Since January, 2003
            
 (a random before-and-after moment)
March 22, 2007
January 5, 2019
1 1/2 at N, Looking East-Southeast (see more)

The Washington Times reports on what's left to be done at the ballpark: "There are 66 days left until the Nationals open the new ballpark with an exhibition game against the Baltimore Orioles on March 29. Opening Day follows the next evening, with a nationally televised game against the Atlanta Braves.
But much work still remains to be done, particularly on the portions of the stadium not immediately visible to passers-by on South Capitol Street. [... ] In theory, baseball could be played at the new ballpark now. The field is in place, nearly all the seats have been installed, and team clubhouses and the press box are nearing completion. Heavy work remains, however, on the concession and food-service areas, offices, control rooms and team store."
Some things might not be ready by Opening Day, though: "Mr. Haas and Mr. O'Dell acknowledged that some work on the stadium will continue even after the season begins. A video board the Nationals requested be installed in center field may not be ready, and some areas will lack final coats of paint and finishes. Sculptures and other artwork will be midseason additions." But, the last word from Stan: " 'I promise you that with two weeks left, in the middle of March, people are going to look at [the ballpark] and say, 'I don't see how it's going to be done,' ' Nationals President Stan Kasten said. 'But it will be done.' "
And, repeating this from last night, Wednesday's Post has a piece about how the architects of the ballpark have worked to bring the stadium from paper to reality.
Comments (0)
   
 
 More About Nationals Park
 All posts: Nationals Park

JDLand.com Home

Comments

No comments posted.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

VelocityChris on Some Details on: I'll take it! (Wells Fargo ATM)
RMP on Some Details on: My guess is that an "Express Center" is a room with ATMs and no humans...
202_cyclist on Some Details on: Well, not every retail space can be a dry cleaners or a CVS...
JD on Some Details on: Skanska announces that a "Wells Fargo Express Center" is coming to its 99 M offi...
JES on Some Details on: @RMP I don't count Bardo since it's temporary (and sucks, lol). GB does brew on ...
202_cyclist on Some Details on: @malatesta— The buffoon Chris Otten?
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1300 B/O WATER ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/18/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/17/19
400 B/O 2ND ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 02/16/19
70 B/O I ST SE   ASSAULT WITH A DANGEROUS WEAPON  02/15/19
500 B/O L ST SE   ROBBERY  02/14/19
1400 B/O SOUTH CAPITOL ST   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 02/13/19
1100 B/O 2ND PLACE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 02/13/19
200 B/O I ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 02/13/19
200 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/11/19
100 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/10/19
500 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 02/09/19
1200 B/O HALF ST SE   THEFT
Theft First Degree (theft From Building)
 02/07/19
300 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 02/07/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/05/19
1000 B/O 8TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 02/04/19
1100 B/O 1ST ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 02/02/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/25/19
900 B/O M ST SE   ROBBERY  01/25/19
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/24/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/24/19

Recent Issued Building Permits Archive  
1331 4TH ST SE CU   
01/25/19 
FC 1331 LLC / BEN BEDDO
TL1900054 / CONSTRUCTION
First Extension to TL1700205, to Expire on 06 / 28 / 2019. Original Scope: New Tenant Layout for restaurant
4 I ST SE   
01/31/19 
USGBF WATERFRONT STATION LLC / TAMIKA STATON; OTIS
EN1900813 / SHOP DRAWING
Install 2 New Elevators - 3500LBS @ 350FPM
   
01/31/19 
USGBF WATERFRONT STATION LLC / TAMIKA STATON; OTIS
EN1900814 / SHOP DRAWING
Install 1 New Elevator - 4000LBS @ 350FPM
2 I ST SE   
01/28/19 
MCDONALDS CORPORATION / ROGER LEE MOORE
M1901295 / SUPPLEMENTAL
   
01/30/19 
MCDONALDS CORPORATION / null
E1903887 / SUPPLEMENTAL
150 I ST SE   
01/31/19 
WILLIAM C SMITH CO / TAMIKA STATON; OTIS
EN1900205 / SHOP DRAWING
Install 1 New Elevator - 3500LBS @ 350FPM
   
01/31/19 
WILLIAM C SMITH CO / TAMIKA STATON; OTIS
EN1900206 / SHOP DRAWING
Install 2 New Elevators - 3500LBS @ 350FPM
   
01/31/19 
WILLIAM C SMITH CO / TAMIKA STATON; OTIS
EN1900207 / SHOP DRAWING
Install 1 New Elevator - 3500LBS @ 350FPM
   
01/31/19 
WILLIAM C SMITH CO / TAMIKA STATON; OTIS
EN1900208 / SHOP DRAWING
Install 1 New Elevator - 4000LBS @ 350FPM
   
