Since January, 2003
            
 (a random before-and-after moment)
September 22, 2004
August 3, 2008
South Capitol at P, Looking South-Southwest (see more)

Your morning linkage:
* The Washington Times has "Parking a National Crisis", detailing what it considers to be the daunting challenges of getting to Nationals Park this year: "[The Nationals reported] that there barely will be enough parking spots (5,000) to accommodate season-ticket holders and that holders of single-game tickets probably won't find any spots in the neighborhood at all. That leaves walk-up fans and holders of single-game tickets with two choices: take the Metro or park at RFK Stadium and hop on the free shuttle. Now, neither of those options sounds all that terrible. But it's easy to envision thousands of stubborn (or clueless) fans driving to Southeast in their cars only to end up circulating around like Chevy Chase in 'National Lampoon's European Vacation.' "
You might want to read my detailed post on Friday's hearing as well as my Stadium FAQ's sections on transit and parking, for more information on the current state of ballpark-related transportation and parking issues. Also, I've posted a shiny new map showing the four zones where the Nationals are offering season-ticket-holder parking, along with the lots that may or may not end up being ones that the team has contracted with. Not an official map, just showing what's out there.
And, two items outside my purview from the past few days, but big enough to worth noting:
* Financing plans to move the redevelopment of the Southwest Waterfront have emerged, with the mayor seeking to provide up to $200 million in TIF and PILOT financing; the city also has agreed to lease 15 acres of land along the waterfront to developers (Hoffman-Struever Waterfront LLC). Here's the Post on the news and concerns about so much public financing as the real estate market appears to be teetering, as well as article by the Washington Business Journal and the city's press release.
* Last week the city dropped the group led by Mid-City Urban from the short list of developers who could be awarded Poplar Point, leaving three teams in the running, two of which include a soccer stadium as an optional part of their designs. (Mid-City's design was the one that included the "aerial tram" across the Anacostia to carry passengers to Near Southeast.) The city issued a press release about the narrowing of the short list last week, and Post wrote about the status of the competition on Monday. The city could name the development partner next week. Near Southeast behemoth Forest City (of The Yards and the Capper redevelopment, as well as the Waterside Mall project in SW) is one of the remaining three teams. You can see more about the proposals at And Now, Anacostia (which also got mentioned in the Post article).
Comments (1)
   
 
 More About Nationals Park
 All posts: parking, Nationals Park

JDLand.com Home

Comments

Bradley Comar says: (1/16/08 12:59 PM)
Wow! I did not know that the city was trying to do a new waterfront in the SW. All this time, I thought people were just talking about that outdoor mall on M St with the Safeway store. I assume that the city with try to connect this SW walkway with the walkway by the stadium and behind the Navy Yard ...and eventually all the way up to RFK. That would be wonderful!!!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News
  

Snacks on A Photo Tour: Have been to one soccer game for DC United. It was a fun time, had great weather...
202_cyclist on A Photo Tour: JD- I hope your recovery continues apace and you'll be off the 60-day disabled ...
dude on A Photo Tour: @202, yes you could say that about 70I. Also, I'm not a huge soccer fan (I thin...
spiritequality on Tuesday Tidbits: @cjbabydaddy Thanks for the tip in where to look for movie theater info. Hope th...
Message Board (beta)

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/15/18
1000 B/O 3RD ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/07/18
1300 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/21/18

Recent Issued Building Permits Archive  
1331 2ND ST SE 20003   
01/29/18 
DC WATER / DAVE LEVINE
AH1800505 / CONSTRUCTION
After hours work for structure exaction and support for B1311474 DC Water. Corman Construction 202-863-0052.
1016 3RD ST SE   
02/01/18 
ANAMARIA R MOTTOLA / DAVID L. HAHN
P1803348 / SUPPLEMENTAL
1346 4TH ST SE   
02/06/18 
ALAN OWINGS / ROBERT SEV HENRY
AH1800541 / CONSTRUCTION
After Hours Permit for 2 / 19 / 18 from 7AM to 7PM to perform concrete, framing, and utility operations.
   
