Since January, 2003
            
 Page Through from Before to After

Despite my subconscious desire to return to those days when I didn't bother going to public meetings, I ventured out on Wednesday night to DDOT's first quarterly public meeting on the Ward 6 Performance Parking Pilot Program. Much of the discussion centered on issues outside of Near Southeast (such as how Southwest's parking-enforcement hours still run from 7 am to midnight seven days a week, even though Capitol Hill rolled theirs back to 9:30 pm six days a week and no restrictions at all on Sundays), so I don't really have a lot to report in terms of any changes that might be happening to the streets south of the freeway and east of South Capitol.
There are a few numbers to pass along--so far in 2008 (from the start of the program on March 26 through the end of October) the Ward 6 pilot zone grossed a bit over $235,000 in parking fees, with it splitting pretty evenly between the 80 game days ($118k, averaging $1,650 per day) and the other non-game days ($115k, averaging $1,300 per day). However, it cost the city more than $860,000 to install the meters and signage, so the program isn't exactly operating in the black yet.
The current red visitors passes are scheduled to expire on Dec. 31--however, DDOT's Damon Harvey acknowledged that the realities of trying to send them out in late December (in the midst of the holiday mail deluge) and the issue of on-street parking enforcement for the inauguration means that it's likely DPW will be told to not consider the old passes expired until Feb. 1 or some other date.
There was really only one attendee who was vociferously against the pilot's restrictions; others who got up to spoke had concerns about portions of it, but given how these meetings can sometimes go, it seemed that most people were accepting of the program. DDOT's Harvey made sure to emphasize a number of times that this program is not just about ballpark parking--it's to get ahead of all of the expected development and commerce coming to Capitol Hill, Near Southeast, and Southwest, and protect resident and business parking before it gets out of hand.
There were no specific changes announced for 2009--however, it sounded like if there were changes they'd be put in place closer to Opening Day. Although most of the people who spoke at the meeting mentioned that they didn't really see any influx of ballpark-related on-street parking on the Hill or areas further away in Southwest, it would be wise to keep in mind two things for 2009: the possibility that the free Nats Express won't be running (no decision yet), and, on the flip side, the opening of two new office buildings within two blocks of the ballpark that will have three levels of underground parking that could become available (100 M and 55 M, and perhaps also the underground parking now being built in the hole just north of the ballpark, though there's been no announcements of whether any of these will be offering gameday parking). The potential lack of free parking could drive more fans to try to find on-street parking, but perhaps the growth of close-in garage spaces will mitigate that.
Tune in again in February when I'm sure the traffic and parking discussions will heat up for the new season! (Yippee.)
UPDATE: Don't miss my addendum, where I clear up that just because the meters haven't been paid for yet doesn't mean that the neighborhood won't already be seeing some of the revenue.
Comments (0)
   
 
 More About Nationals Park
 All posts: parking, Nationals Park

JDLand.com Home

Comments

No comments posted.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJBabyDaddy on I'm Dreaming of: Two things everybody might agree on: A popular 24-hour diner somewhere in the ‘...
VelocityChris on I'm Dreaming of: Agreed JES, 24 hour diner would be perfect! To add another decent DC diner, Ari'...
CJBabyDaddy on I'm Dreaming of: @RMP: If anyone’s organizing a GoFundMe for more of those awesome crosswalk-blo...
JES on I'm Dreaming of: an "urban style" IHOP or waffle house down here would be awesome, main...
jdc on I'm Dreaming of: I love Silver Diner, but I find it does not quite have the greasy spoon feel tha...
JD on I'm Dreaming of: For NJ-type diners there's Metro 29 in Arlington and Amphora in Vienna. Silver a...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1402 1ST ST SE   
11/25/19 
UNITED STATES OF AMERICA / DAVID C POSTLEWAITE
SB1900412 / CONSTRUCTION
Parcel G2:WSP will complete four borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). The proposed boring locations would be in the four quadrants of Parcel G2 to check for spatial variability in contaminant concentrations. WSP will collect and analyze three soil samples from each boring from depths corresponding to potential subgrade elevations (i.e. 10-12 ft. bgs, 20-22 ...
1212 4TH ST SE   
11/25/19 
FC 1212 LLC / TAMIKA STATON; OTIS
ER2000409 / SHOP DRAWING
Replace governor car #2 - Part #: TBA20641H6 Replace hoist belts #1 and #4 - Part #: SB0003119
1300 4TH ST SE   
12/06/19 
ASANA PARTNERS / S.A. COMUNALE; S.A. COMUNALE
P2001954 / SUPPLEMENTAL
1346 4TH ST SE   
12/06/19 
KAITLYNN MATTEO / W. SAKIE - BHAR; W. SAKIE - BHAR; NA
SG2000117 / CONSTRUCTION
Install one set of non illuminated sign on to existing store front building
   