01/31/19 
WILLIAM C SMITH CO / TAMIKA STATON; OTIS
EN1900209 / SHOP DRAWING
Install 1 New Elevator - 3500LBS @ 200FPM
   
02/04/19 
SQUARE 737 LLC / RUSSELL M COX
B1904148 / CONSTRUCTION
THIS PERMIT SERVES AS A REVISION TO B1709058 FOR ELEVATOR REVIEW ONLY
   
02/19/19 
SQUARE 737 LLC / DANIEL R. RUDE
P1903909 / SUPPLEMENTAL
(4) Fire pits (1) Water Coolers (4) Rooftop units Sanitary piping, Storm piping
250 M ST SE   
01/29/19 
SQ 769 LLC / ILAKKIYA THAMBI
AH1900470 / CONSTRUCTION
Requesting after hour permit to CCTV the sewers
   
02/01/19 
SQ 769 LLC / ILAKKIYA THAMBI
AH1900481 / CONSTRUCTION
After hour permit to CCTV the sewers
   
02/15/19 
SQUARE 769 LLC / STEVEN CHEN
AH1900542 / CONSTRUCTION
After Hours Permit - Drilling of Piles
   
02/15/19 
SQUARE 769 LLC / JENSEN HUGHES
MVQ1900481 / CONSTRUCTION
NFPA 20 2010 EDITION, SECTION 4.12.2.1.1 AS REFERENCED BY 2012 IBC CODE SECTION 913.1. BUILDING PERMIT B1813732
861 NEW JERSEY AVE SE   
02/05/19 
CONSOLIDATED RAIL CORPORATION / THOMAS M. KESSLER
P1903515 / SUPPLEMENTAL
(2) Gas generators
520 TINGEY ST SE   
02/01/19 
BROOKFIELD PROPERTIES / MAHMOUD KHACHAN
SB1900114 / CONSTRUCTION
Three soil borings, six-inch diameter, 25 feet deep.
227 TINGEY ST SE   
01/31/19 
FOREST CITY WASHINGTON / TAMIKA STATON; OTIS
EN1900809 / SHOP DRAWING
Install 1 New Elevator - 3500LBS @ 350FPM
   
01/31/19 
UNITED STATES OF AMERICA / TAMIKA STATON; OTIS
EN1900802 / SHOP DRAWING
Install 1 New Elevator - 3500LBS @ 350FPM
   
01/31/19 
UNITED STATES OF AMERICA / TAMIKA STATON; OTIS
EN1900803 / SHOP DRAWING
Install 1 New Elevator - 3500LBS @ 350FPM
   
01/31/19 
FOREST CITY WASHINGTON / TAMIKA STATON; OTIS
EN1900807 / SHOP DRAWING
Install 1 New Elevator - 3500LBS @ 350FPM
   
01/31/19 
UNITED STATES OF AMERICA / TAMIKA STATON; OTIS
EN1900808 / SHOP DRAWING
Install New Elevator - 4000LBS @ 350FPM
   
01/31/19 
UNITED STATES OF AMERICA / TAMIKA STATON; OTIS
EN1900799 / SHOP DRAWING
Install 1 New Elevator - 3500LBS @ 200FPM
   
01/31/19 
UNITED STATES OF AMERICA / TAMIKA STATON; OTIS
EN1900800 / SHOP DRAWING
Install 1 New Elevator - 3500LBS @ 200FPM
   
01/31/19 
FOREST CITY WASHINGTON / TAMIKA STATON; OTIS
EN1900806 / SHOP DRAWING
Install 2 New Elevators - 3500LBS @ 200FPM
   
02/08/19 
UNITED STATES OF AMERICA / DFM DEVELOPMENT SERVICES, LLC
B1901392 / CONSTRUCTION
Yards Parcel L1 - Revision to Building Permit # B1801074 to add build-out of hotel restaurants and bars, and to incorporate changes required by DC Water. Includes 1st floor restaurant with 132 indoor seats and 48-seat Summer Garden;1st floor bar with 59 seats and 24-seat Summer Garden; Rooftop Bar with 48 indoor seats; Rooftop restaurant with 67 indoor seats and 48-seat Summer Garden. TPR
   
02/08/19 
FOREST CITY WASHINGTON / DFM DEVELOPMENT SERVICES, LLC
AH1900513 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of dismantling the tower crane on private property. Work to take place Friday, 2 / 8 / 19 and Saturday 2 / 9 / 19 between 7pm-10pm as well as Sunday, 2 / 10 / 19 between 10am-7pm.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
1117 3RD ST SE   12/06/18
$ 5,000,000
SQUARE 769 LLC WILLIAM C SMITH & CO INC
 


Project Directory
Completed
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.