02/06/18 
FC 1346 LLC / RICHARD V CAREY
P1803428 / SUPPLEMENTAL
150 I ST SE   
02/05/18 
WC SMITH / null
P1803402 / SUPPLEMENTAL
140 M ST SE   
02/07/18 
SPAULDING & SLYE/STE100 / null
E1803798 / SUPPLEMENTAL
110 M ST SE   
01/29/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / JAMES WEAVER
E1803534 / SUPPLEMENTAL
   
02/02/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
P1803361 / SUPPLEMENTAL
140 M ST SE 20032   
02/14/18 
SYLVIA LINDSEY / null
P1803641 / SUPPLEMENTAL
202 M ST SE   
01/29/18 
UNITED STATES OF AMERICA / NURI EROL
D1800281 / CONSTRUCTION
Remove Existing flooring. Remove some of the furnitures, equipment.
300 M ST SE 53533   
02/08/18 
FEDERAL CENTER LP / SPENCER TEEL
BP1801893 / POST CARD
401 M ST SE   
01/30/18 
DOEE C/O DEV MURALI / JESSICA REICHARD
AH1800507 / CONSTRUCTION
After hours permit to preform manhole inspections during off peak hours 7pm - 7am for all Manhole Locations covered under permit # PA10374319-R1 for DOEE Anacostia river sediment project.
861 NEW JERSEY AVE SE   
01/21/18 
CONSOLIDATED RAIL CORPORATION / null
P1802976 / SUPPLEMENTAL
   
01/31/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION, INC.
AH1800467 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.***TO EXCLUDE LEGAL HOLIDAYS**
1100 NEW JERSEY AVE SE 2ND FL   
02/09/18 
SQUARE 742 LLC / null
P1803534 / SUPPLEMENTAL
   
02/14/18 
SQUARE 742 LLC / null
P1803681 / SUPPLEMENTAL
79 POTOMAC AVE SE   
01/22/18 
RIVERFRONT HOLDINGS I LLC / JUSTIN BELLOW
TL1800010 / CONSTRUCTION
1st time tenant layout for restaurant with 212 indoor seats and 350- indoors occupant load. 338 outdoor seats 550 outdoors occupant load.
640 SOUTH CAPITOL ST SE   
02/05/18 
JIM LATISIS ZAYO GROUP
B1707197 / CONSTRUCTION
Addition to existing concrete telecom building.
401 TINGEY ST SE   
01/30/18 
PEPCO / BARBARA ANN STEDMAN
AH1800520 / CONSTRUCTION
UG TRANSFORMER WORK TO BE PERFORMED ON THE 400 BLK OF TINGEY ST SE. MANHOLE ACCESS. WORK TO BE PERFORMED BETWEEN THE HOURS OF 7:30AM AND MIGHTNIGHT ON 1 / 30 / 18 AND 1 / 31 / 18.
227 TINGEY ST SE   
01/29/18 
UNITED STATES OF AMERICA / ERICKA CLARK
TC1800021 / CONSTRUCTION
2 tower cranes
   
01/30/18 
FOREST CITY WASHINGTON / MELISSA DIAZ
B1802750 / CONSTRUCTION
Revision to Permit SH1700028. Sheeting and shoring for Yards Parcel L-2 project. Revision includes 10-foot precut excavation and layback on Water Street, 3rd Street and northern L-1 elevations, and removal of upper tier of rakers at L-1 elevation and upper tier of tiebacks at the Water Street and 3rd Street elevations.
325 VIRGINIA AVE SE 20003   
02/14/18 
JASON W GOLDSMITH / null
E1804039 / SUPPLEMENTAL
325 VIRGINIA AVE SE   
02/06/18 
JASON W GOLDSMITH / CRAIG HARTSOCK
B1804721 / CONSTRUCTION
Remove two non-structural walls on ground level of townhouse and re-frame in new configuration to create a full bathroom on ground floor.
   
02/07/18 
JASON W GOLDSMITH / MORIS O. OCHOA PINEDA
P1803462 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
1001 NEW JERSEY AV SE   12/28/17
$ 687,365
WHATS ON SECOND PROPERTIES LLC
 


Project Directory
Completed
Agora ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.