At Monday night's ANC 6D meeting, Monument Realty presented its request for the ANC's support in closing a 2,417-square-foot alley that runs between South Capitol and Van streets not far north of N Street. This alley is north of the now-closed BP Amoco and south of what is now a WMATA employee parking lot on land owned by Monument (there used to be a neon yellow bungalow there, until late 2006). Christy Shiker of Holland & Knight told the commissioners that the Amoco property--which faces the ballpark's western parking garage--is too small to develop on its own, but with the alley closed and the lots combined, Monument would build a 130-foot-high residential building with approximately 150 to 200 units plus 14,000 square feet of ground-floor (or perhaps two-story) retail. Monument is not committing at this time to pursuing LEED certification for this building.
Shiker then described the community benefits package that Monument was offering to the ANC in return for the loss of this public space, including a $50,000 contribution to the community fund, the retail, First Source employment preferences, and an affordable housing component that would match whatever is called for whenever the city's Inclusionary Zoning mandates are finally hammered out. Monument would also work toward agreements on ANC6D resident preferences, to be determined with the ANC at a later date.
This became a sticking point, with Commissioner David Sobelsohn concerned about giving the ANC's support for this project merely on promises to make agreements later. Shiker pointed out that Monument has made these agreements before for their other Ballpark District projects, and also that the ANC will have another crack at the project when down the road it undergoes its mandatory Capitol Gateway Overlay Review. But Sobelsohn still felt that the ANC was being handed a "take it or leave it" proposition.
An audience member asked if Monument would be planning to build a temporary parking lot if the alley closing is approved, but Shiker said that Monument's goal is to develop the land, that they "want a building, not a parking lot." (Though one must admit that that is some pretty plum stadium-parking territory.) There were also questions about the Public Space Storage building just to the north (echoing my WTDW entry from last week), but Monument's representatives said that they didn't think the storage company would be moving.
Commissioner Bob Siegel moved to support the alley closing with further negotiations on the proposed benefits package as the project proceeds, but the ANC voted 2-2-1 and so the resolution did not pass.
The alley closing bill is B17-0552, and Shiker told the ANC that she expected a public hearing in late February, with perhaps council action in March or April. No date for actual construction of the project was mentioned.
Coming tomorrow--a recap of the Florida Rock portion of the ANC meeting, though you don't have to wait until then to see the latest project renderings that were presented. But my long-winded summary of what was said during the meeting will have to wait a bit longer.
Comments (0)
   
 
 More About Monument Valley/Half St.

JDLand.com Home

Comments

No comments posted.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

jdc on Roundup of Some: Being able to walk to Silver Diner is nice. I miss my routine of taking the morn...
JES on Roundup of Some: omg i would kill for a silver diner...
conngs0 on Roundup of Some: sharksfansd, I agree the Peet's closure is a shame as it was a solid option. No...
sharksfansd on Roundup of Some: Such a bummer about Peet's, as it was my go to instead of the other large coffee...
GG on Roundup of Some: So what’s the story with the CVS at Half and I? It’s looked fully stocked and r...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
100 B/O I ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/30/20
100 B/O O ST SE   ASSAULT WITH A DANGEROUS WEAPON  07/28/20
400 B/O M ST SE   THEFT
Shoplifting
 07/24/20
100 B/O M ST SE   BURGLARY
Burglary Two
 07/20/20
UNIT B/O N ST SE   ASSAULT WITH A DANGEROUS WEAPON  07/20/20
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/13/20
900 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/09/20
1500 B/O 1ST ST SE   SEX ABUSE
Assault W/intent To Commit First Degree Sexual Abuse (force) (rape)
 07/08/20
400 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/06/20
1200 B/O HALF ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/05/20
100 B/O H ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/03/20
100 B/O O ST SE   ROBBERY  07/03/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 1001   
07/22/20 
LA FAMOSA / null
E2009613 / SUPPLEMENTAL
1300 4TH ST SE 130   
07/24/20 
TOM AN / KIMOY LALLEMENT
A2005055 / CONSTRUCTION
New sail shade awning at exterior private space of La Famosa restaurant (Permit #TL2000028)
900 5TH ST SE   
07/13/20 
null
B1906215-EXT-1 / CONSTRUCTION
1ST EXTENSION TO B1906215, EXTENSIOIN WILL EXPIRE ON 03 / 01 / 2020. ORIGINAL SCOPE: Reconstruction of 4-story residential building, the Arthur Capper Senior Center, damaged by fire.
1150 5TH ST SE   
07/08/20 
DISTRICT OF COLUMBIA / CASEY STRINGER; NA
B2008863 / CONSTRUCTION
DGS PROJECT Minor interior classroom renovations at existing school
   
07/16/20 
DISTRICT OF COLUMBIA / null
P2007453 / SUPPLEMENTAL
   
07/22/20 
DISTRICT OF COLUMBIA / null
E2009571 / SUPPLEMENTAL
10 I ST SE   
07/27/20 
CAPITOL HILL RACQUET CLUB / ANDREW ARNOLD; NA
SB2000413 / CONSTRUCTION
We propose drilling two (2), six-inch diameter geotechnical test borings (B-7 and B-8) using the hollow stem auger method to evaluate the subsurface conditions. The proposed test boring depths will be 85 feet below the existing ground surface. If a confining unit is encountered, outer casing will be installed which will extend 10 feet into the top of the confining unit or to the top of bedrock. Up...
423 L ST SE   
07/24/20 
JOHN P LANG / MARGO RICKS
SOL2001665 / CONSTRUCTION
To install 4.56 kW size of solar panels with a system height of 1.1 feet on roof of building.
250 M ST SE   
07/10/20 
SQUARE 769 LLC / null
E2009225 / SUPPLEMENTAL
   
07/21/20 
SQUARE 769 LLC / null
E2009527 / SUPPLEMENTAL
300 M ST SE   
07/27/20 
FEDERAL CENTER LP / null
E2009758 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
07/23/20 
GREYSTAR GP LLC / null
M2003144 / SUPPLEMENTAL
1105 NEW JERSEY AVE SE   
07/23/20 
GALLERY CAPITAL RIVERFRONT PROPERTY LLC / null
E2009620 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
07/08/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
M2002985 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 20590   
07/14/20 
JBG/FEDERAL CENTER LLC / SAM HOLLEN
B2006851 / CONSTRUCTION
INTERIOR RENOVATION TO 1ST FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING. NO STRUCTURAL. 1700 SQUARE FEET. GSA / DOT
1275 NEW JERSEY AVE SE   
07/13/20 
FC 1275 NJ, LLC / PARKER HARRELL
SB2000382 / CONSTRUCTION
We are abandoning 14 gravel packed dewatering wells and one piezometer. All pumps and associated hardware will be removed from the wells. Each well casing will then be removed of perforated. We will then tremie each borehole using a bentonite slurry (two pounds bentonite powder to one gallon water).
1033 O ST SE 20374   
07/13/20 
UNITED STATES OF AMERICA / STANELY CARPENTER; JILL S CUTLER
BCIV2000111 / CONSTRUCTION
Install a safety shower and eye-wash station with a concrete base at the hazardous waste storage area near Building 166 at the Washington Navy Yard.
79 POTOMAC AVE SE 505   
07/15/20 
null / NA NA NA
EHOP20993669 / HOME OCCUPATION
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.