Since January, 2003
            
 (a random before-and-after moment)
August 18, 2007
August 5, 2017
Cushing at N, Looking South-Southeast (see more)

On Tuesday night the Office of Planning and the Deputy Mayor's office held a third public meeting as part of the planning process undertaken this year for Boathouse Row, the stretch of land along the western shore of the Anacostia from the 11th Street Bridges upstream. Much of this area has been owned and managed by the federal government for years and years, but is part of the batch of parcels being transferred back to DC (and on Thursday the mayor will be announcing was supposed to be announcing that this swap is finally complete, but the event has been postponed because of a scheduling issue with the Secretary of the Interior). With the District preparing to take control of the property, and with the Anacostia Waterfront Initiative looking to transform the city's relationship with the river, it was decided to take a step back and do some "visioning" of what this area could be if given the proper TLC. (Michael Durso of DMPED also took great pains to emphasize that there are no plans to dispose of this land to developers or other interests.)
One big surprise for this newcomer was that the city does not expect to begin any of the transformation of this area for another *ten* years or so, given the constraints of large close-by projects starting in the next few years such as the 11th Street Bridges rehabilitation, remediation of the contaminated Washington Gas site east of 12th Street, and WASA's Deep Tunnel project. (And I will admit that hearing that ten-year timeframe made me feel a little less bad about having come to this planning process so late in the game!)
Also, the slides from the Tuesday meeting aren't yet posted online, so I think I will wait to delve into the details of all of this until those are available. But the study has now boiled down the wants and needs of various stakeholders into two concept alternatives, one of which imagines a $38 million project, $23 million of which would be dredging to allow for deeper-water boats farther up river (at least, that's how this non-boating-savvy blogger understood it), and the other which determines uses of the riverfront and the water if dredging does not take place, at a cost of about $13 million. Both concepts incorporate sustainable design, linked open spaces allowing for activities such as picnic areas, and amenities and shared uses like a small canteen and bike racks (and perhaps a bike rental oulet).
It's expected that the final report will be released in early January, followed by a 30-day comment period.
In the meantime, the operations of the Anacostia Community Boathouse Association will be moving from its spot in between the 11th Street Bridges spans to the marina just east of the Pennsylvania Avenue/Sousa Bridge (outside my boundaries!) in 2009; both Boathouse Row design concepts have ACBA returning after the bridge work is completed, perhaps with an expanded presence on the land just east of the bridges.
(Also, for people interested in the planned "boulevardization" of the old Southeast Freeway lanes that run from 11th Street to Barney Circle: it was mentioned that this project probably won't happen for another 10 years. But the planners did do some blue-skying of how this work--and perhaps the relocation of the CSX rail lines that also cut off Boathouse Row from its neighbors--could someday allow for this isolated patch of land to be reconnected to Capitol Hill and the rest of the city.)
Comments (2)
   
 
 More About 11th Street Bridges

JDLand.com Home

Comments

G St. says: (12/18/08 3:31 PM)
As long as they clean up the tires, trash and dead bodies strewn around there, this could be a nice area to visit... when all is said and done.


Rick says: (12/23/08 7:19 PM)
JD

Thanks for the update. The 10 year time from just reinforces my rant a few weeks back about those of use who rented slips and storage space at one of the marinas getting kicked out with less than 30 days notice.

As one who has been on that end of Water Street for years, I'm not sure where the impression about trash, tires, and dead bodies comes from.

Rick

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts

NavyYardNittany on June Construction Update: All in on the #stoptheyellowbrick campaign. Don’t know why but it screams 1988 t...
GarfieldPark on New SE-SW Circulator: In Eastern Market news, that Sephora has an opening date of 7/13/18. My wife pla...
RMP on New SE-SW Circulator: Those of us over on the east-side of the neighborhood can walk over to 8th St to...
JD on New SE-SW Circulator: Or change Circulators at Eastern Market. There's still one that goes to Union St...
202_cyclist on New SE-SW Circulator: Also, with the new dog park across the street from Whole Foods (opening fall 202...
202_cyclist on New SE-SW Circulator: JD— you’re going to make my wife’s blood boil with this post. We’re going to ha...
  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O VIRGINIA AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/18/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/16/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/11/18
1100 B/O 8TH ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/10/18
UNIT B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/09/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/06/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/29/18
1000 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/28/18
1100 B/O 10TH ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/26/18
1100 B/O 9TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/25/18
UNIT B/O I ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/25/18

Recent Issued Building Permits Archive  
1100 2ND PL SE   
06/19/18 
CAPPER CARROLLSBURG VENTURE LLC / null
E1807795 / SUPPLEMENTAL
1018 3RD ST SE   
06/06/18 
DAVID A LEINER / SCOTT STERL
F1800474 / CONSTRUCTION
REPLACEMENT OF AN EXISTING CHAIN LINK FENCE TO A WOODEN FENCE 6FT. TALL.
1212 4TH ST SE   
06/06/18 
null / THAIS NA PEACHER
EHOP18924304 / HOME OCCUPATION
100 H ST SE   
06/19/18 
DISTRICT OF COLUMBIA / RUSSELL COX
FD1800083 / CONSTRUCTION
Construction of foundation only
101 H ST SE   
06/05/18 
SQUARE 737 LLC / JOHN SONNER 4438727277
E1807389 / SUPPLEMENTAL
   
