For those who haven't wandered past themselves, I've posted a few photos of the post-demolition landscape at Capitol Quarter--this was done because of structural problems uncovered in the foundations, which EYA decided were severe enough to require the demolition of the existing work rather than just trying to patch it or shore it up. If you want to see how the construction went up and then came down, here's all the photos of the southeast corner of Fourth and L taken this year.
Comments (11)
   
 
 More About Capper
 All posts: Capper, Capitol Quarter

JDLand.com Home

Comments

MJM says: (10/20/08 12:45 PM)
Ouch. That was a costly mistake but kudos to them for making the tough decision to fix it.


Justin says: (10/20/08 3:21 PM)
What's the certainty that it was "foundation" problems that caused the tear-down? Has this been confirmed by anyone beside the developers?


Bruce says: (10/20/08 4:00 PM)
Not sure I understand that. I'm satisfied that it was foundation issues. I'm sure this is costing EYA plenty to recify this.


Lori says: (10/21/08 1:14 PM)
Thanks for the explanation. I drive by that site every day and was shocked to see it in ruins.


Justin says: (10/21/08 3:38 PM)
Right. Bruce's satisfaction and the many kudos from residents-to-be aside, the question is:

Other than the developers themselves, has anyone stated, "There were foundation problems with these buildings"?

What do EYA's books look like at this point? Given the delays already incurred, the state of financing elsewhere in Southeast, the state of the economy, what is the confidence in the project's moving forward? However much it is costing EYA to tear down the buildings, mightn't it be less than the carrying cost of the land with homes unbuilt? Tear down, allow foreclosure, move on ... why is this not possible?

I'm not at all implying answers to the above, but I don't understand absence of the questions.


JD says: (10/21/08 3:43 PM)
The DC Housing Authority has confirmed for me the problems with the foundations. The entire Phase I batch of buildings are still scheduled to be completed on time.


JD says: (10/21/08 3:47 PM)
(adding) Remember, Justin, this is not a pure market-driven development owned by EYA. This is a Hope VI DC Housing Authority venture, backed by millions of dollars in bonds. It's not like any other development going on in the neighborhood in terms of what could be happening with market forces. The decisions are not purely EYA's.

Now, you might not see Phase 2 get started anytime soon, because of the need to get bonds/financing in this tough environment, but Phase 1 continues to move forward. In fact, the original delivery date for these first homes on L Street was advertised to the bond market as April 2009; that will still come close to being met. (EYA had made up some time over the summer to have allowed the possibility of late 2008/early 2009 delivery of the first units; now they've just "reverted" to the original timelime for most of them)


Bruce says: (10/21/08 4:55 PM)
Exactly....The question of liquidity was addressed, giventhe current climate and I was assured that was not an issue. Phase 1 will be built as planned. EYA had plans on another release toward year end (I believe), but that may change....


G St says: (10/21/08 8:18 PM)
Men at Work - It's a Mistake!


Justin says: (10/22/08 4:54 PM)
Ahh. Good news, sort of.


Sarah says: (10/25/08 9:28 AM)
They will probably knock down this whole project in 20 years anyway when they realize the mixed use development is a recipe for failure.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJBabyDaddy on Roundup of Some: @king of arabistan: Keep movie theater hope alive!
Jscott280 on Roundup of Some: Wow - that is very impressive!!
dcgent on Roundup of Some: Plans for large surface parking lot left on Buzzard point announced https://dc....
bdj on Roundup of Some: has Basebowl the other night and it was delicious. Great addition to the neighbo...
FstSE on Roundup of Some: @king of Arabistan: this is the greystar site currently under construction acros...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   BURGLARY
Burglary Two
 11/26/20
UNIT B/O M ST SE   ROBBERY  11/25/20
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/24/20
UNIT B/O I ST SE   ROBBERY
Carjacking
 11/23/20
200 B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  11/22/20
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/22/20
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/22/20
1000 B/O 3RD ST SE   ROBBERY  11/21/20
1200 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/19/20
UNIT B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 11/18/20
1000 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/12/20
1100 B/O 2ND PLACE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 11/12/20
1000 B/O 8TH ST SE   THEFT
Theft First Degree (theft From Building)
 11/12/20
1000 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft Of Motor Vehicle Parts Or Accessories)
 11/10/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/05/20
300 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/05/20
900 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/20
UNIT B/O I ST SE   THEFT
Theft First Degree (shoplifting)
 10/31/20
900 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/29/20
300 B/O TINGEY ST SE   ROBBERY
Carjacking
 10/29/20
1300 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/28/20

Recent Issued Building Permits Archive  
1200 1ST ST SE   
11/04/20 
PEPCO / DONNA G GRAHAM
AH2100169 / CONSTRUCTION
WO #16029084 / 02 - 1200 1ST ST SE - PEPCO / WA CHESTER TO REMOVE AND INSTALL CABLES MONDAY THROUGH SATURDAYS FROM 9PM TO 6AM STARTING 11 / 5 / 20 TO 12 / 5 / 20
1018 3RD ST SE   
11/10/20 
DAVID A LEINER / null
E2101357 / SUPPLEMENTAL
1300 4TH ST SE 1001   
11/03/20 
YAAN REAL ESTATE LP / null
P2100950 / SUPPLEMENTAL
1300 4TH ST SE RU-1   
11/19/20 
AP BOWER RETAIL LLC / null
E2101650 / SUPPLEMENTAL
1057 5TH ST SE   
11/05/20 
PAM HARDER / null
E2101183 / SUPPLEMENTAL
82 I ST SE   
11/12/20 
STARRY / null
E2101432 / SUPPLEMENTAL
330 K ST SE   
11/09/20 
MINDY J SHAW / CASEY CHARKHABI; NA
B2008664 / CONSTRUCTION
Adding a bathroom on the first floor
   
11/10/20 
JINGSONG XIA / null
P2101107 / SUPPLEMENTAL
100 M ST SE   
11/12/20 
LHREV WASHINGTON M ST LLC / null
P2101170 / SUPPLEMENTAL
   
11/12/20 
SQUARE 743 INC / ;
P2101121 / SUPPLEMENTAL
139 N ST SE   
11/10/20 
BROOKFIELD DEVELOPMENT / JUSTIN BELLOW; BROOKFIELD DEVELOPMENT
B2004436 / CONSTRUCTION
NEW CONSTRUCTION 10-STORY PLUS PENTHOUSE APARTMENT BUILDING WITH 379 UNITS. PROPOSED GROSS FLOOR AREA: 225,000 SF. SH2000028 issued
1275 NEW JERSEY AVE SE   
11/04/20 
USA / null
E2101168 / SUPPLEMENTAL
   
11/09/20 
BROOKFIELD PROPERTIES / TIM GOOD
BP2100588 / POST CARD
71 POTOMAC AVE SE APT 1208   
11/02/20 
null / NA NA NA
EHOP20957167 / HOME OCCUPATION
71 POTOMAC AVE SE   
11/04/20 
RIVERFRONT HOLDINGS II, LLC / null
M2100380 / SUPPLEMENTAL
   
11/04/20 
RIVERFRONT HOLDINGS II, LLC / null
P2100978 / SUPPLEMENTAL
   
11/09/20 
MRP REALTY / null
E2101319 / SUPPLEMENTAL
227 TINGEY ST SE   
11/18/20 
FC 227 LLC / null
E2101630 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.