Since January, 2003
            
 (a random before-and-after moment)
November 8, 2004
March 24, 2019
3rd at K, Looking West-Northwest (see more)

A press release from the mayor's office (not yet online) tells us that this afternoon Mayor Fenty accepted $800,000 from the developers of Florida Rock/RiverFront for the construction of Diamond Teague Park next door. This contribution was part of the second-stage Planned Unit Development approval given by the Zoning Commission a few months back for the 1.1-million-square-foot mixed-use project.
Here's what the press release says about the park (emphases mine): "The District will use the $800,000 contribution from Florida Rock to help pay for Diamond Teague Park, which is dedicated to the memory of Diamond Teague, a member of the Earth Conservation Corps (ECC) who was murdered five years ago. The Park will include a water taxi; new boat slips for the ECC and fire and life safety vessels; an environmental pier for educational groups, kayaks and canoes; and a riverfront boardwalk and a half-acre park. Construction of the park is expected to start in November and will be completed this spring."
The event was also touted as an "unveiling" of the plans for the Florida Rock site, which I'm assuming (since I wasn't able to be at this event today) haven't changed too much since they were approved by the Zoning Commission in May. The press release has the raw numbers, which don't look too different: "Florida Rock's 'Riverfront on the Anacostia' will include about 560,000 square feet of residential and hotel space - with 29,000 square feet is reserved for affordable housing. It will also include about 545,000 square feet of commercial office space, at least 80,000 square feet of retail and a large waterfront plaza with a waterfront promenade."
But there is one line in the release that's going to chagrin those who have been looking forward to this project: "Construction could begin as soon as 2011." During the time leading up to the final zoning approvals, RiverFront's developers had said that it was possible that the first phase of the project--the eastern office building and the public plaza, adjacent to Teague Park--could see construction begin in fall 2009.
Comments (2)
   
 
 More About Teague Park

JDLand.com Home

Comments

MJM says: (10/6/08 9:41 PM)
It is a start.


Scott G says: (10/7/08 12:52 AM)
Wow, that stinks. They should have sold the plot and the plans to an actual accomplished developer (like Akridge, PN Hoffman, or JBG). They are minor leaguers who don't know what they're doing. They could make a good bit of money by selling the land.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

NavyYard2015 on August Tidbit Roundup: Anyone know what kind of food that will be? Google does not come up with any res...
202_cyclist on August Tidbit Roundup: 18 apartments are planned for the long-vacant building next to the Brig. http...
NavyYard2015 on August Tidbit Roundup: Agreed, RMP! Now I am left to wonder what kind of barbecue it will be. Seems lik...
RMP on August Tidbit Roundup: The signage at Base Bowl says Barbecue and Ramen. Gotta tip my hat to the qualit...
Maelstrom on August Tidbit Roundup: Hello from someone who moved out of the neighborhood and across the country a wh...
Ampersand on August Tidbit Roundup: Just walked by Roy boys with the door partway open. A guy there said they expect...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O K ST SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 08/23/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/22/19
1100 B/O 2ND PLACE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/21/19
300 B/O L ST SE   BURGLARY
Burglary One
 08/21/19
100 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/20/19
1200 B/O SOUTH CAPITOL ST SE   ROBBERY  08/20/19
150 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 08/18/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/15/19
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/15/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/15/19
100 B/O M ST SE   THEFT
Theft First Degree (purse-snatching)
 08/14/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/14/19
500 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/14/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/12/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/07/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/06/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/06/19
800 B/O VIRGINIA AVE SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 08/05/19
UNIT B/O N ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/04/19
400 B/O M ST SE   THEFT
Shoplifting
 08/01/19
900 B/O 3RD ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/26/19
600 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/25/19

Recent Issued Building Permits Archive  
1100 2ND PL SE   
08/06/19 
DC WATER / JEFF NOLD
AH1901095 / CONSTRUCTION
CCTV inspection of Sanitary Sewer sytem at the corner of 2nd Place and L Street SE.
808 3RD ST SE   
07/29/19 
LAURA R JENKINS / BRANDON K. VIERNES; BRANDON K. VIERNES
M1903669 / SUPPLEMENTAL
913 4TH ST SE   
08/07/19 
JANE SESSA / KYLE YOST; KYLE YOST
SOL1901388 / CONSTRUCTION
rooftop solar pv system, less than 4' above roof.
   
