Since January, 2003
            
 Page Through from Before to After

Pulling together some reminders and other recent Twittered tidbits:
* This Sunday is NatsFest at the ballpark, from 1 pm to 5 pm. It's being held indoors in the various club areas, so if you've never gotten to see some of the lounges, or the conference center, or the clubhouse, this might be a good opportunity. Season-ticket holders get four free tickets; for the rest of the world it's $10 for adults and $5 for children under 12.
* Last week a raze permit was issued for the defunct Wendy's on I Street. No word on when demolition will actually occur. This is where JPI is planning its fourth Capitol Yards apartment building, 23 I Street, but there's been no recent intelligence on when they might decide to get underway.
* Construction hasn't yet begun on the Park at the Yards, but some additional information and more detailed renderings should be coming to light over the next month. Forest City is scheduled to make presentations to the National Capital Planning Commission on Feb. 5, and the Commission on Fine Arts on Feb. 16, and possibly ANC 6D on Feb. 9.
* A reader is reporting this morning that a derrick crane is going up at Diamond Teague Park--perhaps that's to begin work on the water taxi piers. (Though note that there was already a crane of some sort there back in December when I took these photos.)
* Apparently the various property owners surrounding the section of Eighth Street south of the freeway have gotten together along with the Capitol Riverfront BID to start working on plans to perk up the area, using the Connect Barracks Row report by University of Maryland Urban Studies and Planning students as a jumping-off point. Look for public meetings in February-ish.
Comments (1)
   
 
 More About Nationals Park

JDLand.com Home

Comments

Kenny says: (1/22/09 10:12 PM)
was in the neighborhood today and i can't believe how far this place has come in the past three years! looks good. keep up the excellent work!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJBabyDaddy on I'm Dreaming of: Two things everybody might agree on: A popular 24-hour diner somewhere in the ‘...
VelocityChris on I'm Dreaming of: Agreed JES, 24 hour diner would be perfect! To add another decent DC diner, Ari'...
CJBabyDaddy on I'm Dreaming of: @RMP: If anyone’s organizing a GoFundMe for more of those awesome crosswalk-blo...
JES on I'm Dreaming of: an "urban style" IHOP or waffle house down here would be awesome, main...
jdc on I'm Dreaming of: I love Silver Diner, but I find it does not quite have the greasy spoon feel tha...
JD on I'm Dreaming of: For NJ-type diners there's Metro 29 in Arlington and Amphora in Vienna. Silver a...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1402 1ST ST SE   
11/25/19 
UNITED STATES OF AMERICA / DAVID C POSTLEWAITE
SB1900412 / CONSTRUCTION
Parcel G2:WSP will complete four borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). The proposed boring locations would be in the four quadrants of Parcel G2 to check for spatial variability in contaminant concentrations. WSP will collect and analyze three soil samples from each boring from depths corresponding to potential subgrade elevations (i.e. 10-12 ft. bgs, 20-22 ...
1212 4TH ST SE   
11/25/19 
FC 1212 LLC / TAMIKA STATON; OTIS
ER2000409 / SHOP DRAWING
Replace governor car #2 - Part #: TBA20641H6 Replace hoist belts #1 and #4 - Part #: SB0003119
1300 4TH ST SE   
12/06/19 
ASANA PARTNERS / S.A. COMUNALE; S.A. COMUNALE
P2001954 / SUPPLEMENTAL
1346 4TH ST SE   
12/06/19 
KAITLYNN MATTEO / W. SAKIE - BHAR; W. SAKIE - BHAR; NA
SG2000117 / CONSTRUCTION
Install one set of non illuminated sign on to existing store front building
   
12/12/19 
FC 1346 HOLDCO I L L C / ;
P2002122 / SUPPLEMENTAL
82 I ST SE   
12/13/19 
GDVC EYE STREET LLC / ALYSSA CARRABIS; IRON FISH CONSTRUCTION IRON FISH CONSTRUCTION
B2002764 / CONSTRUCTION
SCOPE OF WORK: CONSTRUCTION OF A NEW 120 SQSF CLOSET SPACE WITHIN AN EXISTING PARKING GARAGE. NO CHANGE IN EGRESS OR PATH OF TRAVEL. MAINTAIN UNOBSTRUCTED PATH OF EGRESS AS REQUIRED BY CODE THROUGH CONSTRUCTION.
408 L ST SE   
12/11/19 
JOSEPH LEBLANC / KYLE YOST
SOL2000412 / CONSTRUCTION
rooftop solar pv system, less than 4' above roof
   
12/13/19 
JOSEPH F LEBLANC / null
E2002722 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
11/26/19 
GREYSTAR GP I I, LLC / KIM MITCHELL; KIM MITCHELL
FD1900040 / CONSTRUCTION
TWO BELOW GRADE PRKING LEVELS, CONCRETE FOUNDATION WALLS, SLAB ON GRADE, COLUMNS ELEVATED DECKS UP TO GRADE WITH UNDERGROUND UTILITIES (MECHANICAL, PLUMBING, ELECTRICAL)
   
12/05/19 
MIKE ALLEN / JANE MCCRAY
AH2000244 / CONSTRUCTION
WO# 1611441 - Mike Allen / P. Helgeson. Pepco to install network transformer
   
12/12/19 
CXS PROPERTIES GROUP / CHARLES C. BAKER; CHARLES C. BAKER
P2002143 / SUPPLEMENTAL
125 O ST SE   
11/25/19 
DISTRICT OF COLUMBIA / DAVID C POSTLEWAITE
SB1900411 / CONSTRUCTION
WSP will complete three borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). WSP assumes that borings will not be installed inside the fleet maintenance facility due to access restrictions imposed by DC Water. The proposed boring locations form an ‘L’ shape around the eastern and southern sides of the fleet maintenance facility. WSP will collect and analyze three soil samp...
71 POTOMAC AVE SE   
12/06/19 
MPR REALTY / BOB BIROONAK; BOB BIROONAK; ART DISPLAY CO
SG2000099 / CONSTRUCTION
One building name MAREN Two set of address numbers all signs are non-illuminated
227 TINGEY ST SE   
12/02/19 
FC 227 LLC / KAYLA SHATTUCK; BROOKFIELD PROPERTIES MANAGEMENT LLC.
RW1900122 / CONSTRUCTION
Construction of new retaining wall located between Canal Street St and Third Street, SE.
300 TINGEY ST SE   
12/04/19 
FC BOILERMAKER LLC / ROBERT S. WATTS; ROBERT S. WATTS
E2002289 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.