Sliding from Before to After
Just a bunch of tiny items worth highlighting on a dreary Saturday (no new photos today in this muck): * A building permit has been approved to build a surface parking lot along First Street between M and N, where Normandie Liquors and its brethren were demolished last month. And the Archdiocese of Washington has applied for a public space permit for the 1300 block of First Street, SE--does the Popemobile need special parking permits? * The 55 M web cam is no longer available to the public. Perhaps they want the Opening Day vista to be a big surprise. Or they don't want people watching the last-minute work on the Navy Yard Metro station. (I wonder if the gas main hit on Thursday was caught by this camera.) * Some commenters are discussing the idea that's been floated of someday demolishing the Southeast-Southwest Freeway. Getting rid of this Berlin Wall that separates Capitol Hill and Near Southeast (and splits Southwest) was brought up in the National Capital Planning Commission's 1997 Extending the Legacy framework plan, if you want to see it actually on paper. (Apparently an updated NCPC framework plan is scheduled to come out this spring, which looks like it continues to have Virginia Avenue marked where the freeway currently is.) As to whether I'll see this done in my lifetime, well, it would be a nice surprise. If you really want to go high-concept, you can read DDOT's 2003 South Capitol Street Gateway and Improvement Study to see their ideas for a tunnel that would link I-295 and the SE/SW Freeway for through traffic, leaving South Capitol Street to become the grand urban gateway boulevard planners envision. At Wednesday's public meeting on the South Capitol Street Draft Environmental Impact Statement, DDOT said that the tunnel isn't totally off the table, but they decided that a new Douglass Bridge and other South Capitol Street improvements could move forward separately. But could a tunnel still work if the dream of dismantling the SE/SW Freeway were realized? * I've tried to remain (mostly) unopinionated on various projects during the five years I've run this site. But sometimes, it's necessary to take a stand, to come out from behind the cloak of neutrality and crusade for what you believe in. So I'm going to take advantage of this bully pulpit and fight for one thing: Arched Bascule!
All posts:
55 M St., Boilermaker Shops/Yards, Factory 202/Yards, Foundry Lofts/Yards, Metro/WMATA, Monument Valley/Half St., South Capitol St., Douglass Bridge, Nationals Park, Traffic Issues, Square 701, The Yards, Twelve12/Teeter/Yards
JDLand.com Home
Dave Carroll says: (3/8/08 12:15 PM)
Arched Bascule would be consistent with the rest of the city but I really liked the stayed bascule better.
Jason D says: (3/8/08 12:22 PM)
Cable-Stayed Swing, Cable-Stayed Swing, Cable-stayed Swing!!! I admire your opinion and live your site...but I just don't think we need *another* arched bridge. I like the idea that there could be different looks for the different waterfronts in town.
Thanks for all the hard work!
Otavio says: (3/8/08 12:50 PM)
I'm in the cable-stayed swing bridge camp! I like it, I like it a lot.
I love your site, JD! Thanks for the hard work.
IMGoph says: (3/9/08 12:27 PM)
i told you if you opened this up to comments, you'd get some interesting discussions. i'm with otavio...cable stayed all the way (hey that rhymes! i should get it made into a t-shirt)
if that doesn't work, the retractile is pretty cool too! :)
Evan says: (3/9/08 12:33 PM)
Theres enough fake traditional stuff in this city, how about something innovative this time around, something iconic, not another arched bascule bridge that looks exactly the same as every other bridge in the area. Something that represents the promise and technological prowess of our time. Trying to keep a city looking like it's still in the past doesn't make a real world class city, its the ability to see a positive evolution.
GD says: (3/9/08 5:16 PM)
Does anyone else think the plan to cut two entrances in the brick wall running north of "The Yards" is inadequate? The wall kills all activity for two long blocks along M and I worry that without several large, welcoming entrances, those blocks will remain dead.
I'm sure "The Yards" developer is happy to keep people inside the compound, but I don't think this is responsible planning.
With some well matched, historically respectful archways the wall could become a well traveled gateway to the new riverfront.
rc says: (3/10/08 11:58 AM)
Cable-Stayed, it's atleast progressive looking. Lets move into the 21st century vs. adding yet another fake monumental feature.
