A recent wander past the Office of Property Management page on 225 Virginia (aka the old Post Plant) brings the news that the deadline for proposals from entities interested in taking over the city's $500,000-a-month sublease has been pushed back to Oct. 15. The page has also been updated with a few other items of note:
* One of the results of the case that's coming before the Zoning Commission on Oct. 27 that seeks to add the plant's block to the Capitol South Receiving Zone would be to allow the property to receive transferred development rights, which allows for increased density (i.e., add some floors on top), though the page notes that "[a]dditional height is expected to be subject to some design review by the Office of Planning."
* The building is not a historic building, and the city will not be seeking any historic landmark designation for it.
There's also this: "The trash transfer station located at 900 New Jersey Avenue, SE is expected to be relocated by September, 2009." I get asked a lot about What The Deal Is with the trash transfer station, so here's a bit of a roundup:
The city is working on moving the current DPW operations out of the building to other locations around the area, with that September 2009 mentioned above now being the official timetable (though perhaps some of the functions will be gone sooner than that). In the meantime, the city is still waiting for the little plot of land on the edge of the transfer station known as Reservation 17A to be transferred to District control from the Feds. (That land will then be transferred from the city to William C. Smith to round out the land that will be home to their 1.1-million-sq-ft 800 New Jersey Avenue project.) This transfer has been hung up for almost two years (it's part of the same transfer that would give Federal land at Poplar Point and in Hill East to the city), but there may be some movement soon.
The next step once DPW has left and the land transfer is settled would be for the city to start the infrastructure work, environmental cleanup, and demolition around the trash transfer site (including the new section of I Street to be built between New Jersey and Second), which will be paid for via another PILOT (payment in lieu of taxes) plan that requires financing via the bond and credit markets--you know, those same bond and credit markets that are wheezing just a wee bit right now.
[All together now:] We shall see....
Comments (2)
   
 
 More About 225 Virginia/Old Post Plant/200 I

JDLand.com Home

Comments

DJ says: (10/3/08 2:13 PM)
the trash transfer station (properly gutted and detoxed) would be a great shell for a whole foods.


JD says: (10/3/08 2:24 PM)
Whole Foods will definitely not be going in at the trash transfer site.

Look to the north, grasshopper, look to the north. The WC Smith site at 800 New Jersey has always been itching for a grocery store.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Jscott280 on Inching from Quarantining: We recently discussed this (even though it is technically not in jdland) https:...
GarfieldPark on Inching from Quarantining: Very sad news about Tortilla Coast. Was solid Tex Mex and Coronas within walking...
JD on Inching from Quarantining: The few people I know who are working downtown say that it's brutal to try to fi...
conngs0 on Inching from Quarantining: jdc, it's going to be super interesting to see how the retail landscape changes....
jdc on Inching from Quarantining: By the time I regularly resume trips to JD Land, I wonder how much of the retail...
Jscott280 on Inching from Quarantining: https://www.bisnow.com/washington-dc/news/retail/barbershop-and-cocktail-bar-con...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/13/20
900 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/09/20
1500 B/O 1ST ST SE   SEX ABUSE
Assault W/intent To Commit First Degree Sexual Abuse (force) (rape)
 07/08/20
400 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/06/20
1200 B/O HALF ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/05/20
100 B/O H ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/03/20
100 B/O O ST SE   ROBBERY  07/03/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/28/20
1200 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/25/20
1200 B/O SOUTH CAPITOL ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 06/23/20
1200 B/O NEW JERSEY AVE SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 06/20/20
1000 B/O 3RD PLACE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/20
800 B/O SOUTH CAPITOL ST SE   ASSAULT WITH A DANGEROUS WEAPON  06/14/20

Recent Issued Building Permits Archive  
1300 4TH ST SE RU-2   
06/18/20 
AP BOWER RETAIL LLC / MELISSA BRENT
SG2000335 / CONSTRUCTION
Install 1 illuminated wall sign & 1 illuminated blade sign - JENIs ICE CREAM
1150 5TH ST SE   
07/01/20 
DISTRICT OF COLUMBIA / CASEY STRINGER; TBD; TBD
BCIV2000113 / CONSTRUCTION
DGS PROJECT VAN NESS ELEMENTARY SCHOOL INITIAL PHASE FOR SITE DEMOLITION AND SITE CONSTRUCTION STAGING AREA FOR THE INSTALLATION OF TWO TEMPORARY SCHOOL TRAILERS TO BE SUBMITTED UNDER A SEPARATE PERMIT.
   
07/08/20 
DISTRICT OF COLUMBIA / CASEY STRINGER; NA
B2008863 / CONSTRUCTION
DGS PROJECT Minor interior classroom renovations at existing school
150 I ST SE   
07/02/20 
SQUARE 737 LLC / JASON D DORRIS
AH2001626 / CONSTRUCTION
Construction of a new 13 story apartment building with three below grade parking levels, 1st floor retail and amenity areas; 375 units and 181 parking spaces. To include mechanical, electrical, plumbing, elevators and structural work.
151 M ST SE   
06/18/20 
BROOKFIELD PROPERTIES / CHRIS CRESCI; NA
SB2000292 / CONSTRUCTION
WSP will be advancing approximately 50 soil borings to 30 feet, and an additional 8 borings to 4 feet via direct push. A water sample will be collected from 3 of the deep borings. All borings will be abandoned via bentonite grout mix. Investigation derived waste will be stored in DOT 55-gallon steel drums. Private and public utility locating will take place prior to the work beginning
250 M ST SE   
06/19/20 
WILLIAM C SMITH / null
E2008622 / SUPPLEMENTAL
   
06/24/20 
SQUARE 769 LLC / null
M2002834 / SUPPLEMENTAL
   
06/24/20 
SQUARE 769 LLC / null
P2006931 / SUPPLEMENTAL
   
07/10/20 
SQUARE 769 LLC / null
E2009225 / SUPPLEMENTAL
300 M ST SE   
06/18/20 
FEDERAL CENTER LP / null
E2008587 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
06/19/20 
CXS TRANSPORTATION INC / ;
P2006843 / SUPPLEMENTAL
   
06/22/20 
GREYSTAR GP LLC / KIM MITCHELL
B1903035 / CONSTRUCTION
The proposed project is three structures which are connected by a shared below-grade garage, which is one story deep on the east half of the site and two stories deep on the west half of the site. Two structures will be residential, with a total of 756 units, and the third will be a 225-key hotel. The west residential structure (Building 3) is planned to be 13 stories with ground and roof level am...
   
06/25/20 
CXS TRANSPORTATION INC / ;
P2006972 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
06/24/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
P2006938 / SUPPLEMENTAL
   
07/08/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
M2002985 / SUPPLEMENTAL
401 WATER ST SE   
06/18/20 
BROOKFIELD PROPERTIES / CHRIS CRESCI
SB2000294 / CONSTRUCTION
WSP will advance 23 soil borings to 30 feet and 8 additional borings to 4 feet using direct push. A groundwater sample will be collected from 2 of the deep borings by installing a temporary well. Soil boirngs will be abandoned with bentonite / grout mix. IDW will be stored for disposal in DOT 55-gallon drums. A private and public utility mark out will be completed priot to starting intrusive w...
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.