06/06/18 
SQUARE 737 LLC / null
P1806501 / SUPPLEMENTAL
2 I ST SE   
05/31/18 
CRESCENT CAPITOL VIEW / null
E1807278 / SUPPLEMENTAL
4 I ST SE   
06/18/18 
CRESCENT COMMUNITIES / KIM MITCHELL
B1804349 / CONSTRUCTION
VELOCITY - 4 I ST SE- IS THE PHASE II OF A MIXED-USE RESIDENTIAL PROJECT LOCATED AT 2 I ST SE. IT SITS AT TE CORNER OF I ST & SOUTH CAPITOL ST SE. PHASE II CONSIST OF 184 RESIDENTIAL UNITS AND ROUGHLY 3,800 SF OF RETAIL ON 1ST FLOOR FACING I STREET. TWO LEVELS OF UNDERGROUND PARKING GARAGE SERVES BOTH PHASES OF THE PROJECT. BUILDING HEIGHT IS 130 FEET. INCLUDING 3 ELEVATORS.
202 M ST SE   
05/29/18 
null
E1807211 / SUPPLEMENTAL
   
05/29/18 
null
P1806323 / SUPPLEMENTAL
100 M ST SE   
06/05/18 
SQUARE 743 INC / ROBERT L HUNTER 703-404-0303
M1802631 / SUPPLEMENTAL
202 M ST SE   
05/31/18 
UNITED STATES OF AMERICA / null
P1806387 / SUPPLEMENTAL
   
06/22/18 
UNITED STATES OF AMERICA / DAVID BERUBE
TN1800146 / CONSTRUCTION
40'x60' and 16'x16' tent for a private event not open to public. Event to take place during daylight hours between 1130 and 1630.
300 M ST SE   
06/01/18 
FEDERAL CENTER LP / SAM HOLLEN
B1809520 / CONSTRUCTION
INTERIOR RENOVATION TO 8TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING OR STRUCTURAL. 860 SQUARE FEET. STRATEGIC INSIGHT
410 M ST SE   
05/30/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / SCOTT NICHOLS
AN1800023 / CONSTRUCTION
AT&T proposes to add three new antennas to an existing rooftop telecommunications facility.
1115 NEW JERSEY AVE SE   
06/07/18 
DONOHOE REAS ESTATE SERVICES / null
E1807467 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE 20003   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807687 / SUPPLEMENTAL
   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807698 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE 20001   
06/21/18 
GALLERY CAPITOL RIVERFRON PROPERTY / null
P1806901 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
06/12/18 
GALLERY CAPITOL WATERFRONT PROPERTY LLC / null
P1806653 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
06/12/18 
SQUARE 742 LLC / CLIFFORD DIXON
B1807730 / CONSTRUCTION
REVISION: REVISE B1804348 5TH FLOOR OFFICE SPACE TO EXTEND THE OFFICE INTO ADDITIONAL SPACE TO CREATE A LARGER OPEN OFFICE
1200 NEW JERSEY AVE SE 20590   
06/20/18 
JBG/FEDERAL CENTER LLC / ALFRED F JORDAN 202-437-5067
E1807865 / SUPPLEMENTAL
71 POTOMAC AVE SE   
05/30/18 
FORIDA ROCK PROPERTIES INC / ANKIT K SINGH
UT1800044 / CONSTRUCTION
Removal of an Underground storage Tank (UST) 7 feet in diameter and approximately 16 feet long (approximately 6,000 gallons). Suspected Fuel Tank. Tank is filled with water and soil. Tank will be cleaned, removed and disposed off as per the appropriate standards and requirements.
221 TINGEY ST SE   
06/05/18 
GONE YARD HOTEL OWNER LLC / MITCH PERMUY 7272100491
E1807017 / SUPPLEMENTAL
227 TINGEY ST SE   
05/31/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806388 / SUPPLEMENTAL
(2) Backwater valve
   
06/07/18 
UNITED STATES OF AMERICA / MICHAEL ERIC CAMPBELL 571-229-1360
M1802664 / SUPPLEMENTAL
Equipment Manufacturer Equipment Model AAON DOAS, RTU and AHU DAIKIN VRF and split systems DESERT AIRE LC06R7NFDDMLAERD
   
06/07/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806553 / SUPPLEMENTAL
REVISION TO P1806388. IN LIEU OF 753 SINKS SHOULD READ 264 SINKS, 489 BASINS
   
06/18/18 
UNITED STATES OF AMERICA / MITCH PERMUY 7272100492
E1807256 / SUPPLEMENTAL
300 TINGEY ST SE   
06/04/18 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS 443-532-0991
M1802615 / SUPPLEMENTAL
   
06/04/18 
FC BOILERMAKER LLC / null
P1806437 / SUPPLEMENTAL
   
06/05/18 
FC BOILERMAKER LLC / CARLOS E. MONTES
P1806464 / SUPPLEMENTAL
355 WATER ST SE   
06/14/18 
UNITED STATES OF AMERICA / EDUARDO LOPEZ 2023884000
E1807680 / SUPPLEMENTAL
355 WATER ST ST SE   
06/13/18 
UNITED STATES OF AMERICA / KIMBERLY SPEED
TN1800127 / CONSTRUCTION
The Great Lawn at Yards Park will be the site of the California State Society Annual Summer Picnic. The contract specifies the licensee to obtain permits for tents and generators on the lawn. The large tent is 100 x 40 - which I have the Certificate of Flame Resistance), as well as a generator. I have the generator specifications from the distributor.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.