JD says: (3/10/08 12:26 PM)
The problem I see with the cable-stayed bridge is that, while striking to look at, it's the only one of the four that puts the pedestrian/bike path in the middle of the bridge, instead of one on each side where pedestrians can actually see the vistas and not be dealing with cars and trucks on both sides of them:
link
(page 2-12 for cable-stayed, and pages 2-9 and 2-10 for the other three).
They also can't pick the cable stayed if they don't decide to do the oval at South Capitol and Potomac.
I *love* walking across the old fuddy-duddy arched bascule Memorial Bridge.
PK says: (3/10/08 2:44 PM)
Add me to the cable-stayed swing and stayed-bascule bridge groups, if just for the fact that they'll both complement the modern look of the baseball stadium. The arched bascule bridges around the city look great against the Lincoln Memorial and other landmarks nearby - why not pair Nationals Park with a fitting bridge? And while I totally see JD's point about the pedestrian/bike paths I hope they can modify those to sit on the outside of the roadway.
Douglas Willinger says: (3/10/08 5:52 PM)
A problem I see is that deleting the northbound ramp to I-395 will be done to accommodate new buildings alongside the SW/SE Freeway viaduct, thus making that freeway's future underground replacement far more difficult and expensive to construct.
The project is seriously flawed for not marking out the needed space for this future tunnel construction (for the SW/SE Freeway and a South Capitol Street tunnel), nor for ramp connections.
brad says: (3/11/08 1:50 PM)
Count me as another vote for the cable-stayed swing design. I echo the other sentiments that the area needs it own unique identity, and what better way than a signature bridge. As any Bostonian will tell you, the Zakim/Bunker Hill Bridge (also a cable-stayed design) has quickly become a defining feature of that city's skyline. I also support build alternative #2, with the oval being a big selling point.
Add a Comment:
Comments are closed for this post.
JDLand Comments RSS Feed
See All Current News Items |
Full Blog Archive
|
|
|
Full Neighborhood Development Map
There's a lot more than just the projects listed here. See the complete map of completed, underway, and proposed projects all across the neighborhood.
What's New This Year A quick look at what's arrived or been announced since the end of the 2018 baseball season.
Food Options, Now and Coming Soon
There's now plenty of food options in the neighborhood. Click to see what's here, and what's coming.
Anacostia Riverwalk
A bridge between Teague and Yards Parks is part of the planned 20-mile Anacostia Riverwalk multi-use trail along the east and west banks of the Anacostia River.
Virginia Ave. Tunnel Expansion
Construction underway in 2015 to expand the 106-year-old tunnel to allow for a second track and double-height cars. Expected completion 2018.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Canal Park
Three-block park on the site of the old Washington Canal. Construction begun in spring 2011, opened Nov. 16, 2012.
Nationals Park
21-acre site, 41,000-seat ballpark, construction begun May 2006, Opening Day March 30, 2008.
Washington Navy Yard
Headquarters of the Naval District Washington, established in 1799.
Yards Park
5.5-acre park on the banks of the Anacostia. First phase completed September 2010.
Van Ness Elementary School
DC Public School, closed in 2006, but reopening in stages beginning in 2015.
Agora/Whole Foods
336-unit apartment building at 800 New Jersey Ave., SE. Construction begun June 2014, move-ins underway early 2018. Whole Foods expected to open in late 2018.
New Douglass Bridge
Construction underway in early 2018 on the replacement for the current South Capitol Street Bridge. Completion expected in 2021.
1221 Van
290-unit residential building with 26,000 sf retail. Underway late 2015, completed early 2018.
NAB HQ/Avidian
New headquarters for National Association of Broadcasters, along with a 163-unit condo building. Construction underway early 2017.
Yards/Parcel O Residential Projects
The Bower, a 138-unit condo building by PN Hoffman, and The Guild, a 190-unit rental building by Forest City on the southeast corner of 4th and Tingey. Underway fall 2016, delivery 2018.
New DC Water HQ
A wrap-around six-story addition to the existing O Street Pumping Station. Construction underway in 2016, with completion in 2018.
The Harlow/Square 769N Apts
Mixed-income rental building with 176 units, including 36 public housing units. Underway early 2017, delivery 2019.
West Half Residential
420-unit project with 65,000 sf retail. Construction underway spring 2017.
Novel South Capitol/2 I St.
530ish-unit apartment building in two phases, on old McDonald's site. Construction underway early 2017, completed summer 2019.
