Since January, 2003
            
 (a random before-and-after moment)
March 22, 2007
June 4, 2017
7th at M, Looking North-Northwest (see more)

Just a bunch of tiny items worth highlighting on a dreary Saturday (no new photos today in this muck):
* A building permit has been approved to build a surface parking lot along First Street between M and N, where Normandie Liquors and its brethren were demolished last month. And the Archdiocese of Washington has applied for a public space permit for the 1300 block of First Street, SE--does the Popemobile need special parking permits?
* As plans at The Yards continue to move forward, there's now official names for the first-phase projects. Say hello to The Boilermaker Shop, The Pattern Shop Lofts, and Factory 202. (And 401 M and 400 Tingey, but those aren't anywhere near as catchy.)
* The 55 M web cam is no longer available to the public. Perhaps they want the Opening Day vista to be a big surprise. Or they don't want people watching the last-minute work on the Navy Yard Metro station. (I wonder if the gas main hit on Thursday was caught by this camera.)
* Some commenters are discussing the idea that's been floated of someday demolishing the Southeast-Southwest Freeway. Getting rid of this Berlin Wall that separates Capitol Hill and Near Southeast (and splits Southwest) was brought up in the National Capital Planning Commission's 1997 Extending the Legacy framework plan, if you want to see it actually on paper. (Apparently an updated NCPC framework plan is scheduled to come out this spring, which looks like it continues to have Virginia Avenue marked where the freeway currently is.) As to whether I'll see this done in my lifetime, well, it would be a nice surprise.
If you really want to go high-concept, you can read DDOT's 2003 South Capitol Street Gateway and Improvement Study to see their ideas for a tunnel that would link I-295 and the SE/SW Freeway for through traffic, leaving South Capitol Street to become the grand urban gateway boulevard planners envision. At Wednesday's public meeting on the South Capitol Street Draft Environmental Impact Statement, DDOT said that the tunnel isn't totally off the table, but they decided that a new Douglass Bridge and other South Capitol Street improvements could move forward separately. But could a tunnel still work if the dream of dismantling the SE/SW Freeway were realized?
* I've tried to remain (mostly) unopinionated on various projects during the five years I've run this site. But sometimes, it's necessary to take a stand, to come out from behind the cloak of neutrality and crusade for what you believe in. So I'm going to take advantage of this bully pulpit and fight for one thing: Arched Bascule!
Comments (12)
   
 
 More Recent News

JDLand.com Home

Comments

Dave Carroll says: (3/8/08 12:15 PM)
Arched Bascule would be consistent with the rest of the city but I really liked the stayed bascule better.


Jason D says: (3/8/08 12:22 PM)
Cable-Stayed Swing, Cable-Stayed Swing, Cable-stayed Swing!!! I admire your opinion and live your site...but I just don't think we need *another* arched bridge. I like the idea that there could be different looks for the different waterfronts in town.
Thanks for all the hard work!


Otavio says: (3/8/08 12:50 PM)
I'm in the cable-stayed swing bridge camp! I like it, I like it a lot.

I love your site, JD! Thanks for the hard work.


JD says: (3/8/08 4:18 PM)
Bah! Dissent will not be tolerated! :-)


IMGoph says: (3/9/08 12:27 PM)
i told you if you opened this up to comments, you'd get some interesting discussions. i'm with otavio...cable stayed all the way (hey that rhymes! i should get it made into a t-shirt)

if that doesn't work, the retractile is pretty cool too! :)


Evan says: (3/9/08 12:33 PM)
Theres enough fake traditional stuff in this city, how about something innovative this time around, something iconic, not another arched bascule bridge that looks exactly the same as every other bridge in the area. Something that represents the promise and technological prowess of our time. Trying to keep a city looking like it's still in the past doesn't make a real world class city, its the ability to see a positive evolution.


GD says: (3/9/08 5:16 PM)
Does anyone else think the plan to cut two entrances in the brick wall running north of "The Yards" is inadequate? The wall kills all activity for two long blocks along M and I worry that without several large, welcoming entrances, those blocks will remain dead.

I'm sure "The Yards" developer is happy to keep people inside the compound, but I don't think this is responsible planning.

