Reader M., who keeps a better eye on the Monument Half Street web cam than I do, has passed along the word that, within the past week, the Half Street Hole (just north of Nationals Park) has started being re-filled with dirt, except for the far northern portion where additional underground garage space next to the 55 M Street office building is being completed. The small piece of garage construction is where a new street dubbed "Monument Street" has been planned, to connect Half to Cushing Street to the east; doing this work also will now give southern walls to the 55 M garage. The rest of the block is where Monument had plans for a 200-room hotel and 340 residential units, along with lots of ground-floor retail. I don't know anything beyond what I'm seeing on the webcam, so we'll have to wait to find out What This Means (though certainly filling back in a three-story hole isn't particularly likely to indicate a project moving forward).
Comments (7)
   
 
 More About Monument Valley/Half St.

JDLand.com Home

Comments

SG says: (11/24/08 12:02 PM)
That makes NO sense whatsoever. Even if they were out of money, why would they spend money filling in a hole they already dug out? Presumably anyone who buys it will have to just dig it back out again for a parking garage.


MJM says: (11/24/08 9:46 PM)
I've seen my share of buildings go up in Rosslyn and Clarendon and the only time they fill the hole back up with dirt is to build a ramp for heavy machinery to get into the hole and finish getting the dirt out and lay the needed foundations.

Agree with the comment above, who would finance to fill a hole back up. That looks like a ramp.


JD says: (11/24/08 9:57 PM)
The ramp has been there for many many months, and the hole was excavated to its very bottom and shored up a year ago. If you go back in the webcam's archives, you can watch dirt being trucked in and built up along the southern wall for the last week.

Will be interesting to see what happens.


Sean says: (11/24/08 10:17 PM)
The blue crane has only been up for a about a month. They wouldn't have put it up if they weren't going to start work on the hole, would they?


BBC says: (11/25/08 7:43 AM)
Maybe they had dirt instability issues and they are bringing in more dirt to pack in the bottom harder? Maybe there are issues with the dirt and they decided to make the garage one floor less deep?


Edna Wellthorpe says: (11/25/08 9:44 AM)
Not sure why, but it looks to me like they're going to redirect the ramp along the southern wall and then north along Half Street. Maybe so the hotel can begin construction?


JD says: (11/25/08 10:13 AM)
I think they might be doing something like shoring up the walls--they've done a lot of work to push the dirt up against the southern wall.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News

Snacks on A Photo Tour: Have been to one soccer game for DC United. It was a fun time, had great weather...
202_cyclist on A Photo Tour: JD- I hope your recovery continues apace and you'll be off the 60-day disabled ...
dude on A Photo Tour: @202, yes you could say that about 70I. Also, I'm not a huge soccer fan (I thin...
spiritequality on Tuesday Tidbits: @cjbabydaddy Thanks for the tip in where to look for movie theater info. Hope th...
Message Board (beta)

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/15/18
1000 B/O 3RD ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/07/18
1300 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/21/18

Recent Issued Building Permits Archive  
1331 2ND ST SE 20003   
01/29/18 
DC WATER / DAVE LEVINE
AH1800505 / CONSTRUCTION
After hours work for structure exaction and support for B1311474 DC Water. Corman Construction 202-863-0052.
1016 3RD ST SE   
02/01/18 
ANAMARIA R MOTTOLA / DAVID L. HAHN
P1803348 / SUPPLEMENTAL
1346 4TH ST SE   
02/06/18 
ALAN OWINGS / ROBERT SEV HENRY
AH1800541 / CONSTRUCTION
After Hours Permit for 2 / 19 / 18 from 7AM to 7PM to perform concrete, framing, and utility operations.
   
