Since January, 2003
            
 Page Through from Before to After

I'm still here, though perhaps you can't see through the large tumbleweeds currently blowing across the JDLand.com landscape. There just hasn't been hardly any news of late, and in a strange way, the less news there is, the harder it is for me to carve out time from real life (where a couple big projects are consuming much of my time) to do the deeper digging. Plus, I'm on strike from taking photos until the weather gets warmer.
That being said, I can report (h/t to reader E. and the 55 M construction cam) that the new sidewalks around 55 M are starting to go in. There's also some utility work being done across Half at the bus garage to prepare for its demolition. The web cam also has a view of the back of the Red Porch restaurant at the ballpark, where I'm keeping an eye on when the upgrades might start to that space.
Speaking of sidewalks, there's some very nice public space work being done at 909 New Jersey, with a combination of concrete and brick sidewalks being put in along New Jersey (along with the front steps to the building). And anyone who's been close to Near Southeast at night has now seen the blue lights that run along the top of the building's "bow." (They match the color of the lights on the Douglass Bridge.)
And Capitol Quarter framing work has now made the turn up Fourth Street north of L.
If the lack of news is bumming you out, you can always go back and read what was happening this time last year. It was *slightly* busier, as we were hitting the final weeks before the opening of the ballpark. Then again, if we go way back, to February 2004, I posted one entry for the entire month. (I'm just now realizing there's no easy access to the monthly archive of blog entries from the home page--but if you look down the right margin of any "interior" page on the site, you'll see the "Browse by Month" links.)
Comments (5)
   
 
 More About Monument Valley/Half St.

JDLand.com Home

Comments

Ed kaminski says: (2/25/09 3:13 PM)
JD, I noticed some demolition work in progress on the buidlings behind the 7/11 on S. Capitol

Ed


JD says: (2/25/09 3:17 PM)
That's the other side of South Capitol Street, which is now dead to me. :-) (I posted a few weeks back that I'm going back to my old boundaries, and no longer watching projects on the west side of South Capitol Street, since there's now two blogs that cover Southwest.)



SWIll says: (2/26/09 12:18 AM)
Ed,
The demolition of those buildings will make way (at least temporarily) for a shiny new parking lot, which should be open in time for Opening Day at Nationals Park. Eventually, the 7-Eleven will close and that block (minus the former KFC/Taco Bell) will be developed by Vornado - most likely as a mixed-use project.

Here's a "Did you know" factoid about Near SE...I'm not sure if JD has mentioned this before, but did you know that the 2000 movie Hollow Man was filmed partially at The Yards?



G St. says: (2/26/09 9:56 AM)
Those new townhouses seem to be growing by leaps and bounds...


Bruce says: (2/26/09 2:04 PM)
And the busses remain!!...yikes.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

202_cyclist on Super Tuesday Tidbits: 2-story retail is such a waste for the 1299 First Street lot.
CJBabyDaddy on Super Tuesday Tidbits: @JES: With all the stress and anxiety we’re enduring, you had to go rub salt in...
202_cyclist on Super Tuesday Tidbits: Gary— yes, they play that and He revelry every morning at the Navy Yard. Someti...
JES on Super Tuesday Tidbits: @NWtoSE I just saw "Coming 2019 Showplace ICON theatre" on the map in ...
NWtoSE on Super Tuesday Tidbits: https://www.mgaco.com/spaces/lease-sale/1299-1st-st-se
NWtoSE on Super Tuesday Tidbits: @JScott280- I don't think they have a tenant, but the developer plans to build a...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 1ST ST SE   THEFT
Theft First Degree (all Other Larceny)
 04/07/20
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/28/20
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/23/20
1500 B/O SOUTH CAPITOL ST SE   THEFT
Shoplifting
 03/11/20
200 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/09/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 1001   
03/16/20 
LA FAMOSA LLC / null
P2004796 / SUPPLEMENTAL
   
03/20/20 
LA FAMOSA LLC / null
E2005975 / SUPPLEMENTAL
1300 4TH ST SE 1006   
03/16/20 
LA FAMOSA LLC / null
M2001859 / SUPPLEMENTAL
1300 4TH ST SE   
03/13/20 
LA FAMOSA LLC / KIMOY LALLEMENT; POTOMAC CONSTRUCTION SERVICES
TL2000028 / CONSTRUCTION
New tenant layout for commercial kitchen, two restrooms, point of sale bar, and dining seating, new lighting and mechanical zones. 2,338 sf INDOOR OCCUPANCY: 84 PERSONS WITH 59 SEATS OUTDOOR OCCUPANCY: 38 PERSONS WITH 38 SEATS TOTAL MAX OCCUPANCY: 122
900 5TH ST SE   
03/24/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KAYLA TRICE; DELAWARE
EN2001608 / SHOP DRAWING
Install 3 new hydraulic passenger elevators
200 I ST SE   
03/17/20 
DISTRICT OF COLUMBIA / LEIA TERRELL
B2006382 / CONSTRUCTION
Tenant Alterations of existing office doors and wall. Including relocation of existing electrical, and mechanical terminals. NO CHANGE OF EGRESS, USE OF OCCUPANCY, NO EXTERIOR LAND DISTURBANCE, NO BASE BUILDING STRUCTURAL WORK.
   
04/01/20 
DISTRICT OF COLUMBIA / null
E2006294 / SUPPLEMENTAL
300 M ST SE   
04/02/20 
FEDERAL CENTER LP / CENTER; EDGE CONSTRUCTION
B2004640 / CONSTRUCTION
INTERIOR RENOVATION TO 4TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL, LIFE SAFETY AND STRUCTURAL HANGING PARTITION. 3500 SQUARE FEET. AMENTUM
139 N ST SE   
03/16/20 
PARCEL I FC ROWAN / MIGUEL RIOS; GRIFFIN DEWATERING, LLC
SB2000152 / CONSTRUCTION
Type of proposed System: Deep well dewatering system consisting of 16 wells around the perimeter of the shored excavation and 2 wells within the excavation in a mutually agreed layout. • Installation Method: Wells will be drilled up to 70’ deep, utilizing Griffin’s hollow stem auger drilling rig to drill up to a 10.25” I.D. borehole. Deep wells come complete with screen, casing, riser pipe and a s...
1299 NEW JERSEY AVE SE   
03/13/20 
FOREST CITY SEFC LLC / SARAH J. NAPIER
BCIV2000067 / CONSTRUCTION
Revisions to BCIV1800153. This submission is for approval stamps only. No change in work.
71 POTOMAC AVE SE   
03/27/20 
MRP RESIDENTIAL / KAYLA SHATTUCK; KAYLA SHATTUCK; PARADIGM CONTRACTORS LLC
BCIV2000036 / CONSTRUCTION
This permit is for site civil work at 71 Potomac Avenue SE including stormwater management and erosion & sediment control. See plans for more details.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.