12/12/19 
FC 1346 HOLDCO I L L C / ;
P2002122 / SUPPLEMENTAL
82 I ST SE   
12/13/19 
GDVC EYE STREET LLC / ALYSSA CARRABIS; IRON FISH CONSTRUCTION IRON FISH CONSTRUCTION
B2002764 / CONSTRUCTION
SCOPE OF WORK: CONSTRUCTION OF A NEW 120 SQSF CLOSET SPACE WITHIN AN EXISTING PARKING GARAGE. NO CHANGE IN EGRESS OR PATH OF TRAVEL. MAINTAIN UNOBSTRUCTED PATH OF EGRESS AS REQUIRED BY CODE THROUGH CONSTRUCTION.
408 L ST SE   
12/11/19 
JOSEPH LEBLANC / KYLE YOST
SOL2000412 / CONSTRUCTION
rooftop solar pv system, less than 4' above roof
   
12/13/19 
JOSEPH F LEBLANC / null
E2002722 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
11/26/19 
GREYSTAR GP I I, LLC / KIM MITCHELL; KIM MITCHELL
FD1900040 / CONSTRUCTION
TWO BELOW GRADE PRKING LEVELS, CONCRETE FOUNDATION WALLS, SLAB ON GRADE, COLUMNS ELEVATED DECKS UP TO GRADE WITH UNDERGROUND UTILITIES (MECHANICAL, PLUMBING, ELECTRICAL)
   
12/05/19 
MIKE ALLEN / JANE MCCRAY
AH2000244 / CONSTRUCTION
WO# 1611441 - Mike Allen / P. Helgeson. Pepco to install network transformer
   
12/12/19 
CXS PROPERTIES GROUP / CHARLES C. BAKER; CHARLES C. BAKER
P2002143 / SUPPLEMENTAL
125 O ST SE   
11/25/19 
DISTRICT OF COLUMBIA / DAVID C POSTLEWAITE
SB1900411 / CONSTRUCTION
WSP will complete three borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). WSP assumes that borings will not be installed inside the fleet maintenance facility due to access restrictions imposed by DC Water. The proposed boring locations form an ‘L’ shape around the eastern and southern sides of the fleet maintenance facility. WSP will collect and analyze three soil samp...
71 POTOMAC AVE SE   
12/06/19 
MPR REALTY / BOB BIROONAK; BOB BIROONAK; ART DISPLAY CO
SG2000099 / CONSTRUCTION
One building name MAREN Two set of address numbers all signs are non-illuminated
227 TINGEY ST SE   
12/02/19 
FC 227 LLC / KAYLA SHATTUCK; BROOKFIELD PROPERTIES MANAGEMENT LLC.
RW1900122 / CONSTRUCTION
Construction of new retaining wall located between Canal Street St and Third Street, SE.
300 TINGEY ST SE   
12/04/19 
FC BOILERMAKER LLC / ROBERT S. WATTS; ROBERT S. WATTS
E2002289 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.