1250 Half/Envy
310 rental units at 1250, 123 condos at Envy, 60,000 square feet of retail. Underway spring 2017.
Parc Riverside Phase II
314ish-unit residential building at 1010 Half St., SE, by Toll Bros. Construction underway summer 2017.
99 M Street
A 224,000-square-foot office building by Skanska for the corner of 1st and M. Underway fall 2015, substantially complete summer 2018. Circa and an unnamed sibling restaurant announced tenants.
The Garrett
375-unit rental building at 2nd and I with 13,000 sq ft retail. Construction underway late fall 2017.
Yards/The Estate Apts. and Thompson Hotel
270-unit rental building and 227-room Thompson Hotel, with 20,000 sq ft retail total. Construction underway fall 2017.
Meridian on First
275-unit residential building, by Paradigm. Construction underway early 2018.
The Maren/71 Potomac
264-unit residential building with 12,500 sq ft retail, underway spring 2018. Phase 2 of RiverFront on the Anacostia development.
DC Crossing/Square 696
Block bought in 2016 by Tishman Speyer, with plans for 800 apartment units and 44,000 square feet of retail in two phases. Digging underway April 2018.
One Hill South Phase 2
300ish-unit unnamed sibling building at South Capitol and I. Work underway summer 2018.
New DDOT HQ/250 M
New headquarters for the District Department of Transportation. Underway early 2019.
37 L Street Condos
11-story, 74-unit condo building west of Half St. Underway early 2019.
CSX East Residential/Hotel
225ish-unit AC Marriott and two residential buildings planned. Digging underway late summer 2019.
1000 South Capitol Residential
224-unit apartment building by Lerner. Underway fall 2019.
Capper Seniors 2.0
Reconstruction of the 160-unit building for low-income seniors that was destroyed by fire in 2018.
Chemonics HQ
New 285,000-sq-ft office building with 14,000 sq ft of retail. Expected delivery 2021.
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.
|
|
No records added or modified in the past two weeks. |
|
Recent Issued Building Permits
| Archive
|
|
1300 4TH ST SE 1001
|
|
02/22/21
AP BOWER RETAIL LLC / null
E2104231 /
SUPPLEMENTAL
|
1346 4TH ST SE APT 1M
|
|
02/06/21
null / NA NA NA
EHOP21945129 /
HOME OCCUPATION
|
1331 4TH ST SE R-2
|
|
02/08/21
FC 1331 LLC / FC 1331 LLC
BP2101814 /
POST CARD
|
10 I ST SE
|
|
02/16/21
CAPITOL HILL RACQUET CLUB / NA; VICTORIA STEINHOFF
SB2100112 /
CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
|
555 L ST SE
|
|
01/29/21
UNITED STATES OF AMERICA / RENNE WELL; RICK HARLAN SCHNEIDER
B2102004 /
CONSTRUCTION
DGS PROJECT REHABILITATION+RESTORATION OF THE HISTORIC LINCOIN FIELDHOUSE
|
861 NEW JERSEY AVE SE 20003
|
|
02/23/21
809-853 NEW JERSEY AVE ACQUISITION LLC / SUSANA VAZQUEZ
AH2100728 /
CONSTRUCTION
Dismantling of tower crane.
|
809 NEW JERSEY AVE SE
|
|
02/11/21
GREYSTAR GP LLC 809-853 NEW JERSEY AVENUE ACQUISITION LLC / null
E2103926 /
SUPPLEMENTAL
|
853 NEW JERSEY AVE SE
|
|
02/11/21
GREYSTAR GP LLC / null
E2103924 /
SUPPLEMENTAL
|
861 NEW JERSEY AVE SE
|
|
02/05/21
GS CSX HOTEL OWNER LLC / null
E2103762 /
SUPPLEMENTAL
|
1275 NEW JERSEY AVE SE
|
|
02/02/21
FC 1275 NJ LLC / null
E2103662 /
SUPPLEMENTAL
|
|
|
02/11/21
FC 1275 NJ LLC / null
P2103445 /
SUPPLEMENTAL
|
848 SOUTH CAPITOL ST SE
|
|
02/16/21
CXS TRANSPORTATION INC / VICTORIA STEINHOFF; TBD
SB2100111 /
CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
|
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;
|
|
|
No commercial transaction records added or modified in the past two weeks. |
|
|