For those who haven't wandered past themselves, I've posted a few photos of the post-demolition landscape at Capitol Quarter--this was done because of structural problems uncovered in the foundations, which EYA decided were severe enough to require the demolition of the existing work rather than just trying to patch it or shore it up. If you want to see how the construction went up and then came down, here's all the photos of the southeast corner of Fourth and L taken this year.
Comments (11)
   
 
 More About Capper
 All posts: Capper, Capitol Quarter

JDLand.com Home

Comments

MJM says: (10/20/08 12:45 PM)
Ouch. That was a costly mistake but kudos to them for making the tough decision to fix it.


Justin says: (10/20/08 3:21 PM)
What's the certainty that it was "foundation" problems that caused the tear-down? Has this been confirmed by anyone beside the developers?


Bruce says: (10/20/08 4:00 PM)
Not sure I understand that. I'm satisfied that it was foundation issues. I'm sure this is costing EYA plenty to recify this.


Lori says: (10/21/08 1:14 PM)
Thanks for the explanation. I drive by that site every day and was shocked to see it in ruins.


Justin says: (10/21/08 3:38 PM)
Right. Bruce's satisfaction and the many kudos from residents-to-be aside, the question is:

Other than the developers themselves, has anyone stated, "There were foundation problems with these buildings"?

What do EYA's books look like at this point? Given the delays already incurred, the state of financing elsewhere in Southeast, the state of the economy, what is the confidence in the project's moving forward? However much it is costing EYA to tear down the buildings, mightn't it be less than the carrying cost of the land with homes unbuilt? Tear down, allow foreclosure, move on ... why is this not possible?

I'm not at all implying answers to the above, but I don't understand absence of the questions.


JD says: (10/21/08 3:43 PM)
The DC Housing Authority has confirmed for me the problems with the foundations. The entire Phase I batch of buildings are still scheduled to be completed on time.


JD says: (10/21/08 3:47 PM)
(adding) Remember, Justin, this is not a pure market-driven development owned by EYA. This is a Hope VI DC Housing Authority venture, backed by millions of dollars in bonds. It's not like any other development going on in the neighborhood in terms of what could be happening with market forces. The decisions are not purely EYA's.

Now, you might not see Phase 2 get started anytime soon, because of the need to get bonds/financing in this tough environment, but Phase 1 continues to move forward. In fact, the original delivery date for these first homes on L Street was advertised to the bond market as April 2009; that will still come close to being met. (EYA had made up some time over the summer to have allowed the possibility of late 2008/early 2009 delivery of the first units; now they've just "reverted" to the original timelime for most of them)


Bruce says: (10/21/08 4:55 PM)
Exactly....The question of liquidity was addressed, giventhe current climate and I was assured that was not an issue. Phase 1 will be built as planned. EYA had plans on another release toward year end (I believe), but that may change....


G St says: (10/21/08 8:18 PM)
Men at Work - It's a Mistake!


Justin says: (10/22/08 4:54 PM)
Ahh. Good news, sort of.


Sarah says: (10/25/08 9:28 AM)
They will probably knock down this whole project in 20 years anyway when they realize the mixed use development is a recipe for failure.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

GarfieldPark on Tidbits: DC Vedgefest was today @ Nats Park. A lot of people and a lot of vendors. Was de...
JD on Tidbits: There's been talk that Greystar was about to get in the ground to start work on ...
CJBabyDaddy on Tidbits: Pretty soon, the law needs to be that if they add another good restaurant a bloc...
JD on Tidbits: The Union Square Hospitality outpost at the new Thompson Hotel at 3rd and Tingey...
bdj on Tidbits: I’m actually inclined to take Smorgasbord at their word on this one. DC really i...
conngs0 on Tidbits: Too bad about Smorgasburg but not entirely surprising. Considering all of the r...
  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/15/19
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/15/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/15/19
100 B/O M ST SE   THEFT
Theft First Degree (purse-snatching)
 08/14/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/14/19
500 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/14/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/12/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/07/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/06/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/06/19
800 B/O VIRGINIA AVE SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 08/05/19
UNIT B/O N ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/04/19
400 B/O M ST SE   THEFT
Shoplifting
 08/01/19
900 B/O 3RD ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/26/19
600 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/25/19
400 B/O M ST SE   THEFT
Shoplifting
 07/19/19
400 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/18/19
1000 B/O 5TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/17/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/17/19

Recent Issued Building Permits Archive  
1100 2ND PL SE   
08/06/19 
DC WATER / JEFF NOLD
AH1901095 / CONSTRUCTION
CCTV inspection of Sanitary Sewer sytem at the corner of 2nd Place and L Street SE.
808 3RD ST SE   
07/29/19 
LAURA R JENKINS / BRANDON K. VIERNES; BRANDON K. VIERNES
M1903669 / SUPPLEMENTAL
913 4TH ST SE   
08/07/19 
JANE SESSA / KYLE YOST; KYLE YOST
SOL1901388 / CONSTRUCTION
rooftop solar pv system, less than 4' above roof.
   