With some well matched, historically respectful archways the wall could become a well traveled gateway to the new riverfront.


rc says: (3/10/08 11:58 AM)
Cable-Stayed, it's atleast progressive looking. Lets move into the 21st century vs. adding yet another fake monumental feature.


JD says: (3/10/08 12:26 PM)
The problem I see with the cable-stayed bridge is that, while striking to look at, it's the only one of the four that puts the pedestrian/bike path in the middle of the bridge, instead of one on each side where pedestrians can actually see the vistas and not be dealing with cars and trucks on both sides of them:

link
(page 2-12 for cable-stayed, and pages 2-9 and 2-10 for the other three).

They also can't pick the cable stayed if they don't decide to do the oval at South Capitol and Potomac.

I *love* walking across the old fuddy-duddy arched bascule Memorial Bridge.


PK says: (3/10/08 2:44 PM)
Add me to the cable-stayed swing and stayed-bascule bridge groups, if just for the fact that they'll both complement the modern look of the baseball stadium. The arched bascule bridges around the city look great against the Lincoln Memorial and other landmarks nearby - why not pair Nationals Park with a fitting bridge? And while I totally see JD's point about the pedestrian/bike paths I hope they can modify those to sit on the outside of the roadway.


Douglas Willinger says: (3/10/08 5:52 PM)
A problem I see is that deleting the northbound ramp to I-395 will be done to accommodate new buildings alongside the SW/SE Freeway viaduct, thus making that freeway's future underground replacement far more difficult and expensive to construct.

The project is seriously flawed for not marking out the needed space for this future tunnel construction (for the SW/SE Freeway and a South Capitol Street tunnel), nor for ramp connections.


brad says: (3/11/08 1:50 PM)
Count me as another vote for the cable-stayed swing design. I echo the other sentiments that the area needs it own unique identity, and what better way than a signature bridge. As any Bostonian will tell you, the Zakim/Bunker Hill Bridge (also a cable-stayed design) has quickly become a defining feature of that city's skyline. I also support build alternative #2, with the oval being a big selling point.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

walt on August Tidbit Roundup: Well, I finally ate at El Bebe and loved their tacos.
GAK on Tidbits: WestHalf is now leasing and has floor plans and pricing posted on the website
GarfieldPark on Tidbits: DC Vedgefest was today @ Nats Park. A lot of people and a lot of vendors. Was de...
JD on Tidbits: There's been talk that Greystar was about to get in the ground to start work on ...
CJBabyDaddy on Tidbits: Pretty soon, the law needs to be that if they add another good restaurant a bloc...
JD on Tidbits: The Union Square Hospitality outpost at the new Thompson Hotel at 3rd and Tingey...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
150 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 08/18/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/15/19
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/15/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/15/19
100 B/O M ST SE   THEFT
Theft First Degree (purse-snatching)
 08/14/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/14/19
500 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/14/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/12/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/07/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/06/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/06/19
800 B/O VIRGINIA AVE SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 08/05/19
UNIT B/O N ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/04/19
400 B/O M ST SE   THEFT
Shoplifting
 08/01/19
900 B/O 3RD ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/26/19
600 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/25/19

Recent Issued Building Permits Archive  
1100 2ND PL SE   
08/06/19 
DC WATER / JEFF NOLD
AH1901095 / CONSTRUCTION
CCTV inspection of Sanitary Sewer sytem at the corner of 2nd Place and L Street SE.
808 3RD ST SE   
07/29/19 
LAURA R JENKINS / BRANDON K. VIERNES; BRANDON K. VIERNES
M1903669 / SUPPLEMENTAL
913 4TH ST SE   
08/07/19 
JANE SESSA / KYLE YOST; KYLE YOST
SOL1901388 / CONSTRUCTION
rooftop solar pv system, less than 4' above roof.
   