02/06/18 
FC 1346 LLC / RICHARD V CAREY
P1803428 / SUPPLEMENTAL
150 I ST SE   
02/05/18 
WC SMITH / null
P1803402 / SUPPLEMENTAL
140 M ST SE   
02/07/18 
SPAULDING & SLYE/STE100 / null
E1803798 / SUPPLEMENTAL
110 M ST SE   
01/29/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / JAMES WEAVER
E1803534 / SUPPLEMENTAL
   
02/02/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
P1803361 / SUPPLEMENTAL
140 M ST SE 20032   
02/14/18 
SYLVIA LINDSEY / null
P1803641 / SUPPLEMENTAL
202 M ST SE   
01/29/18 
UNITED STATES OF AMERICA / NURI EROL
D1800281 / CONSTRUCTION
Remove Existing flooring. Remove some of the furnitures, equipment.
300 M ST SE 53533   
02/08/18 
FEDERAL CENTER LP / SPENCER TEEL
BP1801893 / POST CARD
401 M ST SE   
01/30/18 
DOEE C/O DEV MURALI / JESSICA REICHARD
AH1800507 / CONSTRUCTION
After hours permit to preform manhole inspections during off peak hours 7pm - 7am for all Manhole Locations covered under permit # PA10374319-R1 for DOEE Anacostia river sediment project.
861 NEW JERSEY AVE SE   
01/21/18 
CONSOLIDATED RAIL CORPORATION / null
P1802976 / SUPPLEMENTAL
   
01/31/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION, INC.
AH1800467 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.***TO EXCLUDE LEGAL HOLIDAYS**
1100 NEW JERSEY AVE SE 2ND FL   
02/09/18 
SQUARE 742 LLC / null
P1803534 / SUPPLEMENTAL
   
02/14/18 
SQUARE 742 LLC / null
P1803681 / SUPPLEMENTAL
79 POTOMAC AVE SE   
01/22/18 
RIVERFRONT HOLDINGS I LLC / JUSTIN BELLOW
TL1800010 / CONSTRUCTION
1st time tenant layout for restaurant with 212 indoor seats and 350- indoors occupant load. 338 outdoor seats 550 outdoors occupant load.
640 SOUTH CAPITOL ST SE   
02/05/18 
JIM LATISIS ZAYO GROUP
B1707197 / CONSTRUCTION
Addition to existing concrete telecom building.
401 TINGEY ST SE   
01/30/18 
PEPCO / BARBARA ANN STEDMAN
AH1800520 / CONSTRUCTION
UG TRANSFORMER WORK TO BE PERFORMED ON THE 400 BLK OF TINGEY ST SE. MANHOLE ACCESS. WORK TO BE PERFORMED BETWEEN THE HOURS OF 7:30AM AND MIGHTNIGHT ON 1 / 30 / 18 AND 1 / 31 / 18.
227 TINGEY ST SE   
01/29/18 
UNITED STATES OF AMERICA / ERICKA CLARK
TC1800021 / CONSTRUCTION
2 tower cranes
   
01/30/18 
FOREST CITY WASHINGTON / MELISSA DIAZ
B1802750 / CONSTRUCTION
Revision to Permit SH1700028. Sheeting and shoring for Yards Parcel L-2 project. Revision includes 10-foot precut excavation and layback on Water Street, 3rd Street and northern L-1 elevations, and removal of upper tier of rakers at L-1 elevation and upper tier of tiebacks at the Water Street and 3rd Street elevations.
325 VIRGINIA AVE SE 20003   
02/14/18 
JASON W GOLDSMITH / null
E1804039 / SUPPLEMENTAL
325 VIRGINIA AVE SE   
02/06/18 
JASON W GOLDSMITH / CRAIG HARTSOCK
B1804721 / CONSTRUCTION
Remove two non-structural walls on ground level of townhouse and re-frame in new configuration to create a full bathroom on ground floor.
   
02/07/18 
JASON W GOLDSMITH / MORIS O. OCHOA PINEDA
P1803462 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
1001 NEW JERSEY AV SE   12/28/17
$ 687,365
WHATS ON SECOND PROPERTIES LLC
 


Project Directory
Completed
Agora ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.