08/14/19 
JANE T SESSA / null
E1910482 / SUPPLEMENTAL
1331 4TH ST SE 719   
08/07/19 
null / NA NA NA
EHOP19936898 / HOME OCCUPATION
1346 4TH ST SE   
07/24/19 
FC 1346 HOLDCO I LLC / null
P1908097 / SUPPLEMENTAL
312 K ST SE   
08/05/19 
HENRY LOWNDES MAURY TRUSTEES / null
E1910076 / SUPPLEMENTAL
   
08/07/19 
HENRY L MAURY / BJORN FALK; ANTHONY COLELLA
SOL1901686 / CONSTRUCTION
Install 6.54 solar PV system using 20 327-watt solar panels, roof mounted, with micro-inverters.
100 M ST SE   
07/23/19 
SQUARE 743 INC / STEPHANIE ERWIN; ORR PARTNERS
B1912550 / CONSTRUCTION
Existing office. Interior alteration and repair to include electrical and mechanical work. All interior work, no exterior work in permit scope.
   
07/29/19 
SQUARE 743 INC / KIM MITCHELL; MONUMENT REALITY
B1909745 / CONSTRUCTION
CONSTRUCTION OF OFFICE SPACE ON THE 7TH FLOOR - MULTI TENANT FLOOR IN AN EXISTING OFFICE BUILDING. THE SPACE IS IN SHELL CONDITION, NOT PREVIOUSLY OCCUPIED. THIS IS AN EXPANSION OF AN EXISTING TENANT ON THE 7TH FLOOR
   
08/06/19 
SQUARE 743 INC / PAUL THIEBERGER; PAUL THIEBERGER
P1908468 / SUPPLEMENTAL
300 M ST SE   
08/08/19 
FEDERAL CENTER LP / MIKE BOONE
AH1901148 / CONSTRUCTION
PEPCO-WO#15676746 / 02-ALLEN / CHESTER-CREWS WILL BE INSTALLING CABLE. 300 BLK M ST SE 400 BLK M ST SE 400 BLK TINGEY ST SE 1200 BLK 4TH ST SE THEY WILL BE TAKING PARKING LANE AND MIDDLE LANE M-F 11PM-7AM
800 NEW JERSEY AVE SE   
08/14/19 
NEW JERSEY AT H LLC / null
E1910458 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
08/07/19 
809-853 NEW JERSEY AVE ACQUISITION LLC / JOSEPH M MAGNOLIA; JOSEPH M MAGNOLIA
P1908508 / SUPPLEMENTAL
   
08/08/19 
GRAYSTAR GP 11,LLC / KIM MITCHELL
SH1900015 / CONSTRUCTION
Support of excavation for entire site for two below grade parking levels
   
08/14/19 
GRAYSTAR GP 11 LLC / MITCH A. PERMUY; MITCH A. PERMUY
E1910454 / SUPPLEMENTAL
   
08/14/19 
GRAYSTAR GP 11 LLC / MITCH A. PERMUY; MITCH A. PERMUY
E1910455 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 1ST FL   
07/23/19 
SQUARE 742 LLC / JAMES W LASHER; JAMES W LASHER
E1909662 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
07/26/19 
SQUARE 742 LLC / WILLIAM SNODDY; TBD
B1911194 / CONSTRUCTION
Tenant Finish Out. Existing Condition to be demolished and new office space built to tenant's standards. Office consists of open office and private offices.
   
07/30/19 
SQUARE 742 LLC / null
P1908231 / SUPPLEMENTAL
   
08/06/19 
SQUARE 742 LLC / ;
P1908470 / SUPPLEMENTAL
   
08/06/19 
SQUARE 742 LLC / null
M1903804 / SUPPLEMENTAL
520 TINGEY ST SE   
08/12/19 
US GENERAL SERVICES ADMINISTRATION / JOHN WICKLIFFE; NA
TN1900153 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed Aug 16, 2019 - Feb 9, 2020 Events Daily 8:00 am - 10:00 pm
227 TINGEY ST SE   
07/31/19 
UNITED STATES OF AMERICA / BILL SAUNDERS; BILL SAUNDERS
P1908289 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.