08/14/19 
JANE T SESSA / null
E1910482 / SUPPLEMENTAL
1331 4TH ST SE 719   
08/07/19 
null / NA NA NA
EHOP19936898 / HOME OCCUPATION
1346 4TH ST SE   
07/24/19 
FC 1346 HOLDCO I LLC / null
P1908097 / SUPPLEMENTAL
1346 4TH ST SE 20011   
08/16/19 
FC 1346 HOLDCO 1 LLC / null
E1910605 / SUPPLEMENTAL
312 K ST SE   
08/05/19 
HENRY LOWNDES MAURY TRUSTEES / null
E1910076 / SUPPLEMENTAL
   
08/07/19 
HENRY L MAURY / BJORN FALK; ANTHONY COLELLA
SOL1901686 / CONSTRUCTION
Install 6.54 solar PV system using 20 327-watt solar panels, roof mounted, with micro-inverters.
100 M ST SE   
07/23/19 
SQUARE 743 INC / STEPHANIE ERWIN; ORR PARTNERS
B1912550 / CONSTRUCTION
Existing office. Interior alteration and repair to include electrical and mechanical work. All interior work, no exterior work in permit scope.
   
07/29/19 
SQUARE 743 INC / KIM MITCHELL; MONUMENT REALITY
B1909745 / CONSTRUCTION
CONSTRUCTION OF OFFICE SPACE ON THE 7TH FLOOR - MULTI TENANT FLOOR IN AN EXISTING OFFICE BUILDING. THE SPACE IS IN SHELL CONDITION, NOT PREVIOUSLY OCCUPIED. THIS IS AN EXPANSION OF AN EXISTING TENANT ON THE 7TH FLOOR
   
08/06/19 
SQUARE 743 INC / PAUL THIEBERGER; PAUL THIEBERGER
P1908468 / SUPPLEMENTAL
   
08/16/19 
SQUARE 743 INC / BRIAN QUINN; NA
B1911537 / CONSTRUCTION
Interior renovation for new tenant in existing office space on partial area of the 9th floor.
300 M ST SE   
08/08/19 
FEDERAL CENTER LP / MIKE BOONE
AH1901148 / CONSTRUCTION
PEPCO-WO#15676746 / 02-ALLEN / CHESTER-CREWS WILL BE INSTALLING CABLE. 300 BLK M ST SE 400 BLK M ST SE 400 BLK TINGEY ST SE 1200 BLK 4TH ST SE THEY WILL BE TAKING PARKING LANE AND MIDDLE LANE M-F 11PM-7AM
800 NEW JERSEY AVE SE   
08/14/19 
NEW JERSEY AT H LLC / null
E1910458 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
08/07/19 
809-853 NEW JERSEY AVE ACQUISITION LLC / JOSEPH M MAGNOLIA; JOSEPH M MAGNOLIA
P1908508 / SUPPLEMENTAL
   
08/08/19 
GRAYSTAR GP 11,LLC / KIM MITCHELL
SH1900015 / CONSTRUCTION
Support of excavation for entire site for two below grade parking levels
   
08/14/19 
GRAYSTAR GP 11 LLC / MITCH A. PERMUY; MITCH A. PERMUY
E1910454 / SUPPLEMENTAL
   
08/14/19 
GRAYSTAR GP 11 LLC / MITCH A. PERMUY; MITCH A. PERMUY
E1910455 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 1ST FL   
07/23/19 
SQUARE 742 LLC / JAMES W LASHER; JAMES W LASHER
E1909662 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
07/26/19 
SQUARE 742 LLC / WILLIAM SNODDY; TBD
B1911194 / CONSTRUCTION
Tenant Finish Out. Existing Condition to be demolished and new office space built to tenant's standards. Office consists of open office and private offices.
   
07/30/19 
SQUARE 742 LLC / null
P1908231 / SUPPLEMENTAL
   
08/06/19 
SQUARE 742 LLC / ;
P1908470 / SUPPLEMENTAL
   
08/06/19 
SQUARE 742 LLC / null
M1903804 / SUPPLEMENTAL
520 TINGEY ST SE   
08/12/19 
US GENERAL SERVICES ADMINISTRATION / JOHN WICKLIFFE; NA
TN1900153 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed Aug 16, 2019 - Feb 9, 2020 Events Daily 8:00 am - 10:00 pm
227 TINGEY ST SE   
07/31/19 
UNITED STATES OF AMERICA / BILL SAUNDERS; BILL SAUNDERS
P1908289 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.