08/14/19 
JANE T SESSA / null
E1910482 / SUPPLEMENTAL
1331 4TH ST SE 719   
08/07/19 
null / NA NA NA
EHOP19936898 / HOME OCCUPATION
1346 4TH ST SE 20011   
08/16/19 
FC 1346 HOLDCO 1 LLC / null
E1910605 / SUPPLEMENTAL
312 K ST SE   
08/05/19 
HENRY LOWNDES MAURY TRUSTEES / null
E1910076 / SUPPLEMENTAL
   
08/07/19 
HENRY L MAURY / BJORN FALK; ANTHONY COLELLA
SOL1901686 / CONSTRUCTION
Install 6.54 solar PV system using 20 327-watt solar panels, roof mounted, with micro-inverters.
100 M ST SE   
07/29/19 
SQUARE 743 INC / KIM MITCHELL; MONUMENT REALITY
B1909745 / CONSTRUCTION
CONSTRUCTION OF OFFICE SPACE ON THE 7TH FLOOR - MULTI TENANT FLOOR IN AN EXISTING OFFICE BUILDING. THE SPACE IS IN SHELL CONDITION, NOT PREVIOUSLY OCCUPIED. THIS IS AN EXPANSION OF AN EXISTING TENANT ON THE 7TH FLOOR
   
08/06/19 
SQUARE 743 INC / PAUL THIEBERGER; PAUL THIEBERGER
P1908468 / SUPPLEMENTAL
   
08/16/19 
SQUARE 743 INC / BRIAN QUINN; NA
B1911537 / CONSTRUCTION
Interior renovation for new tenant in existing office space on partial area of the 9th floor.
300 M ST SE   
08/08/19 
FEDERAL CENTER LP / MIKE BOONE
AH1901148 / CONSTRUCTION
PEPCO-WO#15676746 / 02-ALLEN / CHESTER-CREWS WILL BE INSTALLING CABLE. 300 BLK M ST SE 400 BLK M ST SE 400 BLK TINGEY ST SE 1200 BLK 4TH ST SE THEY WILL BE TAKING PARKING LANE AND MIDDLE LANE M-F 11PM-7AM
800 NEW JERSEY AVE SE   
08/14/19 
NEW JERSEY AT H LLC / null
E1910458 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
08/07/19 
809-853 NEW JERSEY AVE ACQUISITION LLC / JOSEPH M MAGNOLIA; JOSEPH M MAGNOLIA
P1908508 / SUPPLEMENTAL
   
08/08/19 
GRAYSTAR GP 11,LLC / KIM MITCHELL
SH1900015 / CONSTRUCTION
Support of excavation for entire site for two below grade parking levels
   
08/14/19 
GRAYSTAR GP 11 LLC / MITCH A. PERMUY; MITCH A. PERMUY
E1910454 / SUPPLEMENTAL
   
08/14/19 
GRAYSTAR GP 11 LLC / MITCH A. PERMUY; MITCH A. PERMUY
E1910455 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
07/30/19 
SQUARE 742 LLC / null
P1908231 / SUPPLEMENTAL
   
08/06/19 
SQUARE 742 LLC / ;
P1908470 / SUPPLEMENTAL
   
08/06/19 
SQUARE 742 LLC / null
M1903804 / SUPPLEMENTAL
520 TINGEY ST SE   
08/12/19 
US GENERAL SERVICES ADMINISTRATION / JOHN WICKLIFFE; NA
TN1900153 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed Aug 16, 2019 - Feb 9, 2020 Events Daily 8:00 am - 10:00 pm
227 TINGEY ST SE   
07/31/19 
UNITED STATES OF AMERICA / BILL SAUNDERS; BILL SAUNDERS
P1908289 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.