Since January, 2003
            
 (a random before-and-after moment)
December 2, 2004
March 28, 2015
Half at L, Looking West-Northwest (see more)

A slew of site plans and renderings showing the designs for the Waterfront Park at the Yards have now entered into the public record, thanks to requirements that early designs (35%) be shown to the National Capital Planning Commission. The NCPC will be voting on the designs at this Thursday's meeting, and NCPC staff is recommending is that they be approved.
The staff recommendation document is must reading for anyone interested in the park, as it lays out many of the plans for the 5.5-acre site. There will be a huge "Great Lawn" on the western portion of the site (south of what will be an extended Second Street). The currently existing inlet will be extended northward for a shallow "Canal Basin", with an elaborate pedestrian bridge above it. The designs also show the basic location of piers, marinas, and a water taxi stand (cue Nats fans salivating), although the review of their designs will come later. The existing Lumber Storage Shed (Building 173) will be renovated into glass-enclosed retail and entertainment offering, and two other buildings will eventually come to the park as well. At the eastern end will be a "River Garden", a shadier, more lush area of greenery. There will also eventually be some sort of "vertical iconic element" erected on the pier at Third Street, but no details are yet divulged.
It's estimated that the park will open in 2010. I have some photos of what the park area looks like now, and have also included a few of the new renderings, but it's been a tough spot to get to over the years. (If your browser doesn't jump you to the right place, scroll to the bottom of the page. I'm gonna have to revamp my Yards stuff--it's too much going on to try to shoehorn into my current design scheme!)
UPDATE: I should also mention, for those of you interested in parking issues, that blacktop is now being put down on the open lot at The Yards south of Tingey between New Jersey and Third.....
Comments (1)
   
 
 More About Yards Park

JDLand.com Home

Comments

G St Person says: (2/4/08 10:14 AM)
Nice page here JD:

link

Can now envision what they're trying to eventually do...

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

202_cyclist on Tidbits: SWneighbor— here is the company that provides the balloons for construction phot...
202_cyclist on Tidbits: https://gizmodo.com/up-in-the-air-using-tethered-balloons-to-photograph-th-15688...
SWneighbor on Tidbits: What is a construction blimp?
GarfieldPark on Tidbits: UPS store is a great addition to the hood, one that I wouldn't even have thought...
walt on Tidbits: Anybody have any hints/advice for going to watch the Apollo 50 display tonight o...
walt on Tidbits: Tried El Bebe last night and I was FLOORED by how good the cauliflower taco was....
  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/18/19
1000 B/O 5TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/17/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/17/19
1400 B/O SOUTH CAPITOL ST   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/16/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/15/19
100 B/O H ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/14/19
300 B/O TINGEY ST SE   ASSAULT WITH A DANGEROUS WEAPON  07/14/19
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 07/09/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/09/19
1100 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 07/08/19
300 B/O K ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/05/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/03/19
1200 B/O VAN ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/02/19
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/02/19
54 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/28/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/24/19
300 B/O K ST SE   HOMICIDE
Murder I
 06/22/19
50 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/21/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/21/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/20/19
100 B/O H ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 06/19/19
400 B/O M ST SE   THEFT
Shoplifting
 06/19/19

Recent Issued Building Permits Archive  
1100 2ND PL SE   
06/25/19 
SQUARE 769N OWNER LLC / THANOS VOREAS
EG1903573 / POST CARD
1212 4TH ST SE   
06/27/19 
FC 1212 LLC / MARK J. RHOTON
E1908902 / SUPPLEMENTAL
1000 5TH ST SE   
07/10/19 
JW ELECTRIC SERVICE / null
E1909222 / SUPPLEMENTAL
   
07/03/19 
UNITED STATES OF AMERICA / TANYA HILL; ALI NAIM
B1911904 / CONSTRUCTION
INSTALL NEW PARTITION AND DOOR IN EXISTING CLASSROOM TO MAKE TWO CLASSROOMS.
100 M ST SE   
07/12/19 
SQUARE 743 INC / KIM MITCHELL
D1900787 / CONSTRUCTION
INTERIOR DEMOLITION WITHIN AN OFFICE SPACE ON THE 9TH FLOOR (MULTI-TENANT FLOOR) IN AN EXISTING OFFICE BUILDING
250 M ST SE   
06/26/19 
BAKER DC LLC / CHRISTINE LONG
AH1901008 / CONSTRUCTION
An after hours permit is respectfully requested from 3AM to 7AM daily
   
07/17/19 
BAKER DC LLC / CHRISTINE LONG
AH1901077 / CONSTRUCTION
An after hours permit is respectfully requested from 3AM to 7AM daily
139 N ST SE 20024   
07/12/19 
UNITED STATES OF AMERICA / PAUL E WARREN; PAUL E WARREN
E1909292 / SUPPLEMENTAL
640 SOUTH CAPITOL ST SE   
07/12/19 
CONSOLIDATED RAIL CORPORATION / HARIF BALOGUN; GEOCAPITAL ENGINEERING LLC GEOCAPITAL ENGINEERING
SB1900354 / CONSTRUCTION
We propose drilling six (6), six-inch diameter geotechnical test borings (B-1 to B-6) using the hollow stem auger method to evaluate the subsurface conditions. The proposed test boring depths will be 85 feet below the existing ground surface. If a confining unit is encountered, outer casing will be installed which will extend 10 feet into the top of the confining unit or to the top of bedrock.
300 TINGEY ST SE 170   
07/09/19 
FC BOILERMAKER LLC / GERALD ROPER
B1814633 / CONSTRUCTION
INTERIOR DEMOLITION AND RENOVATION ONLY. DEMOLITION TO INCLUDE REMOVAL OF EXISTING PARTITIONS, KITCHEN EQUIPMENT, AND FINISHES. NEW WORK TO INCLUDE NEW PARTITIONS, MILLWORK, FINISHES, KITCHEN EQUIPMENT (INCLUDING 1 NEW HOOD), AS WELL AS MINOR INTERIOR-ONLY MECHANICAL AND ELECTRICAL MODIFICATIONS. HVAC EQUIPMENT ON EXISTING OUTDOOR MECHANICAL MEZZANINE TO REMAIN. NO MODIFICATIONS TO EXISTING HISTO...
   
07/16/19 
FC BOILERMAKER LLC / HEE YEOL HWANG; HEE YEOL HWANG
E1909416 / SUPPLEMENTAL
   
07/17/19 
FC BOILERMAKER LLC / ;
P1907864 / SUPPLEMENTAL
300 TINGEY ST SE   
06/26/19 
FC BOILERMAKER LLC / ADAM C. MARSON
M1903231 / SUPPLEMENTAL
   
07/12/19 
FC BOILERMAKER LLC / DOMINIC E TOTARO; DOMINIC E TOTARO
M1903450 / SUPPLEMENTAL
   
07/15/19 
FC BOILERMAKER LLC / HEE YEOL HWANG; HEE YEOL HWANG
E1909370 / SUPPLEMENTAL
   
07/18/19 
FC BOILERMAKER LLC / ;
P1907922 / SUPPLEMENTAL
355 WATER ST SE   
07/10/19 
UNITED STATES OF AMERICA / JOHANNA DELONY
TN1900122 / CONSTRUCTION
Sterne Kessler Crab Feast--1 40'x 100' tent, with 372' of white picket fencing; no generators.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.