / CONSTRUCTION
An after hours permit is respectfully requested from 3AM to 7AM daily
139 N ST SE 20024   
07/12/19 
UNITED STATES OF AMERICA / PAUL E WARREN; PAUL E WARREN
E1909292 / SUPPLEMENTAL
640 SOUTH CAPITOL ST SE   
07/12/19 
CONSOLIDATED RAIL CORPORATION / HARIF BALOGUN; GEOCAPITAL ENGINEERING LLC GEOCAPITAL ENGINEERING
SB1900354 / CONSTRUCTION
We propose drilling six (6), six-inch diameter geotechnical test borings (B-1 to B-6) using the hollow stem auger method to evaluate the subsurface conditions. The proposed test boring depths will be 85 feet below the existing ground surface. If a confining unit is encountered, outer casing will be installed which will extend 10 feet into the top of the confining unit or to the top of bedrock.
300 TINGEY ST SE 170   
07/09/19 
FC BOILERMAKER LLC / GERALD ROPER
B1814633 / CONSTRUCTION
INTERIOR DEMOLITION AND RENOVATION ONLY. DEMOLITION TO INCLUDE REMOVAL OF EXISTING PARTITIONS, KITCHEN EQUIPMENT, AND FINISHES. NEW WORK TO INCLUDE NEW PARTITIONS, MILLWORK, FINISHES, KITCHEN EQUIPMENT (INCLUDING 1 NEW HOOD), AS WELL AS MINOR INTERIOR-ONLY MECHANICAL AND ELECTRICAL MODIFICATIONS. HVAC EQUIPMENT ON EXISTING OUTDOOR MECHANICAL MEZZANINE TO REMAIN. NO MODIFICATIONS TO EXISTING HISTO...
   
07/16/19 
FC BOILERMAKER LLC / HEE YEOL HWANG; HEE YEOL HWANG
E1909416 / SUPPLEMENTAL
   
07/17/19 
FC BOILERMAKER LLC / ;
P1907864 / SUPPLEMENTAL
300 TINGEY ST SE   
06/26/19 
FC BOILERMAKER LLC / ADAM C. MARSON
M1903231 / SUPPLEMENTAL
   
07/12/19 
FC BOILERMAKER LLC / DOMINIC E TOTARO; DOMINIC E TOTARO
M1903450 / SUPPLEMENTAL
   
07/15/19 
FC BOILERMAKER LLC / HEE YEOL HWANG; HEE YEOL HWANG
E1909370 / SUPPLEMENTAL
   
07/18/19 
FC BOILERMAKER LLC / ;
P1907922 / SUPPLEMENTAL
355 WATER ST SE   
07/10/19 
UNITED STATES OF AMERICA / JOHANNA DELONY
TN1900122 / CONSTRUCTION
Sterne Kessler Crab Feast--1 40'x 100' tent, with 372' of white picket fencing; no generators.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.